Skip to main content
4.9/5 from 500+ Malaysians

Malaysia's first app to Buy Solar

Order a complete, installed solar system online - no salesmen, no guesswork. Get an instant quote and start saving up to RM 10,000 a year on your TNB bill.

Solar Panel Malaysia pricing, Solar ATAP eligibility, and TNB savings estimates by Trexon Energy.

NSRMZ+

500+ systems installedacross Peninsular & East Malaysia

Instant savings estimate

Live
RM 500
RM 150RM 3,000
Monthly savings
RM 450
Recommended
10.54 kWp
Payback
3.6 yrs
25-yr savings
RM 155,250

Indicative only. Final quote confirmed after a free roof check.

Get my full quote
Tier-1 hardware partners
Trina Solar
Jinko Solar
Sungrow
Huawei
Solis
SEDA RegisteredLicensed PV investor & installer
TNB & Solar ATAPNet-metering approved
ISO 9001Quality-certified installs
MyHIJAU ListedGreenTech Malaysia directory
RM50M+

Customer savings to date

495+

Systems installed

25yr

Warranty coverage

89%

Typical bill reduction

Start to finish

Go solar in days, not months

We streamlined the entire journey, from a 30-second quote to a metered, money-saving system on your roof.

Step 1

Get an instant quote

Enter your monthly bill and get accurate, bankable pricing in 60 seconds.

Step 2

Upload your documents

Submit your IC and electricity bill. We handle every SEDA and TNB form.

Step 3

Start saving

Power on after install and track every ringgit through your Trexon dashboard.

Project preview

Solar ATAP approved

Ready

Approval

Submitted

Install

1-2 days

Savings

RM 450/mo

See the full process
Best packages

Pick the system that fits your bill

Every package includes SEDA/TNB paperwork, inverter, mounting, wiring, Tier-1 solar panels, and installation.

Solar Starter

Homes with RM 300-450 monthly bills

From

RM569/month

RM 20,499 upfront package

Size
6.82 kWp
Panels
11
Save
RM 390/mo
  • ~4.4 year payback
  • Tier-1 solar panels
  • Solis smart inverter
  • Solar ATAP / NEM application
  • 25-year panel warranty
Get this system
Most popular

Solar Plus

Homes with RM 450-650 monthly bills

From

RM639/month

RM 22,999 upfront package

Size
8.68 kWp
Panels
14
Save
RM 496/mo
  • ~3.9 year payback
  • Tier-1 solar panels
  • Solis smart inverter
  • Solar ATAP / NEM application
  • 25-year panel warranty
Get this system

Solar Pro

Homes with RM 650+ monthly bills

From

RM722/month

RM 25,999 upfront package

Size
10.54 kWp
Panels
17
Save
RM 602/mo
  • ~3.6 year payback
  • Tier-1 solar panels
  • Solis smart inverter
  • Solar ATAP / NEM application
  • 25-year panel warranty
Get this system

Every package includes SEDA/TNB permits, inverter, mounting, wiring, TNB Solar ATAP application, 1-2 day installation, and standard warranty. Final pricing depends on roof layout and upgrade options.

Real customers, real savings

Verified bill reductions

Actual Trexon customers across Malaysia, with before-and-after TNB bill outcomes.

"Bill turun 86% after installation. The process was clear and the team handled everything."

NS

Pn. Nik Salwani

Kota Bharu

TNB bill reduced

RM 590 to RM 82

"The savings matched the estimate and the installation team finished faster than expected."

R

En. Ridhwan

Kota Bharu

TNB bill reduced

RM 535 to RM 54

"Zero electricity bill since installation. Best investment I have made for my home."

MZ

En. Muhammad Zuhair

Ayer Keroh

TNB bill reduced

RM 1,266 to RM 0

Answers you need

Common questions

Everything Malaysian homeowners ask before going solar with Trexon.

Why choose Trexon Energy for solar installation?+

Trexon is Malaysia's digital solar platform for homes and businesses. Transparent pricing starts from RM14,999, with Solar ATAP guidance, financing options, and 25-year panel warranty coverage.

How long does solar panel installation take?+

Solar panel installation takes 1-3 days for residential systems. The entire process from quotation to power-on typically takes 4-8 weeks.

Is solar energy worth it in Malaysia?+

Yes, Malaysia receives 4-5 hours of peak sunlight daily year-round. Most homeowners save 70-90% on electricity bills and recover investment in 5-7 years.

How long does solar panel installation take in Malaysia?+

A typical residential installation takes 1-2 days after all approvals. The full process from consultation to commissioning takes 4-8 weeks, including SEDA Solar ATAP application and TNB meter swap.

What brands of solar panels does Trexon use?+

We use exclusively Tier-1 Bloomberg-bankable panels: Jinko Solar Tiger Neo, Trina Solar Vertex, LONGi Hi-MO 6, and Canadian Solar HiKu. All panels come with 25-year performance warranty.

Bahasa Malaysia

Jimat bil elektrik anda sehingga 90%

Panel solar untuk rumah kediaman di Malaysia. Dari RM14,999 sahaja, dengan pemasangan 1-2 hari dan waranti panel 25 tahun.

Kira Penjimatan Saya