For Cyberjaya and Johor data centers and tech infrastructure operators — solar is no longer just an ESG checkbox. It is a strategic power diversity tool that reduces PUE, cuts energy costs by RM400K+/yr, achieves RE100 Scope 2 compliance for hyperscale tenants, and adds LFP battery backup insurance — all with zero downtime risk.
A 750 kWp multi-rooftop solar array with 1 MWh LFP BESS deployed across a 4-building hyperscale campus. Direct DC power distribution bypasses traditional AC/DC conversion losses, improving PUE from 1.47 to 1.35. The BESS provides sub-millisecond grid-switching for NOC-monitored backup coverage on Tier 2 infrastructure.
LFP battery storage provides sub-millisecond grid-shifting, protecting your racks from localized transients while shaving Maximum Demand charges.
Combined energy savings + MD charge reduction. GITA 60% allowance and green financing from 3.5% p.a. available. BESS add-on for backup coverage quoted separately.
For a 500 kWp system at a data center consuming 1,500,000 kWh/year. TNB tariff escalation at 5% p.a. (conservative).
| Period | TNB Grid Cost | Solar Cost | You Save |
|---|---|---|---|
| Year 1 | RM684,300 | RM369,000 | RM315,300 |
| Year 5 | RM831,000 | RM369,000 | RM462,000 |
| Year 10 | RM1,060,800 | RM369,000 | RM691,800 |
| Year 15 | RM1,354,200 | RM0 (paid off) | RM1,354,200 |
| Year 25 Total | RM21.0M | RM1,050,000 | RM19.95M |
Projections based on current TNB E2/E3 tariff. Actual savings may vary. Request a site-specific model.
Zero-downtime solar engineering for mission-critical digital infrastructure.
N-Type TOPCon bifacial modules with direct DC distribution bypass traditional AC/DC conversion losses — improving Power Usage Effectiveness and reducing cooling overhead.
LFP BESS provides sub-millisecond grid-switching for NOC integration. Protects Tier 1–3 infrastructure from localized transients while continuously shaving HV MD charges.
Automated Scope 2 carbon data feed for AWS, Azure, GCP tenant audits. CDP/GRI/TCFD compatible reporting satisfies the most stringent hyperscale sustainability requirements.
Get a proposal
Share four quick details. Our B2B team will WhatsApp you within 24 hours with a tailored savings estimate — no upfront cost.
Common questions from data center operations and infrastructure teams.
Get a hyperscale solar feasibility study for your site in 24 hours. Trexon handles engineering, BESS integration, NOC API, and GITA filing.