Skip to main content
Skip to main content

Only 3 slots left for June

Get Quote
GITA 60% Tax Allowance — Deadline Dec 31, 2026

Cut Your Factory's Electricity Cost by 40-70%

Zero upfront cost. SEDA licensed. Malaysia's first fully digital commercial solar platform with AI-powered proposals.

RM 89.27

MD charge/kW you're paying

4-6 yr

Average payback period

25 yr

Panel performance warranty

48 hr

Free audit delivery

SEDA Documentation Support
TNB Application Support
References On Request

GITA 60% Tax Allowance Deadline

Loading...

left to claim 60% Green Investment Tax Allowance on your solar installation

Learn how to claim →
Instant Estimate

How Much Can Your Business Save?

Select your monthly TNB bill to see estimated savings. Actual figures depend on roof area, orientation, and operating hours.

Select your monthly TNB bill

250 kWp

Recommended system

RM 18,000

Monthly savings

RM 216,000

Annual savings

RM 5.4M

25-year savings

Solar Savings by System Size

Based on TNB C1/C2 commercial tariff rates. Self-consumption model.

System SizePanelsRoof AreaMonthly SavingsAnnual SavingsPaybackCO₂ Offset
30 kWp48210 m²RM 2,100RM 25,2005.5 yr24 tonnes/yr
50 kWp80350 m²RM 3,500RM 42,0005.2 yr40 tonnes/yr
100 kWp161700 m²RM 7,200RM 86,4004.8 yr80 tonnes/yr
200 kWp3221,400 m²RM 14,800RM 177,6004.5 yr160 tonnes/yr
500 kWp8063,500 m²RM 38,000RM 456,0004.2 yr400 tonnes/yr
1000 kWp16127,000 m²RM 78,000RM 936,0003.8 yr800 tonnes/yr

* Estimates based on average solar irradiance in Peninsular Malaysia (4.5 kWh/m²/day), C1/C2 tariff (45.62 sen/kWh), 80% self-consumption ratio. Actual savings vary.

Financing Options

3 Ways to Go Solar

Choose the model that fits your business. Every option includes SEDA registration, TNB approval, and system monitoring.

Solar PPA (SPPA)

Zero upfront. Pay only for what you use.

Upfront CostRM 0
Savings15-30% below TNB rate
System OwnershipTrexon (transferred after contract)
MaintenanceFully covered by Trexon
Most popular for factories

Best For

Businesses wanting zero CAPEX with immediate savings

Key Differentiator

Eliminate the RM 89.27/kW Maximum Demand Charge

TNB's maximum demand (MD) charge is based on your highest 30-minute power draw in any billing cycle. Solar reduces grid draw during peak hours. Combined with peak shaving UPS, you can cut MD charges by 30-60%.

Step 1: Solar reduces daytime grid draw

On-site generation directly offsets consumption, lowering peak demand

Step 2: Peak shaving UPS clips the peaks

Battery discharge during demand spikes prevents new MD highs

Step 3: Load scheduling optimization

Stagger heavy machinery startups to flatten the demand curve

Before vs After Solar + Peak Shaving

6am-9amMorning ramp-up
9am-12pmPeak production
12pm-3pmSolar peak offset
3pm-6pmAfternoon demand
6pm-9pmEvening wind-down
Before Solar
After Solar + Peak Shaving

Solar ATAP — Malaysia's Net Billing Scheme (2026)

Effective January 2026, Solar ATAP replaces NEM. Here's how commercial properties benefit.

Self-Consumption

Use solar power directly during operating hours. Every kWh generated replaces expensive TNB electricity at the full tariff rate (45.62 sen/kWh for C1).

Export Credits

Excess energy exported to TNB earns credits at the Energy Charge rate. Credits offset your bill but do NOT carry forward month-to-month.

10-Year Contract

Lock in your solar savings for 10 years. Most commercial systems break even in 4-6 years, then enjoy 19+ years of near-free electricity.

Critical: Why System Sizing Matters Under Solar ATAP

Unlike NEM, Solar ATAP credits don't carry forward. If your factory runs 5 days a week, weekend generation is exported at a lower credit rate. Over-sizing your system wastes money. Under-sizing leaves savings on the table.

Our AI-powered proposal analyzes your actual 12-month load profile, operating calendar, and roof area to find the sweet spot — maximizing weekday self-consumption while minimizing weekend export losses.

Industries We Serve

Custom-designed solar systems for every commercial and industrial sector.

Manufacturing

RM 15K-50K/mo

100-500 kWp

Warehouses & Logistics

RM 10K-30K/mo

50-300 kWp

Retail & Malls

RM 5K-20K/mo

30-200 kWp

Office Buildings

RM 8K-25K/mo

50-150 kWp

Hotels & Resorts

RM 12K-40K/mo

80-300 kWp

Agriculture & Cold Storage

RM 8K-35K/mo

50-200 kWp

Tier-1 Technology Partners

Huawei Solar
Sungrow Solar
Jinko Solar
Trina Solar
Canadian Solar

From Audit to Activation

Our end-to-end EPCC process handles everything — you just approve and save.

1

Free Energy Audit

We study your TNB bills, load profile, roof area, and operating hours. Delivered within 48 hours.

Includes satellite roof assessment, shading analysis, and maximum demand profile review.

2

Custom Proposal & ROI

Detailed system design with 25-year financial model, IRR/NPV analysis, and sensitivity testing.

Multiple financing scenarios compared side-by-side. GITA tax savings calculated.

3

Agreement & Approvals

We handle all paperwork — ST license, Solar ATAP application (RM 7.50/kW non-refundable fee), SEDA registration, MIDA/GITA filing.

Solar ATAP registration and PE-endorsed single line diagrams included.

4

Installation

Professional EPCC by CIDB-registered teams. Minimal disruption to operations.

Typical timeline: 2-6 weeks depending on system size. Weekend installation available.

5

Commissioning & O&M

System testing, grid connection, real-time monitoring, and ongoing maintenance.

24/7 remote monitoring. Guaranteed 97%+ system uptime. Panel cleaning schedule included.

Government Incentive

GITA 60% Green Investment Tax Allowance

The most powerful financial incentive for Malaysian businesses investing in solar. Apply before December 31, 2026.

60%

Capital expenditure claimable as tax allowance

RM 72K

Tax saved on a RM 500K solar system

Dec 2026

Application deadline via MGTC

Example: 200 kWp Factory System

System cost (fully installed)RM 800,000
GITA allowance (60%)RM 480,000
Tax saved (24% corporate rate)RM 115,200
Effective net costRM 684,800

Why Businesses Choose Trexon

AI-Powered Proposals

60-second AI proposals with 25-year financial models, IRR/NPV analysis, and sensitivity testing. Not generic PDF templates.

MIT-Backed Expertise

Founded by MIT alumni bringing Silicon Valley technology standards to Malaysian solar. Data-driven, not sales-driven.

Full EPCC + GITA Filing

Engineering, procurement, construction, commissioning — plus we handle all MGTC/MIDA paperwork for GITA claims.

Energy Efficiency Bundling

Solar + peak shaving + EV charging + smart monitoring. One provider for your complete energy transformation.

Digital-First Platform

Real-time monitoring dashboard, WhatsApp support, digital proposals, and online payment — no paperwork chase.

Transparent Pricing

No hidden costs. System pricing, installation fees, authority charges — all itemized upfront in your proposal.

Frequently Asked Questions

Common questions from factory managers and business owners.

GITA allows businesses to claim 60% of qualifying solar capital expenditure as a tax allowance against statutory income. For a RM500K system, this saves ~RM72K in corporate tax. Application deadline is December 31, 2026 via MGTC. Trexon handles the full application.

Registered & Certified

SEDA RPVSP Licensed
ST Registered Contractor
TNB Approved
CIDB Registered
MyHIJAU Certified
GITA deadline: Dec 31, 2026

Ready to Cut Your Electricity Bill?

Get a free energy audit with detailed ROI projections for your business. No obligation. Delivered within 48 hours.

Or email us at energy@trexon.my

Free Energy Audit

No obligation · 48hr delivery