Model your project savings and peak-demand reduction
Calculate ROICut Your Factory's Electricity Cost
A booking of 20% of the system price, capped at RM20,000 to start, credited in full to your system. SEDA-registered PV service provider (SEDA-RPVSP-2026/373). Every commercial system is sized and priced per project from your TNB bills.
RPVSP-2026/373
SEDA registration
Per project
Priced from your bills
31 Dec 2026
GITA: 60% of capex, commission + submit by
20%
Booking (max RM20,000), credited in full

Free quote output
Factory solar ROI
TNB bill analysis
Maximum demand and tariff review
Roof sizing
kWp, panel count and export estimate
Finance route
Ownership (GITA) or hire purchase model
Board pack
ROI summary ready for management
GITA 60% Tax Allowance Deadline
Commission and submit by 31 Dec 2026
left to commission and submit for the 60% Green Investment Tax Allowance on your solar installation
Learn how it works →Solar Savings by System Size
Based on the Medium Voltage General energy rate of RM0.2983/kWh (maximum demand charges not counted). Self-consumption model.
| System Size | Panels | Roof Area | Monthly Savings | Annual Savings | Payback | CO₂ Offset |
|---|---|---|---|---|---|---|
| 30 kWp | 48 | 210 m² | RM 940 | RM 11,300 | 6.4 yr | 28 tonnes/yr |
| 50 kWp | 80 | 350 m² | RM 1,570 | RM 18,800 | 6.4 yr | 47 tonnes/yr |
| 100 kWp | 161 | 700 m² | RM 3,130 | RM 37,600 | 6.4 yr | 93 tonnes/yr |
| 200 kWp | 322 | 1,400 m² | RM 6,260 | RM 75,200 | 6.4 yr | 186 tonnes/yr |
| 500 kWp | 806 | 3,500 m² | RM 15,660 | RM 187,900 | 6.4 yr | 466 tonnes/yr |
| 1000 kWp | 1612 | 7,000 m² | RM 31,320 | RM 375,900 | 6.4 yr | 932 tonnes/yr |
* Estimates assume 3.5 peak sun-hours a day, all output used on site, the Medium Voltage General energy rate of RM0.2983/kWh, no tariff escalation, and an illustrative price of RM2,400/kWp before SST. Low Voltage sites pay about RM0.5068/kWh. Actual savings vary.
3 Ways to Go Solar
Choose the model that fits your business. Every option includes SEDA registration, TNB approval, and system monitoring.
Outright Purchase
Own the system. Keep all savings.
Reduce Your Maximum Demand Charge
TNB's maximum demand (MD) charge is based on your highest 30-minute power draw in any billing cycle. Solar alone does not reduce MD reliably — one cloudy half-hour sets the month's figure — so the solar saving is on the energy charge. MD savings come from battery (BESS) peak shaving, sized from your own load profile, which we model from your bills.
Step 1: Solar reduces daytime grid draw
On-site generation offsets energy consumption — an energy-charge saving, not an MD saving
Step 2: BESS peak shaving clips the peaks
Battery discharge during demand spikes prevents new MD highs
Step 3: Load scheduling optimization
Stagger heavy machinery startups to flatten the demand curve
Illustrative Load Profile: Before vs After Solar + Peak Shaving
Solar ATAP — Malaysia's Net Billing Scheme (2026)
Effective January 2026, Solar ATAP replaces NEM. Here's how commercial properties benefit.
Self-Consumption
Use solar power directly during operating hours. Every kWh generated replaces TNB electricity at the full energy rate you would otherwise pay (for example, 29.83 sen/kWh on Medium Voltage General). Solar alone is not counted as a maximum-demand saving.
Export Credits
Excess energy exported to TNB earns credits at the monthly Average SMP rate for non-domestic customers. Credits offset your bill but unused credit is forfeited at the end of each billing period.
10-Year Contract
Solar ATAP runs on a 10-year term. Exports are credited at the monthly Average SMP, and unused credit is forfeited at the end of each billing period. Payback is calculated per project from your bills. Multi-tenant premises are not eligible.
Critical: Why System Sizing Matters Under Solar ATAP
Unlike the old NEM scheme, unused Solar ATAP export credit is forfeited at the end of each billing period. If your factory runs 5 days a week, weekend generation is exported at a lower credit rate. Over-sizing your system wastes money. Under-sizing leaves savings on the table.
Our engineering review uses your actual 12-month load profile, operating calendar, and roof area to find the sweet spot — maximizing weekday self-consumption while minimizing weekend export losses.
Industries We Serve
Custom-designed solar systems for every commercial and industrial sector.
Manufacturing
RM 3.2K-15.9K/mo
100-500 kWp
Warehouses & Logistics
RM 1.6K-9.5K/mo
50-300 kWp
Retail & Malls
RM 1K-6.4K/mo
30-200 kWp
Office Buildings
RM 1.6K-4.8K/mo
50-150 kWp
Hotels & Resorts
RM 2.5K-9.5K/mo
80-300 kWp
Agriculture & Cold Storage
RM 1.6K-6.4K/mo
50-200 kWp
Looking for more detail? See our factory solar guide, the industrial solar overview by sector, the industrial park solar feasibility map, our commercial solar financing options and the GITA tax allowance guide.
Tier-1 Technology Partners
From Audit to Activation
Our end-to-end EPCC process handles everything — you just approve and save.
Free Quote
We study your TNB bills, load profile, roof area, and operating hours.
Includes satellite roof assessment, shading analysis, and maximum demand profile review.
Custom Proposal & ROI
Detailed system design with 25-year financial model, IRR/NPV analysis, and sensitivity testing.
Multiple financing scenarios compared side-by-side. GITA tax savings calculated.
Agreement & Approvals
We handle the paperwork — ST license, Solar ATAP application, SEDA registration — and support the owner's MGTC GITA application.
Solar ATAP registration and single line diagrams prepared by our engineering team included.
Installation
Professional EPCC by our SEDA-registered team (RPVSP-2026/373). Works planned around your operating hours.
Installation timeline depends on system size and is set out in your proposal.
Commissioning & O&M
System testing, grid connection, real-time monitoring, and ongoing maintenance.
Monitoring and maintenance scope as set out in your proposal.
GITA: Green Investment Tax Allowance (Asset)
An allowance for the company that owns the system. The capex must be incurred, the system commissioned and the MGTC application submitted by 31 December 2026.
60%
Of qualifying capex, set off against up to 70% of statutory income
RM 72K
Illustration: RM500K capex × 60% × 24% tax rate
31 Dec 2026
Commissioned and MGTC application submitted by
Illustration only (assumed figures, not a quote)
Why Businesses Choose Trexon
Bill-Based Proposals
Proposals sized and priced from your own TNB bills and load profile, with a 25-year financial model, IRR/NPV analysis and sensitivity testing.
SEDA-Registered Installer
SEDA RPVSP-2026/373. Solis, Huawei, Sungrow or GoodWe inverters with Jinko 620W N-type panels.
Full EPCC + GITA Filing
Engineering, procurement, construction, commissioning — plus support with the owner's MGTC GITA application.
Energy Efficiency Bundling
Solar + peak shaving + EV charging + smart monitoring. One provider for your complete energy transformation.
Digital-First Platform
Real-time monitoring dashboard, WhatsApp support, digital proposals, and online payment — no paperwork chase.
Transparent Pricing
No hidden costs. System pricing, installation fees, authority charges — all itemized upfront in your proposal.
Frequently Asked Questions
Common questions from factory managers and business owners.
GITA (Asset) lets the company that owns the system claim an allowance of 60% of qualifying solar capital expenditure, set off against up to 70% of statutory income. It is an allowance, not a rebate. To qualify, the capex must be incurred, the system commissioned and the MGTC application submitted by 31 December 2026. Illustration only: RM500K of qualifying capex × 60% × a 24% tax rate ≈ RM72K of tax value. Trexon supports the owner's application paperwork.
Registered
Get a Custom Solar Proposal for Your Business
Tell us about your business and our commercial team will design a solar system that matches your energy needs and budget.
- Sizing from your 12 months of TNB bills and shift pattern
- Roof, switchboard and single-line diagram reviewed by our engineers
- Available incentives (GITA for solar, subject to MGTC verification) and Solar ATAP eligibility checked for your premises
- SEDA-registered PV Service Provider (RPVSP-2026/373) · SSM 201301044881 (1074704-D)
Prefer to talk first? Message our commercial team on WhatsApp.
WhatsApp UsReady to Cut Your Electricity Bill?
Get a free quote with detailed ROI projections for your business. No obligation. Priced per project from your bills.
Or email us at energy@trexon.my