Skip to main content
Skip to main content

Model your project savings and peak-demand reduction

Calculate ROI
GITA: commission + submit by 31 Dec 2026

Cut Your Factory's Electricity Cost

A booking of 20% of the system price, capped at RM20,000 to start, credited in full to your system. SEDA-registered PV service provider (SEDA-RPVSP-2026/373). Every commercial system is sized and priced per project from your TNB bills.

RPVSP-2026/373

SEDA registration

Per project

Priced from your bills

31 Dec 2026

GITA: 60% of capex, commission + submit by

20%

Booking (max RM20,000), credited in full

SEDA Documentation Support
TNB Application Support
References On Request
Illustrative AI concept of a Malaysian factory rooftop solar system
Illustrative AI concept · not a completed customer installation

Free quote output

Factory solar ROI

TNB bill analysis

Maximum demand and tariff review

Roof sizing

kWp, panel count and export estimate

Finance route

Ownership (GITA) or hire purchase model

Board pack

ROI summary ready for management

Sized and priced from your latest commercial TNB bills.

GITA 60% Tax Allowance Deadline

Commission and submit by 31 Dec 2026

left to commission and submit for the 60% Green Investment Tax Allowance on your solar installation

Learn how it works →
Instant Estimate

How Much Can Your Business Save?

Select your monthly TNB bill to see estimated savings. Actual figures depend on roof area, orientation, and operating hours.

Select your monthly TNB bill

250 kWp

Recommended system

RM 7,830

Monthly savings

RM 93,960

Annual savings

RM 2.3M

25-year savings

Solar Savings by System Size

Based on the Medium Voltage General energy rate of RM0.2983/kWh (maximum demand charges not counted). Self-consumption model.

System SizePanelsRoof AreaMonthly SavingsAnnual SavingsPaybackCO₂ Offset
30 kWp48210 m²RM 940RM 11,3006.4 yr28 tonnes/yr
50 kWp80350 m²RM 1,570RM 18,8006.4 yr47 tonnes/yr
100 kWp161700 m²RM 3,130RM 37,6006.4 yr93 tonnes/yr
200 kWp3221,400 m²RM 6,260RM 75,2006.4 yr186 tonnes/yr
500 kWp8063,500 m²RM 15,660RM 187,9006.4 yr466 tonnes/yr
1000 kWp16127,000 m²RM 31,320RM 375,9006.4 yr932 tonnes/yr

* Estimates assume 3.5 peak sun-hours a day, all output used on site, the Medium Voltage General energy rate of RM0.2983/kWh, no tariff escalation, and an illustrative price of RM2,400/kWp before SST. Low Voltage sites pay about RM0.5068/kWh. Actual savings vary.

Financing Options

3 Ways to Go Solar

Choose the model that fits your business. Every option includes SEDA registration, TNB approval, and system monitoring.

Outright Purchase

Own the system. Keep all savings.

Upfront CostFull CAPEX
Savings100% of generation savings
System OwnershipCustomer from Day 1
MaintenanceO&M terms set out in your proposal
GITA-eligible: the owner claims the allowance

Best For

Businesses with available capital that want to own the asset and claim GITA

Key Differentiator

Reduce Your Maximum Demand Charge

TNB's maximum demand (MD) charge is based on your highest 30-minute power draw in any billing cycle. Solar alone does not reduce MD reliably — one cloudy half-hour sets the month's figure — so the solar saving is on the energy charge. MD savings come from battery (BESS) peak shaving, sized from your own load profile, which we model from your bills.

Step 1: Solar reduces daytime grid draw

On-site generation offsets energy consumption — an energy-charge saving, not an MD saving

Step 2: BESS peak shaving clips the peaks

Battery discharge during demand spikes prevents new MD highs

Step 3: Load scheduling optimization

Stagger heavy machinery startups to flatten the demand curve

Illustrative Load Profile: Before vs After Solar + Peak Shaving

6am-9amMorning ramp-up
9am-12pmPeak production
12pm-3pmSolar peak offset
3pm-6pmAfternoon demand
6pm-9pmEvening wind-down
Before Solar
After Solar + Peak Shaving

Solar ATAP — Malaysia's Net Billing Scheme (2026)

Effective January 2026, Solar ATAP replaces NEM. Here's how commercial properties benefit.

Self-Consumption

Use solar power directly during operating hours. Every kWh generated replaces TNB electricity at the full energy rate you would otherwise pay (for example, 29.83 sen/kWh on Medium Voltage General). Solar alone is not counted as a maximum-demand saving.

Export Credits

Excess energy exported to TNB earns credits at the monthly Average SMP rate for non-domestic customers. Credits offset your bill but unused credit is forfeited at the end of each billing period.

10-Year Contract

Solar ATAP runs on a 10-year term. Exports are credited at the monthly Average SMP, and unused credit is forfeited at the end of each billing period. Payback is calculated per project from your bills. Multi-tenant premises are not eligible.

Critical: Why System Sizing Matters Under Solar ATAP

Unlike the old NEM scheme, unused Solar ATAP export credit is forfeited at the end of each billing period. If your factory runs 5 days a week, weekend generation is exported at a lower credit rate. Over-sizing your system wastes money. Under-sizing leaves savings on the table.

Our engineering review uses your actual 12-month load profile, operating calendar, and roof area to find the sweet spot — maximizing weekday self-consumption while minimizing weekend export losses.

Industries We Serve

Custom-designed solar systems for every commercial and industrial sector.

Manufacturing

RM 3.2K-15.9K/mo

100-500 kWp

Warehouses & Logistics

RM 1.6K-9.5K/mo

50-300 kWp

Retail & Malls

RM 1K-6.4K/mo

30-200 kWp

Office Buildings

RM 1.6K-4.8K/mo

50-150 kWp

Hotels & Resorts

RM 2.5K-9.5K/mo

80-300 kWp

Agriculture & Cold Storage

RM 1.6K-6.4K/mo

50-200 kWp

Looking for more detail? See our factory solar guide, the industrial solar overview by sector, the industrial park solar feasibility map, our commercial solar financing options and the GITA tax allowance guide.

Tier-1 Technology Partners

Huawei Solar
Sungrow Solar
Jinko Solar

From Audit to Activation

Our end-to-end EPCC process handles everything — you just approve and save.

1

Free Quote

We study your TNB bills, load profile, roof area, and operating hours.

Includes satellite roof assessment, shading analysis, and maximum demand profile review.

2

Custom Proposal & ROI

Detailed system design with 25-year financial model, IRR/NPV analysis, and sensitivity testing.

Multiple financing scenarios compared side-by-side. GITA tax savings calculated.

3

Agreement & Approvals

We handle the paperwork — ST license, Solar ATAP application, SEDA registration — and support the owner's MGTC GITA application.

Solar ATAP registration and single line diagrams prepared by our engineering team included.

4

Installation

Professional EPCC by our SEDA-registered team (RPVSP-2026/373). Works planned around your operating hours.

Installation timeline depends on system size and is set out in your proposal.

5

Commissioning & O&M

System testing, grid connection, real-time monitoring, and ongoing maintenance.

Monitoring and maintenance scope as set out in your proposal.

Government Incentive

GITA: Green Investment Tax Allowance (Asset)

An allowance for the company that owns the system. The capex must be incurred, the system commissioned and the MGTC application submitted by 31 December 2026.

60%

Of qualifying capex, set off against up to 70% of statutory income

RM 72K

Illustration: RM500K capex × 60% × 24% tax rate

31 Dec 2026

Commissioned and MGTC application submitted by

Illustration only (assumed figures, not a quote)

Assumed qualifying capexRM 800,000
GITA allowance (60%)RM 480,000
Tax saved (24% corporate rate)RM 115,200
Effective net costRM 684,800

Why Businesses Choose Trexon

Bill-Based Proposals

Proposals sized and priced from your own TNB bills and load profile, with a 25-year financial model, IRR/NPV analysis and sensitivity testing.

SEDA-Registered Installer

SEDA RPVSP-2026/373. Solis, Huawei, Sungrow or GoodWe inverters with Jinko 620W N-type panels.

Full EPCC + GITA Filing

Engineering, procurement, construction, commissioning — plus support with the owner's MGTC GITA application.

Energy Efficiency Bundling

Solar + peak shaving + EV charging + smart monitoring. One provider for your complete energy transformation.

Digital-First Platform

Real-time monitoring dashboard, WhatsApp support, digital proposals, and online payment — no paperwork chase.

Transparent Pricing

No hidden costs. System pricing, installation fees, authority charges — all itemized upfront in your proposal.

Frequently Asked Questions

Common questions from factory managers and business owners.

GITA (Asset) lets the company that owns the system claim an allowance of 60% of qualifying solar capital expenditure, set off against up to 70% of statutory income. It is an allowance, not a rebate. To qualify, the capex must be incurred, the system commissioned and the MGTC application submitted by 31 December 2026. Illustration only: RM500K of qualifying capex × 60% × a 24% tax rate ≈ RM72K of tax value. Trexon supports the owner's application paperwork.

Registered

SEDA-Registered PV Service Provider
SEDA RPVSP-2026/373
SSM 201301044881 (1074704-D)
Priced per project from your bills
GITA eligibility checked for your premises
Commercial Solar

Get a Custom Solar Proposal for Your Business

Tell us about your business and our commercial team will design a solar system that matches your energy needs and budget.

  • Sizing from your 12 months of TNB bills and shift pattern
  • Roof, switchboard and single-line diagram reviewed by our engineers
  • Available incentives (GITA for solar, subject to MGTC verification) and Solar ATAP eligibility checked for your premises
  • SEDA-registered PV Service Provider (RPVSP-2026/373) · SSM 201301044881 (1074704-D)

Prefer to talk first? Message our commercial team on WhatsApp.

WhatsApp Us

Send your project brief

Tell us about the site and we will prepare a commercial solar proposal priced per project from your bills.

Mobile or office line

You can also upload these in your dashboard after submitting, or send them on WhatsApp.

By submitting you agree to be contacted about this project.

GITA deadline: Dec 31, 2026

Ready to Cut Your Electricity Bill?

Get a free quote with detailed ROI projections for your business. No obligation. Priced per project from your bills.

Or email us at energy@trexon.my

Free Quote

No obligation · priced from your bills