Skip to main content
Peak Shaving & BESS Solutions

Stop Paying forMaximum DemandSpikes

Slash your TNB Maximum Demand charges by 30-50% with intelligent battery storage. Real-time peak shaving under Malaysia's RP4 tariff.

RM 45.10
per kW/month (E1/E2)
30-50%
MD Reduction
3-4 yrs
Typical Payback

Live Demand Monitor

Real-time load tracking

Live
72%of MD Limit
Optimal Range

MD Charges Accumulating

RM 0.00

Since you opened this page (based on RM 50k/month MD)

Visual Comparison

See Peak Shaving in Action

Watch how battery storage "shaves" the peaks off your demand curve, keeping you below the MD threshold and saving thousands monthly.

Without Peak Shaving
With BESS
MD Threshold
12AM6AM12PM6PM12AM

TNB Peak Hours (RP4 Tariff)

Weekdays

8:00 AM - 10:00 PM

Weekends & Holidays

Off-Peak all day

TNB RP4 Tariffs 2024-2025

Understanding Your MD Charges

Maximum Demand charges under TNB's Regulatory Period 4 tariffs. These fixed charges can be 30-40% of your total electricity bill.

Commercial (C1/C2)

MD ChargeRM 30.3/kW
Peak RateRM 0.365/kWh
Off-Peak RateRM 0.224/kWh
ICPT Surcharge+RM 0.2/kWh

Industrial (E1/E2/E3)

MD ChargeRM 45.1/kW
Peak RateRM 0.365/kWh
Off-Peak RateRM 0.219/kWh
ICPT Surcharge+RM 0.2/kWh

Medium Voltage (Ds/Es)

MD ChargeRM 29.6/kW
Peak RateRM 0.337/kWh
Off-Peak RateRM 0.202/kWh
ICPT Surcharge+RM 0.17/kWh

Example: Manufacturing Plant

A factory with 2,000 kW maximum demand under E2 Industrial tariff:

MD Charge:2,000 kW × RM 45.10 = RM 90,200/month
Annual MD Cost:RM 1,082,400/year

With Peak Shaving (35% reduction):

New MD:1,300 kW
New MD Cost:RM 58,630/month
Monthly Savings:RM 31,570
Annual Savings:RM 378,840
Savings Calculator

Calculate Your Potential Savings

Enter your current Maximum Demand and see how much you could save with intelligent peak shaving. Based on actual TNB RP4 tariff rates.

Slash MD Charges by 30-50%

Maximum Demand charges can be up to 40% of your electricity bill. Peak shaving dramatically reduces this.

BESS + Solar Integration

Combine battery storage with solar for maximum savings. Charge during off-peak, discharge during peak.

Predictable Energy Costs

AI-powered load management keeps your demand profile flat, avoiding surprise MD spikes.

Real-Time Monitoring

Live dashboard tracks your demand curve and battery state. Get alerts before MD spikes occur.

MD Savings Calculator

MD Rate: RM 45.1/kW/month

1,500 kW
100 kW5,000 kW
30%
10%50%

Current MD Cost

RM 67,650

/month

After Peak Shaving

RM 47,355

/month (1050 kW)

Monthly Savings

RM 20,295

Yearly Savings

RM 243,540

81 kWh

Battery Size

~RM 203k

Est. Investment

0.8 yrs

Payback

Industry Case Studies

Real Results Across Industries

See how businesses across Malaysia are saving with peak shaving solutions.

Manufacturing Plant

Before MD:2,500 kW
After MD:1,800 kW
Battery:500 kWh

Monthly Savings

RM 31,710

Payback

3.2 years

Shopping Mall

Before MD:1,500 kW
After MD:1,100 kW
Battery:300 kWh

Monthly Savings

RM 12,120

Payback

3.8 years

Data Center

Before MD:3,000 kW
After MD:2,200 kW
Battery:600 kWh

Monthly Savings

RM 36,080

Payback

2.9 years

Hotel & Resort

Before MD:800 kW
After MD:550 kW
Battery:200 kWh

Monthly Savings

RM 7,575

Payback

4.1 years

Implementation Process

From Audit to Savings

Our proven 4-step process ensures optimal system design and maximum ROI for your facility.

1-2 weeks

Energy Audit

We analyze 12 months of TNB bills and identify your demand patterns and peak periods

1 week

Custom Design

Our engineers design an optimal BESS solution sized for your specific load profile

2-4 weeks

Installation

Professional installation with minimal disruption to your operations

Ongoing

Optimization

AI continuously learns your patterns and optimizes battery dispatch for maximum savings

FAQ

Peak Shaving Questions Answered

Everything you need to know about Maximum Demand reduction in Malaysia.

Maximum Demand is the highest amount of electrical power (kW) your facility draws in any 30-minute interval during a billing period. TNB charges you based on this peak, regardless of your average consumption. A single spike can set your MD charge for the entire month. Under RP4 tariffs, MD charges can be RM 30-45 per kW - a 2,000 kW facility pays RM 60,000-90,000 monthly JUST for MD!
Stop Overpaying for Maximum Demand

Get Your Free Energy Audit Today

Our engineers will analyze your TNB bills and show you exactly how much you can save with peak shaving. No obligation, 100% free.

Free Site Assessment
12-Month Bill Analysis
ROI Guarantee
Award-Winning Team