Model your project savings and peak-demand reduction

Calculate ROI
Peak Shaving & BESS Solutions

Stop Paying forMaximum DemandSpikes

Lower your TNB Maximum Demand charges with battery storage sized from your own bills. Real-time peak shaving under Malaysia's July 2025 tariff.

Per kW
MD charged monthly (MV)
30-min
MD interval
Per project
Payback from your bills
SEDA Documentation Support
TNB Application Support
References On Request
Discuss your project
Illustrative Malaysian peak shaving concept, generated in Google Flow
AI-generated concept · not a completed Trexon installation

Live Demand Monitor

Illustrative load tracking demo

Demo
72%of MD Limit
Optimal Range

Illustrative demo: MD charge accumulating

RM 0.00

Since you opened this page (illustrative demo, based on an RM 50k/month MD charge spread over time; not a real bill)

Visual Comparison

See Peak Shaving in Action

Watch how battery storage "shaves" the peaks off your demand curve, keeping you below the MD threshold and saving thousands monthly.

Without Peak Shaving
With BESS
MD Threshold
12AM6AM12PM6PM12AM

TNB Peak Hours (July 2025 Tariff)

Monday to Friday

2:00 PM - 10:00 PM

Weekends & Holidays

Off-Peak all day

TNB Tariffs (July 2025 - Dec 2027)

Understanding Your MD Charges

Maximum Demand charges under the new unbundled TNB tariffs. These charges can be a large share of your total electricity bill.

Medium Voltage (MV ToU)

MD ChargeRM 97.06/kW
Peak RateRM 0.3132/kWh
Off-Peak RateRM 0.2723/kWh

High Voltage (HV ToU)

MD ChargeRM 44.82/kW
Peak RateRM 0.4452/kWh
Off-Peak RateRM 0.4043/kWh

Medium Voltage (MV Gen)

MD ChargeRM 89.27/kW
Peak RateRM 0.2983/kWh
Off-Peak RateRM 0.2983/kWh

Example: Manufacturing Plant

A factory with 2,000 kW maximum demand under Medium Voltage General tariff:

MD Charge:2,000 kW × RM 89.27 = RM 178,540/month
Annual MD Cost:RM 2,142,480/year

With Peak Shaving (illustrative 35% reduction):

New MD:1,300 kW
New MD Cost:RM 116,051/month
Monthly Savings:RM 62,489
Annual Savings:RM 749,868
Savings Calculator

Calculate Your Potential Savings

Enter your current Maximum Demand and see how much you could save with intelligent peak shaving. Based on actual July 2025 TNB tariff rates.

Lower Your MD Peak

Maximum Demand charges are a large share of many commercial bills. Peak shaving targets the spikes that set them.

BESS + Solar Integration

Combine battery storage with solar for maximum savings. Charge during off-peak, discharge during peak.

Predictable Energy Costs

Automated load management keeps your demand profile flatter, reducing surprise MD spikes.

Real-Time Monitoring

Live dashboard tracks your demand curve and battery state. Get alerts before MD spikes occur.

MD Savings Calculator

MD Rate: RM 97.06/kW/month

1,500 kW
100 kW5,000 kW
30%
10%50%

Current MD Cost

RM 145,590

/month

After Peak Shaving

RM 101,913

/month (1050 kW)

Monthly Savings

RM 43,677

Yearly Savings

RM 524,124

900 kWh

Battery Size

~RM 1.17 million – RM 1.89 million

Indicative cost (quoted per site)

Per site

Payback

Battery energy storage cabinets installed beside a factory switch room
Illustrative Scenarios

Illustrative Scenarios by Industry

Modelled examples, not client results. Your figures are calculated from your own bills.

Manufacturing Plant

Before MD:2,500 kW
After MD:1,800 kW
Battery:500 kWh

Monthly Savings

RM 62,489

Shopping Mall

Before MD:1,500 kW
After MD:1,100 kW
Battery:300 kWh

Monthly Savings

RM 38,824

Data Center

Before MD:3,000 kW
After MD:2,200 kW
Battery:600 kWh

Monthly Savings

RM 35,856

Hotel & Resort

Before MD:800 kW
After MD:550 kW
Battery:200 kWh

Monthly Savings

RM 24,265

Implementation Process

From Audit to Savings

Our 4-step process helps design a suitable system with a transparent ROI projection for your facility.

Step 1

Energy Audit

We analyze 12 months of TNB bills and identify your demand patterns and peak periods

Step 2

Custom Design

Our engineers design an optimal BESS solution sized for your specific load profile

Step 3

Installation

Professional installation with minimal disruption to your operations

Step 4

Optimization

The energy management system tunes battery dispatch to your load patterns

FAQ

Peak Shaving Questions Answered

Everything you need to know about Maximum Demand reduction in Malaysia.

Maximum Demand is the highest amount of electrical power (kW) your facility draws in any 30-minute interval during a billing period. TNB charges you based on this peak, regardless of your average consumption. A single spike can set your MD charge for the entire month. Under the July 2025 unbundled tariffs, MD is charged per kW for medium-voltage customers, so for large facilities it is a major line on the bill.
Commercial Solar

Get a Custom Solar Proposal for Your Peak Shaving Needs

Our engineers will analyze your TNB bills and design an optimal BESS solution to slash your Maximum Demand charges.

  • Sizing from your 12 months of TNB bills and shift pattern
  • Roof, switchboard and single-line diagram reviewed by our engineers
  • Available incentives (GITA for solar, subject to MGTC verification) and Solar ATAP eligibility checked for your premises
  • SEDA-registered PV Service Provider (RPVSP-2026/373) · SSM 201301044881 (1074704-D)

Prefer to talk first? Message our commercial team on WhatsApp.

WhatsApp Us

Send your project brief

Tell us about the site and we will prepare a battery energy storage proposal priced per project from your bills.

Mobile or office line

You can also upload these in your dashboard after submitting, or send them on WhatsApp.

By submitting you agree to be contacted about this project.

Stop Overpaying for Maximum Demand

Get Your Free Quote Today

Our engineers will remotely analyze your TNB bills and show you an estimate of what you could save with peak shaving. No obligation.

Protected Connection
Gateway Payment
Terms Confirmed Before Payment
Server-Verified PricingOrder-Specific Payment RecordDashboard Order Tracking
A booking of 20% of the system price, capped at RM20,000 — credited in full
12-Month Bill Analysis
Bill-Based Proposal
SEDA RPVSP-2026/373