Malaysia is SEA's #1 data center growth market — Johor Sedenak, Cyberjaya, Klang Valley. Every hyperscaler PUE chase ends at one question: where's the renewable PPA? Trexon ships onsite rooftop + carport solar and offsite virtual PPA structures aligned with RE100 and MGTC LSS5.
Not every solar contractor understands RE100, REC registries, or TNB wheeling agreements. We do.
Greenhouse Gas Protocol Market-Based method aligned. Onsite solar generates Renewable Energy Certificates (RECs) that retire against your Scope 2 inventory — satisfying CDP, SBTi, and annual RE100 progress reports.
Malaysia's grid emission factor is 0.585 tCO₂/MWh (Peninsular, 2024). Every kWh your rooftop or carport generates displaces that factor — directly lowering your carbon-intensity per PUE rack.
Hyperscale campuses sit on expensive Johor or Cyberjaya industrial land. We monetise the roof and parking podium — zero land acquisition, no green-field leasing, no disruption to live operations.
Where onsite capacity is capped by roof size, we structure offsite Virtual PPA arrangements with LSS5 and CGPP awardees sleeved through TNB's network — giving you additionality at scale.
Three complementary products — stack them to achieve 100% renewable across your campus.
Up to 8 MWp per hyperscale roof
Bifacial monocrystalline panels on ballasted or mechanically fastened low-slope systems. Structural loading report, lightning protection, and grid-connection engineering included. 100% self-consumption — no NEM export paperwork. Monitoring via web dashboard integrated with your BMS.
1–3 MWp per parking deck
Steel canopy carport structures over staff and visitor parking. Dual purpose: solar generation plus shading for EV charging bays. Column-free spans up to 16m for bus bays. Compliant with UBBL and JKR structural loadings. Prefabricated galvanized steel shipped flat-pack.
Custom MW block via LSS5 / CGPP
For operators whose roof or carport cannot satisfy 100% renewable targets, we structure a Virtual PPA (VPPA) or physical PPA with LSS5 / CGPP awardees. Power sleeved through TNB's transmission network. Additionality confirmed — new renewable generation, not existing certificates.
Our documentation package is formatted for your sustainability team to submit directly to each framework.
Climate Group / CDP
Greenhouse Gas Protocol Scope 2 Market-Based method. RECs generated by onsite solar or VPPA retired annually against consumption to achieve and report 100% renewable electricity.
Malaysia Green Technology Corporation
Rooftop + carport solar directly contributes to campus GreenRE or GBI credits. Trexon's system documentation package maps to MGTC LCCF assessment criteria.
USGBC / BCA Singapore
Onsite renewable energy generation earns EA credit points under LEED v4.1 and Green Mark Platinum. Our energy models and commissioning reports are formatted for LEED certification submission.
Bursa Malaysia (SC-mandated from 2025)
Bursa-listed parent companies of data center operators face mandatory TCFD/ISSB S2 climate disclosures from 2025. Scope 2 reduction via onsite solar reduces physical and transition risk exposure in annual reports.
From hyperscale campuses to managed hosting — different operators, same renewable commitment.
Microsoft, Google, AWS, ByteDance
RE100 committed. Campus rooftops 50,000–200,000 m². Internal sustainability teams require additionality and REC retirement documentation.
Bridge DC, Yondr, EdgeConneX, GDS, Vantage
Offer green-power options to enterprise tenants. Carport solar differentiates product; VPPA satisfies tenant ESG reporting without land acquisition.
CelcomDigi, Telekom Malaysia
Large campus footprints, legacy diesel backup, and Bursa-listed parent sustainability commitments. Rooftop solar + REC stack directly feeds annual integrated reports.
Exabytes, ServerFreak, Shinjiru
Smaller DC floor areas — carport solar is right-sized. Green hosting badge strengthens SME customer retention against hyperscale competition.
A single-contractor engagement from drone survey to annual REC retirement.
Drone survey of roof and parking deck. Structural assessment for loading capacity. Shadow analysis across the campus. We deliver a bankable P50/P90 yield model and sizing recommendation within 10 working days — at no cost for qualified operators.
Full electrical engineering design to TNB Grid Code. For VPPA, we bring in legal and financial advisors to structure the contract, negotiate with LSS5/CGPP awardees, and obtain TNB wheeling approval. Fixed-price EPC contract issued.
Single-contractor EPC — civil, structural steel, electrical, inverter, monitoring. Commissioning to IEC 62446 standard. TNB/SESB grid connection witnessed test. REC registration with ST or iREC registry on commissioning day.
Annual preventive maintenance, inverter remote monitoring, soiling loss reporting. REC issuance and retirement managed on your behalf each calendar year. Annual energy report formatted for GHG inventory and Bursa disclosure.
RE100
Scope 2 Market-Based aligned
LSS5
Virtual PPA ready
25yr
O&M commitment
RECs
Included & retired annually
Send us your campus roof plan or site coordinates — we'll return a bankable P50 yield model, REC estimate, and indicative ROI within 10 working days. No obligation, no NDA required to start.