Skip to main content
Skip to main content

Model your project savings and peak-demand reduction

Calculate ROI
For JMB Chairpersons, MC Members & Property Managers

Solar for Strata Buildings, JMBs & Condos

Common-area TNB bills are often the single largest line in a JMB budget. Rooftop solar offsets the daytime share of that load — sized and priced per project from your common-area bills, and sinking-fund-friendly.

Enquire about your project
Illustrative concept: Solar for Malaysian strata common-area loads

Illustrative solar concept. Site design follows engineering assessment.

Common-area loads we offset

Lifts (2–8 units)

4,000–18,000 kWh/mo typical

Lobby & corridor lighting

2,000–6,000 kWh/mo typical

Pool pump & filter

800–3,500 kWh/mo typical

Gym + facility lights

600–2,000 kWh/mo typical

Security CCTV + access

400–1,200 kWh/mo typical

Water pumps (booster)

1,500–5,000 kWh/mo typical

3 ways to fund it

1

Sinking Fund + Capex

JMB/MC pays from the sinking fund and owns the system outright. Payback is calculated per project from your common-area bills.

2

Third-Party PPA (explainer)

A PPA requires a third-party asset owner that owns the system and sells the building its output. Trexon does not finance PPAs; Trexon’s own routes are outright ownership or hire purchase.

3

Hire Purchase

Fixed monthly payments through Mitsubishi HC Capital Malaysia; rates and term are set by the lender, and the system is the JMB’s own. Note the payment is normally higher than the monthly saving during the term — you are buying the asset, not renting it.

Preparing a Proposal for Your JMB or MC

Before taking a proposal to your JMB or MC and then to an AGM or EGM, prepare the facts owners will ask about: the common-area electricity bills for the past 12 months, the roof plan and who controls the roof, which loads (lifts, lobby and corridor lighting, water pumps, pool, car park) run in the daytime, and whether a battery, EV charging or both are in scope.

Compare financing options, including hire purchase that can reduce the one-off draw on the sinking fund (third-party PPAs are not offered by Trexon), and see how EV charging for condominiums can share the same electrical upgrade. Use the solar calculator for an early estimate, and ask about solar O&M services so the system is looked after once it is handed over.

A condominium car park deck with a solar canopy over EV charging bays
Commercial Solar

Get a Custom Solar Proposal for Your Strata Building

Tell us about your JMB/MC and our commercial team will design a solar system that matches your common-area energy needs and budget.

  • Sizing from your 12 months of TNB bills and shift pattern
  • Roof, switchboard and single-line diagram reviewed by our engineers
  • Available incentives (GITA for solar, subject to MGTC verification) and Solar ATAP eligibility checked for your premises
  • SEDA-registered PV Service Provider (RPVSP-2026/373) · SSM 201301044881 (1074704-D)

Prefer to talk first? Message our commercial team on WhatsApp.

WhatsApp Us

Send your project brief

Tell us about the site and we will prepare a strata and JMB solar proposal priced per project from your bills.

Mobile or office line

You can also upload these in your dashboard after submitting, or send them on WhatsApp.

By submitting you agree to be contacted about this project.

We join your AGM remotely

Remote 30-min presentation to your committee or AGM. We bring the financial model for your building and the supply diagrams.

Sized and priced from your common-area bills; a booking of 20% of the system price, capped at RM20,000, credited in full
JMB/MC-style resolution + tender docs
Per-unit electricity cost projection