Self-Consumption First
The primary goal is to reduce your own demand. Generate electricity during the day to power your home or business directly.
Export Credits
Excess energy is exported to the TNB grid. You earn credits based on the prevailing Energy Charge or SMP rates.
10-Year Contract
Secure your energy future with a fixed 10-year connection agreement, ensuring long-term stability and ROI.
Program Comparison
Understanding the nuances between NEM 3.0 and the new Solar ATAP framework is crucial for maximizing your return.
Check Your Eligibility
The Solar ATAP program has strict entry requirements to ensure grid stability and fair access. Use our official checker to verify your status before applying.
Eligibility Checker
Do you have an active TNB account?
Calculate Potential
Estimate your financial returns based on the ATAP credit mechanism. Note that unlike NEM, credits are forfeited if not used within the billing cycle.
Benefit Calculator
Max 15kW for Domestic (3-Phase)
*Includes installation & equipment. Excludes fees.
Capacity Options
System sizes are strictly regulated based on your voltage connection level.
Low Voltage (LV)
For most residential and small commercial properties (230V/400V).
Medium Voltage (MV)
For factories and large facilities (11kV/33kV).
High Voltage (HV)
For maximizing roof potential on large industrial sites.
Application Journey
From eligibility check to commissioning, we handle the entire SEDA & TNB workflow.
Eligibility Check
Verify your account status and load profile.
System Design
Engineer optimal capacity to prevent forfeiture.
e-ATAP Submission
Submit technical drawings to SEDA/TNB.
Installation & COD
Construction and meter change.
Why Partner With Us?
Zero-Loss Sizing
We analyze your 12-month load profile to ensure 100% self-consumption, preventing credit forfeiture.
SEDA Registered
Official RPVSP license holder authorized to handle e-ATAP submissions.
Tier-1 Equipment
Huawei & Longi systems with 25-year performance warranties included.
Full Turnkey
We handle the technical studies (PSS/GIS) required for larger ATAP installations.