End-to-end EPC services for Large Scale Solar (LSS) and Corporate Green Power Programme (CGPP) projects. From grid integration studies to O&M, we deliver maximum yield and grid compliance.
Our consortium partners provide comprehensive engineering, procurement, and construction for utility-scale solar infrastructure across Malaysia.
Site selection, topographical surveys, land acquisition support, and detailed energy yield assessments (EYA).
Power System Studies (PSS), interconnection design, TNB substation upgrades, and PMU/PPU compliance.
Tier-1 modules, central/string inverters, BESS integration, and robust tracker/fixed-tilt mounting structures.
Site clearing, piling, trenching, roadworks, and complete mechanical & electrical installation by CIDB G7 contractors.
Stringent testing protocols, SCADA integration, ST licensing, and synchronization with the national grid.
24/7 remote monitoring, preventive maintenance, drone thermography, and rapid response to maximize PR.

Executing the most ambitious solar infrastructure projects across Southeast Asia to accelerate national grid decarbonization.
Energy Commission bidding programmes for utility-scale solar farms. We support LSS developers with highly competitive EPC pricing, stringent technical designs, and guaranteed performance ratios to ensure winning bids and profitable long-term IPP operations.
Virtual Power Purchase Agreements allowing corporate consumers to physically off-take renewable energy supplied via the national grid. We build world-class merchant plants for developers engaging in CGPP contracts.
Common questions regarding utility-scale solar EPC in Malaysia
As a general rule of thumb in Malaysia, 1 Megawatt (MWac) requires approximately 3 to 4 acres of usable land. This accounts for the panel arrays, access roads, string inverters, and the main step-up substation. The exact ratio depends heavily on site topography and whether fixed-tilt or single-axis tracker structures are utilized.
Yes. Grid interconnection is often the most complex aspect of utility-scale project development. Our engineering teams conduct comprehensive Power System Studies compliant with the Malaysian Grid Code to determine injection point viability, potential grid upgrades required, and ensure seamless ST/TNB approval.
To maximize the levelized cost of energy (LCOE), we typically deploy N-Type TOPCon Bifacial modules paired with high-capacity string inverters (e.g., Huawei SUN2000-330KTL or Sungrow SG350HX). Depending on the subsoil conditions and yield targets, we integrate single-axis tracking systems to significantly boost the performance ratio.

Huawei SUN2000 Commercial

Solis S5-GC Commercial
For LSS, CGPP, IPP, and RM 10M+ commercial mega-projects. Our EPC consortium reviews every qualified submission within 24 hours.