How LSS and CGPP Projects Work
How Large Scale Solar (LSS) and Corporate Green Power Programme (CGPP) projects work. Trexon has not delivered a utility-scale project; we can discuss your plans and refer EPC scope to partners case by case.

What a Utility-Scale EPC Covers
The work streams a utility-scale project needs. Any Trexon involvement would be with partners and scoped per project; this is not a list of delivered projects.
Land & Feasibility
Site selection, topographical surveys, land acquisition support, and detailed energy yield assessments (EYA).
Grid Integration
Power System Studies (PSS), interconnection design, TNB substation upgrades, and PMU/PPU compliance.
Procurement & Supply
Tier-1 modules, central/string inverters, BESS integration, and robust tracker/fixed-tilt mounting structures.
Construction & Civil
Site clearing, piling, trenching, roadworks, and complete mechanical & electrical installation by qualified contractors.
Testing & Commissioning
Stringent testing protocols, SCADA integration, ST licensing, and synchronization with the national grid.
Operations & Maintenance
Remote monitoring, preventive maintenance and drone thermography, with response terms set in the O&M contract.
Utility-Scale Programs

Utility-Scale Solar in Malaysia
Supporting utility-scale solar projects in Malaysia.
Large Scale Solar (LSS)
Energy Commission bidding programmes for utility-scale solar farms. EPC pricing, technical design and performance-ratio targets are set per project in the contract; Trexon would take part only with partners.
- Packages scoped per project
- Strict LCCA optimization
- Advanced Grid Interconnection
Corporate Green Power (CGPP)
Virtual Power Purchase Agreements let corporate consumers buy renewable energy supplied via the national grid. Trexon does not offer or arrange a VPPA; we can quote EPC work for developers building plants for CGPP contracts.
- EPC design and construction
- Offtake contracted directly with the generator
- High-yield bifacial & tracker systems
Project Development FAQ
Common questions about utility-scale solar in Malaysia
How much land is required for a utility-scale solar farm?
As a general rule of thumb in Malaysia, 1 Megawatt (MWac) requires approximately 3 to 4 acres of usable land. This accounts for the panel arrays, access roads, string inverters, and the main step-up substation. The exact ratio depends heavily on site topography and whether fixed-tilt or single-axis tracker structures are utilized.
Do you provide Power System Studies (PSS)?
Not in-house. Grid interconnection is often the most complex aspect of utility-scale project development. Power System Studies to the Malaysian Grid Code are carried out by specialist engineering firms to assess injection point viability and potential grid upgrades, supporting the ST/TNB approval process.
What technologies are typical for LSS?
To minimise the levelised cost of energy (LCOE), LSS plants typically use N-Type TOPCon bifacial modules paired with high-capacity string inverters (e.g., Huawei SUN2000-330KTL or Sungrow SG350HX). Depending on subsoil conditions and yield targets, single-axis tracking systems can raise the performance ratio.

Huawei SUN2000 Commercial

Solis S5-GC Commercial
Propose a Utility-Scale Project
For LSS, CGPP, IPP, and RM 10M+ commercial mega-projects. Our EPC team reviews every qualified submission.