Remote-site power
Assess energy demand, resource availability, fuel logistics and autonomy requirements.
Model your project savings and peak-demand reduction
Calculate ROIAssess energy demand, resource availability, fuel logistics and autonomy requirements.
Document outage exposure, critical loads and acceptable interruption before system design.
Coordinate solar, storage, generator and grid resources around the site duty cycle.
Define dispatch priorities, alarms, data access and operational ownership.
Evidence before claims
The first review defines the data needed for an engineering and commercial model. Final performance, savings and equipment selection depend on verified site inputs.
Battery storage for peak, solar and resilience requirements.
Remote applications where grid supply is absent or unreliable.
Larger generation and grid-connected project development.
How solar and storage can lower generator running hours at remote or backup-dependent sites.
Frame what a generator costs to run today before comparing hybrid options.
Compare ways to fund solar, storage and controls once the requirement is defined.
Share the facility, bill/load information and required outcome. The Trexon team will review it and reply with the next steps.
A microgrid is a set of generation, storage and controls that can supply a defined site either with the grid or, when needed, on its own. Whether it makes sense depends on how costly or risky an interruption is, how much fuel the site burns today and how predictable the load is. We therefore begin with the operating requirement and only then select equipment.
Gather your latest 12 months of TNB bills (or fuel delivery records for an off-grid site), a single-line diagram, photos of the switchboard and meter, a roof or land layout, and a list of critical loads with the autonomy each one needs. If a generator is already installed, note its rating, age and average running hours. Interval or half-hourly data, where available, makes the model considerably more accurate.
We compare solar-only, solar with battery energy storage and hybrid designs that keep a generator as backup, against your current cost and reliability. For fully remote sites, see our off-grid solar guidance, and for tower or telecom sites read about diesel replacement for telco towers. Final equipment, performance and savings are confirmed only after the site data has been verified.