Skip to main content

Model your project savings and peak-demand reduction

Calculate ROI

Facility energy performance

Energy-efficiency projects grounded in how your facility actually operates

Use bills, equipment schedules and measured loads to identify audit, HVAC, lighting, maximum-demand and monitoring priorities before making savings claims.

Request a project assessment

Choose the right starting point

Energy audit

Establish the facility baseline, major energy users and measurement plan.

HVAC and process systems

Review schedules, controls and equipment performance against operating demand.

Maximum-demand management

Identify when peaks occur and which controllable loads contribute.

Monitoring and verification

Define meters, dashboards and review responsibilities needed to verify results.

Evidence before claims

Inputs for the preliminary facility review

The first review defines the data needed for an engineering and commercial model. Final performance, savings and equipment selection depend on verified site inputs.

  • Recent electricity bills and tariff category
  • Operating hours, shifts and occupancy or production schedule
  • Major equipment list and available sub-meter data
  • Maximum-demand or interval-load history where available
  • Known comfort, reliability or maintenance issues
  • Required outcome and preferred implementation timeline
Commercial Solar

Submit the Project Brief

Share the facility, bill/load information and required outcome. Trexon creates a commercial lead, Deal Room and engineering follow-up automatically.

  • Custom system design for your business
  • ROI analysis based on your electricity usage
  • Flexible financing: PPA, IPP, bank loans
  • Solar ATAP, TNB and ST documentation support

Request a Quote

Fill in your details and our B2B team will review your request during business hours

Your details are used only to assess and respond to this project request.