Skip to main content
Skip to main content

Model your project savings and peak-demand reduction

Calculate ROI
GITA 60% Tax Allowance Expires December 31, 2026 — Glove factories: claim RM115K–RM151K in tax savingsCheck Eligibility
Rubber Glove & Latex Manufacturing

Solar for
Glove Factories
RM500K Annual Savings

Malaysia's rubber glove industry faces a dual threat: TNB's 14.2% tariff hike and EU CBAM carbon penalties from 2026. A 500 kWp solar system eliminates both — cutting your energy bill by RM500K/yr and erasing your Scope 2 carbon footprint for EU export compliance.

SEDA Licensed Contractor ISO 9001:2015 Certified 25-Year Performance Warranty EU CBAM / TCFD Data Ready MARGMA-Aligned Compliance Reports
Case Study — Meru, Klang

Latex Dipping Plant, Meru Industrial Zone
RM973,000 Annual TNB Savings

A 500 kWp high-density solar array on a 7,200 sq ft flat roof at a dipping line facility. The 24/7 vulcanization ovens created a perfect baseload profile for solar offset. CBAM-ready carbon reports delivered to EU distributors within 3 months of commissioning.

500 kWp
System Size
RM81,083
Monthly Saving
3.1 yrs
Net Payback
RM151K
GITA Tax Saved

CBAM + GITA Double Win

Solar simultaneously solves your EU carbon liability and your GITA tax window. Miss December 31, 2026 and you lose both benefits.

  • EU CBAM Scope 2 elimination report
  • GITA 60% capex allowance claim
  • MD charge peak shaving analysis
Request CBAM Audit
Glove Factory Savings Models

Savings by System Size — Rubber & Latex Plants

Based on 45.62 sen/kWh TNB tariff, RM97.06/kW MD charge, and GITA 60% allowance. Green loan financing from 3.5% p.a. reduces effective payback to 2.5–3.5 years.

100 kWp
RM230,000
Annual SavingsRM80K–100K/yr
Payback Period3.8 yrs
GITA Tax SavedRM33,120
Run Full Model →
250 kWp
RM550,000
Annual SavingsRM200K–250K/yr
Payback Period3.3 yrs
GITA Tax SavedRM79,200
Run Full Model →
Popular
300 kWp
RM660,000
Annual SavingsRM240K–300K/yr
Payback Period3.2 yrs
GITA Tax SavedRM95,040
Run Full Model →
Best ROI
500 kWp
RM1,050,000
Annual SavingsRM400K–500K/yr
Payback Period2.8 yrs
GITA Tax SavedRM151,200
Run Full Model →

Solar vs TNB Grid: 25-Year Cost Comparison

For a 500 kWp system at a glove plant consuming 1,400,000 kWh/year. TNB tariff escalation at 5% p.a. (conservative).

PeriodTNB Grid CostSolar CostYou Save
Year 1RM638,680RM346,500RM292,180
Year 5RM775,600RM346,500RM429,100
Year 10RM990,400RM346,500RM643,900
Year 15RM1,264,000RM0 (paid off)RM1,264,000
Year 25 TotalRM19.6MRM1,050,000RM18.55M

Projections based on current TNB E2/E3 tariff. Actual savings may vary. Request a site-specific model.

Why Glove Manufacturers Choose Trexon

Built for the 24/7 baseload demands of rubber and latex manufacturing.

EU CBAM Export Defense

Third-party verified Scope 2 elimination reports accepted by EU distributors. Protect your market access from 2026 carbon border adjustments.

MD Charge Peak Shaving

500 kWp offsets 300–400 kW measured demand — saving RM26,781–RM35,708/month on MD charges from dipping line startup surges.

Post-Pandemic Cost Recovery

Lock in energy costs for 25 years. With GITA + green financing, effective payback drops to 2.5–3.5 years — faster than any industry benchmark.

Get a proposal

Get your glove factory's GITA + CBAM savings estimate

Share five quick details. Our B2B team will review your request and prepare a tailored savings estimate — no upfront cost.

By submitting you agree Trexon may contact you via WhatsApp, call, or email about your rubber glove manufacturing solar enquiry. No spam.

Frequently Asked Questions

Common questions from glove factory operations and finance teams.

What makes glove factories ideal candidates for large solar systems?
Glove factories combine two critical advantages: massive flat rooftops (3,000–10,000 sq ft per building) and 24/7 high-baseload operations from dipping lines and vulcanization ovens. This means large system sizes (300–500+ kWp) are feasible and the bill reduction is maximized because daytime solar offsets peak production hours directly.
How does EU CBAM affect rubber glove exports?
The EU Carbon Border Adjustment Mechanism (CBAM) is in its reporting phase now, with full financial penalties from 2026. Glove exporters will need to report embedded carbon per 1,000 boxes. Solar directly eliminates Scope 2 emissions (the largest component), dramatically reducing your carbon intensity and avoiding tariff penalties on EU-bound shipments.
What is the Maximum Demand charge for a typical glove factory?
Under TNB tariff E2/E3, the MD charge is RM97.06/kW per month on the highest 30-minute measured demand. A glove plant drawing 600 kW peak pays RM58,236/month in MD charges alone. A 500 kWp solar system offsets 300–400 kW of measured demand, saving RM26,781–RM35,708/month from MD charges.
How does GITA apply to glove manufacturers?
Under GITA, 60% of qualifying solar capex is deducted from statutory income. For a RM1.05M (500 kWp) system, that is RM630,000 deducted from taxable income — saving RM151,200 in corporate tax (24% rate). The system must be commissioned by December 31, 2026.
Can Trexon handle post-pandemic cost optimization projects quickly?
Yes. Trexon has a pre-approved project pipeline and SEDA-licensed installation teams. From site survey to commissioning typically takes 8–16 weeks for systems up to 500 kWp. We also support green loan applications from 3.5% p.a., minimizing upfront capital required.
Limited Slots — GITA Deadline Dec 31, 2026

Defend Your Margins & EU Export Status

Trexon handles site survey, GITA filing, CBAM carbon reporting, and green loan application — all under one roof.

Free 60-Second Quote

Get your solar savings estimate in 60 seconds

Malaysia's most accurate calculator. No phone number required. Save up to 90% on your TNB bill.

Trexon Energy logo

Malaysia's SEDA-licensed solar partner since 2020. We design, finance, and install residential, commercial, industrial, and off-grid solar systems.

Registered Office

Thither Global (M) Sdn Bhdtrading as Trexon Energy

G-06-28, Level 6, Block G, Sunway Geo Avenue
Jalan Lagoon Selatan, 47500 Subang Jaya
Selangor, Malaysia

SSM: 201301044881 (1074704-D)

SEDA Licence: SEDA-RPVSP-2026/373

SEDA
RPVSP licensed
TNB
Solar ATAP ready
Tier-1
Panels & inverters
RM0
Upfront options
25-yr
Panel warranty
SEDA RPVSP Licensed(SEDA-RPVSP-2026/373)
TNB Solar ATAP Certified
SIRIM Certified Products
ISO 9001:2015
MPIA Member

© 2026 Thither Global (M) Sdn Bhd (201301044881). Trading as Trexon Energy. All rights reserved.

MalaysiaMade with in Subang Jaya