Model your project savings and peak-demand reduction
Calculate ROISolar for Government, GLCs & Local Councils
From federal ministry rooftops in Putrajaya to PBT depots in Selangor and state-owned hospitals in Sarawak. Trexon supports your eP, MyGOV*Plus, JKR D-tender, and UPEN procurement with solar design and technical documentation to MS 1837 and JKR specifications.

Illustrative solar concept. Site design follows engineering assessment.
~9–24 mo (estimate)
Typical procurement cycle
6 pathways
Procurement routes supported
Why government agencies engage Trexon
The technical standards public-sector procurement evaluators look at.
MS 1837 + MS IEC 61724 + JKR Spec
System designs are prepared with reference to MS 1837 (Grid-connected PV systems), MS IEC 61724 (performance monitoring), and JKR Standard Specification 2014 — the three pillars of technically-compliant government solar.
Pathways we deliver under
Six government procurement routes — each with specific technical and commercial requirements we can prepare submissions for.
eP (ePerolehan)
Open competitive tender via Malaysia's national eP portal. Trexon prepares full BOQ, technical schedules, method statements, and financial submissions meeting MOF eP requirements.
MyGOV*Plus / SEPP
Strategic partnership and single-source procurement route for agencies with urgent green energy mandates. Eligibility is set by the agency.
JKR D-tender (M&E)
Works Department (JKR) digital tender for mechanical and electrical works. Trexon prepares JKR-compliant design, BIM coordination, and handover documentation.
UPEN State Tenders
State Economic Planning Units (UPEN) manage large state-funded infrastructure. UPEN tenders can carry local content and sub-contracting conditions set by each state.
KKDW Direct Negotiation
Direct negotiation channel for rural and underserved infrastructure under KKDW. Suitable for off-grid community solar, rural hospital PV, and remote school electrification above the MOF threshold.
GLC RFP (TNB, Petronas, Khazanah subs)
RFP and panel submission routes for Khazanah, PNB, EPF, KWAP, MOF Inc, Pelaburan Hartanah, Telekom, TNB, and Petronas subsidiaries. Each GLC sets its own vendor registration requirements; check them before bidding.
Asset types
Five categories of government and GLC-owned assets that commonly use solar — each with distinct grid, structural, and compliance requirements.
Ministry HQ & Agency Campuses
Putrajaya, Cyberjaya federal precinct buildings
Large rooftop arrays on ministry headquarters (e.g. PETRA, KKR, KKM, MOE, KKD). Putrajaya campus designs can integrate BIPV cladding, covered walkways, and car park canopy systems.
Government Hospitals
KKM, UMMC, HKL-class facilities
24/7 critical load facilities. Designs include grid-parallel solar with no single point of failure, isolation from OT/ICU supply rails, and TNB-approved protection relay coordination.
Schools & Universities
MOE secondary schools, UiTM, UPM, UTM campuses
MOE school rooftops are often 100–400 kWp; university campuses 500 kWp–5 MWp. Trexon can prepare design, BQ and installation submissions under MOE and Ministry of Higher Education procurement frameworks.
PBT Depots, Town Halls & Libraries
DBKL, MBPJ, MBSA, MPSJ, and other local councils
Local councils (PBT) hold large rooftop portfolios — depots, civic centres, sports complexes. Trexon can prepare submissions for the UPEN or direct-award procurement route, depending on the PBT's jurisdiction.
GLC Office Towers & Operational Sites
Khazanah subs, Telekom, TNB, Petronas, PLUS concessions
From PLUS highway rest stops to Petronas operational land, KWAP property portfolios, and TNB substations — GLC sites come with asset governance and Bursa sustainability disclosure (NSRF/ISSB) requirements.
Compliance pack — what we submit with every tender
Every government submission includes full technical compliance evidence — not just marketing materials.
MS 1837 / MS IEC 61724
Grid-connected PV system and performance monitoring standards.
JKR Standard Specification 2014
Technical handover, testing & commissioning documentation.
How we take you from RFP to JKR handover
Five stages — from the moment a tender is gazetted to the day the certificate of practical completion is issued.
RFP Review & Eligibility Assessment
Send us the tender document, technical schedules, and financial conditions and we will reply with the next steps. Eligibility gaps (contractor registration grade, Bumiputera participation, financial standing) are flagged early so consortium structuring can begin.
Consortium Structuring
For tenders requiring Bumiputera participation floors or specific equity splits, we structure the delivery consortium — identifying the right registered partners while Trexon leads technical execution.
Technical Compliance Dossier
Full technical submission: load assessment, system design drawings, single-line diagrams, product datasheets, MS 1837 compliance schedule, JKR method statements, and BIM models where required.
Financial & Commercial Submission
BOQ pricing, payment milestone schedule, bank guarantee provision, performance bond structuring, and financial statements prepared to eP/JKR/UPEN financial submission format.
Delivery + JKR Handover
On-site delivery team with a named project lead. Final handover includes TNB commissioning documents, JKR defect liability period documentation, O&M manual, and monitoring dashboard handover.
Speak directly with our procurement team
Tender window closing soon? Send us your RFP documents and we will reply with the next steps.
Related guides for public sector buyers
Procurement teams usually need the technical case alongside the tender route. Our government and public sector solar page covers the building types and ownership models, and the ESCO model explains how ESCO and third-party arrangements are structured (Trexon does not offer PPAs or zero-capex). For sites with high maximum demand, commercial battery storage and commercial solar describe the sizing method we use.
Schools and campuses are common public-sector sites; see solar for schools and campus solar. Funding routes are compared in commercial solar financing.
Request Tender Response Capability Statement
Send us your tender reference and we will reply with a capability statement covering our SEDA RPVSP registration and technical standards. No obligation, no consultant fees.