Skip to main content
Skip to main content

Model your project savings and peak-demand reduction

Calculate ROI
Enterprise Campus Solutions

Solar Solutions for Universities & Campuses

Lower peak demand charges, integrate with your BMS, and monitor every building from a single dashboard. Purpose-built for multi-building educational campuses.

SEDA Documentation Support
TNB Application Support
References On Request
MD shaving design
BMS integration
Illustrative Malaysian university campus with rooftop solar
AI-generated concept · not a completed Trexon installation

Typical University System

500 kWp for mid-sized campus

Per bill

Savings modelled

30-min

MD interval tracked

Payback PeriodCalculated per project
Booking20% of the system price, capped at RM20,000, credited in full
CO2 Offset/Year~466 Tonnes

MD Shaving

Reduce Peak Demand

Understanding Your Challenges

Campus Energy Challenges

Universities face unique energy challenges that require enterprise-grade solutions. Here is what campus facility managers deal with daily.

Peak Demand (MD) Charges

Maximum demand charges are a large share of total electricity costs for campuses with variable loads

Bill-based

MD charge per kW, from your TNB bill

Multi-Building Complexity

Managing energy across lecture halls, labs, hostels, and admin buildings with different usage patterns

10-50

buildings typical

Air Conditioning Load

HVAC during peak class hours (8am-5pm) creates predictable but expensive demand spikes

Significant

share of energy usage (varies by campus)

24/7 IT Infrastructure

Data centers, servers, and WiFi infrastructure require constant power regardless of occupancy

24/7

continuous load

Peak Demand Reduction

MD Shaving Solutions

Maximum Demand (MD) charges are a large share of campus electricity costs. Our solar + storage solutions specifically target peak demand reduction.

How MD Charges Work

TNB measures your peak power draw (kW) in any 30-minute window during the billing period. This single highest reading determines your MD charge for the entire month.

On MV General, a brief AC startup surge at 10am can cost you RM 35,708 in MD charges for the entire month (example: 400 kW × RM89.27/kW)

Solar Peak Generation

Solar production peaks during daytime hours when campus demand is highest, naturally reducing grid draw

Battery Peak Shaving

Store solar energy and discharge during peak demand periods to flatten consumption curves

Predictive Load Management

Load forecasting aligns battery dispatch with class schedules and campus events

Real-time MD Alerts

Get instant notifications when approaching MD thresholds to trigger demand response strategies

Smart Building Integration

BMS Integration

Seamlessly connect solar generation with your existing Building Management System for intelligent campus-wide energy optimization

Seamless BMS Integration

Inverter monitoring and Modbus data export for your BMS integrator to connect; integrations with BMS platforms such as Johnson Controls, Honeywell and Siemens are third-party work

BACnetModbusLONKNX

Automated Load Shedding

Automatically reduce non-critical loads when solar generation drops or demand approaches limits

HVAC stagingLighting controlEV charging

Campus-Wide Orchestration

Coordinate energy flow between buildings, optimizing the entire campus as a single energy ecosystem

Building clusteringPriority queuingLoad balancing

IoT Sensor Network

Deploy smart sensors for occupancy, temperature, and power monitoring across all facilities

LoRaWANZigbeeWiFi 6

Compatible with common BMS platforms

Honeywell
Johnson Controls
Siemens
Schneider
Trane
A Malaysian school block with rooftop solar panels and a playing field in front
Campus Energy Dashboard (illustrative data)

614 kW

Total Generation

614 kW

Grid Offset

1,245 kW

Current Demand

Engineering Block156 kW generating
Admin Building89 kW generating
Library Complex124 kW generating
Hostel A-D245 kW generating
Enterprise Monitoring

Multi-Meter Dashboard

Monitor every building, every meter, every faculty from a single unified dashboard. Track energy production, consumption, and costs in real-time.

Real-Time Energy Flow

Visualize power generation and consumption across every building in real-time

Faculty-Level Billing

Track energy usage per department or faculty for internal cost allocation

Historical Analytics

Compare performance across semesters, identify trends, and optimize operations

Automated Reporting

Generate monthly reports for management, sustainability committees, and compliance

How It Works

How a Campus Engineering Review Works

What we need from your facilities team, and what the review produces

Campus Engineering Review

What we need from you

No client results are shown here — your figures come from your own bills.

12 months

TNB bills (min 6)

Roof plans

Per building

SLD

Single-line diagram

Meter photos

Each supply point

We read maximum demand and load shape from your own bills and interval data

Each building's roof is assessed for usable area and shading

System size, price and payback are worked out per project

BMS integration is scoped against your existing system

A booking of 20% of the system price, capped at RM20,000, credited in full, locks in your slot and engineering review

Benefits for Educational Institutions

Beyond electricity savings, solar transforms your campus into a showcase for sustainability

Lower MD Charges

Solar plus battery storage targets the demand peaks that set your MD charge, modelled from your own bills

Green Campus Certification

Support for MyHIJAU, UI GreenMetric ranking, and corporate sustainability reporting requirements

Living Laboratory

Transform your solar installation into an educational resource for engineering and sustainability courses

Operating Cost Control

Predictable energy costs with 30-year panel performance warranties and minimal maintenance

Carbon Neutrality Path

Measurable progress toward Net Zero campus goals with tracked carbon reductions

Energy Security

Reduce dependency on grid power and protect against tariff increases and supply disruptions

Recommended System Sizes

Choose the right solution based on your campus size and energy requirements

Community College

1-5 Buildings

System Size100-300 kWp
InvestmentPriced per project
Monthly SavingsModelled from your bills
  • Basic monitoring
  • Single-meter setup
  • Standard warranty
RECOMMENDED

Private University

5-15 Buildings

System Size300-1,000 kWp
InvestmentPriced per project
Monthly SavingsModelled from your bills
  • Multi-meter dashboard
  • BMS integration
  • MD shaving
  • Faculty billing

Research University

15+ Buildings

System Size1-5 MWp
InvestmentPriced per project
Monthly SavingsModelled from your bills
  • Enterprise monitoring
  • Full BMS integration
  • Battery storage
  • Microgrid capable
  • Ownership or hire purchase
Implementation Timeline

Campus Solar Implementation Process

A structured approach to minimize campus disruption while maximizing ROI

1
Phase 12-4 weeks

Campus Energy Audit

Comprehensive analysis of consumption patterns, MD profile, BMS infrastructure, and rooftop capacity across all buildings

2
Phase 22-3 weeks

System Design & ROI Modeling

Custom system design optimized for MD reduction, with detailed financial projections and carbon offset calculations

3
Phase 34-8 weeks

Procurement & Approvals

TNB approval, SEDA registration, and coordination with university procurement for LPO/tender process

4
Phase 48-16 weeks

Phased Installation

Building-by-building installation during semester breaks to minimize campus disruption

5
Phase 52-4 weeks

BMS Integration & Commissioning

System integration with existing BMS, dashboard deployment, staff training, and go-live

Commercial Solar

Get a Custom Solar Proposal for Your Campus

Tell us about your business and we'll design a solar system that matches your energy needs and budget.

  • Sizing from your 12 months of TNB bills and shift pattern
  • Roof, switchboard and single-line diagram reviewed by our engineers
  • Available incentives (GITA for solar, subject to MGTC verification) and Solar ATAP eligibility checked for your premises
  • SEDA-registered PV Service Provider (RPVSP-2026/373) · SSM 201301044881 (1074704-D)

Prefer to talk first? Message our commercial team on WhatsApp.

WhatsApp Us

Send your project brief

Tell us about the site and we will prepare an education solar proposal priced per project from your bills.

Mobile or office line

You can also upload these in your dashboard after submitting, or send them on WhatsApp.

By submitting you agree to be contacted about this project.

For Facility Managers & University Administration

Ready to Transform Your Campus Energy Profile?

Schedule an enterprise consultation to discuss your campus energy challenges and receive a customized MD reduction proposal

Protected Connection
Gateway Payment
Terms Confirmed Before Payment
Server-Verified PricingOrder-Specific Payment RecordDashboard Order Tracking

For university facility managers:

MD Reduction Design
BMS Integration Design
SEDA-registered (RPVSP)