Build your solar plan — no payment until you approve
Configure solarSolar Panel Malaysia 2026 — From RM14,999
Malaysia's First Fully Digital Solar Platform
Trexon Energy is a SEDA-licensed solar company in Malaysia delivering residential and commercial solar panel installations from Selangor to Sarawak. NEM 3.0 (Solar ATAP) approved. Save 40–90% on your TNB bill — guaranteed.
Free remote quote · RM100 credited priority site visit · SEDA-certified engineers
Why Go Solar in Malaysia 2026?
Malaysia receives among the highest solar irradiation in Asia — 4.5 to 6 peak sun hours daily. Combined with TNB's rising electricity tariffs and government incentives, the case for solar energy in Malaysia has never been stronger.
Save 40–90% on TNB Bills
Solar panels offset your daytime TNB consumption directly. Most homeowners cut bills by RM300–1,200/month. Businesses save 40–90% on electricity costs with systems sized to your actual load profile.
NEM 3.0 / Solar ATAP Credit
Under Malaysia's NEM 3.0 scheme, excess solar energy exported to TNB earns RM0.31/kWh credit (residential). Your TNB meter runs backwards — generating passive income from your rooftop around the clock.
GITA 60% Tax Deduction
Malaysian businesses qualify for Green Investment Tax Allowance (GITA): 60% of qualifying capital expenditure offset against statutory income. A RM100,000 solar system yields RM60,000 in immediate tax savings for Sdn Bhd companies.
Property Value +5–10%
Properties with solar panels in Malaysia command a 5–10% premium at resale. Solar is increasingly a sought-after feature in Klang Valley, Penang, and Johor Bahru property markets.
Solar Panel Malaysia Price List 2026
All prices are for fully installed systems including Tier-1 solar panels, hybrid-ready inverter, mounting structure, DC/AC wiring, earthing, SEDA Solar ATAP application, and TNB interconnection fees.
* Prices are indicative. Final price is confirmed after the RM100 priority site visit, fully credited when proceeding, and may vary by roof type, system complexity, and location.
Solar Solutions for Every Property Type in Malaysia
Whether you own a terrace house in Petaling Jaya, a factory in Shah Alam, or a warehouse in Port Klang — Trexon Energy has a solar solution engineered for your specific property type and energy needs.
Residential Solar
Homes, bungalows, semi-D, terrace houses across Malaysia
Learn moreCommercial Solar
Offices, retail outlets, shophouses, SMEs
Learn moreFactory / Industrial
Manufacturing plants, large-scale EPCC contracts
Learn moreWarehouse Solar
Logistics, cold storage, distribution centres
Learn moreOff-Grid Systems
Remote sites, farms, islands, rural areas without TNB access
Learn moreAgrivoltaics
Dual-use solar on agricultural land — earn from farming and solar
Learn moreHow Solar Installation Works in Malaysia
From your first enquiry to NEM 3.0 activation, the entire process takes 4–8 weeks. Trexon Energy manages every step — you simply approve and enjoy the savings.
RM100 Priority Site Visit
Our engineers inspect roof orientation, shading, structural conditions and the electrical scope on site. The full RM100 is credited when you proceed.
Custom System Design (AI-Powered)
An engineering simulation generates a rooftop layout, energy-yield forecast and ROI projection after the required site inputs are verified.
TNB & SEDA Application
We handle all paperwork: SEDA Solar ATAP (NEM 3.0) application, TNB interconnection approval, and any local authority permits. You don't need to visit any government office.
Professional Installation (1–3 Days)
Our CIDB-registered installation crew completes the physical installation in 1–3 days with minimal disruption. All work meets TNB wiring regulations and IEC/SIRIM standards.
Commissioning & NEM Activation
System testing, TNB bidirectional meter installation, NEM 3.0 activation, and full handover training. Your solar is live, grid-connected, and earning NEM credits from day one.
Top Solar Panel Brands We Install in Malaysia
Trexon Energy exclusively sources Tier-1 solar panels rated by Bloomberg New Energy Finance — the same brands powering utility-scale solar farms across Malaysia. All panels carry 25-year performance warranties.
Jinko Solar
Tiger Neo 620W
World's #1 solar panel supplier
LONGi Solar
Hi-MO 7 Series
Industry-leading HPBC cell technology

Trina Solar
Vertex S+ 625W
Top 5 global solar manufacturer
Canadian Solar
HiKu7 CS7N
Trusted globally in commercial projects
Solar Financing Options in Malaysia
Going solar in Malaysia does not require large upfront capital. Multiple flexible financing options are available — from green bank loans to zero-upfront PPA.
Bank Green Loans
Maybank, CIMB, RHB, BSN
Green financing products from major Malaysian banks at preferential rates (typically 3.5–5% p.a.). Suitable for larger residential and commercial solar systems.
Learn moreZero Upfront PPA
Power Purchase Agreement
No capital outlay required. We own and maintain the system — you buy solar electricity at a discounted rate (typically 20–30% below TNB tariff). Ideal for businesses.
Learn moreSolar Company in Malaysia — We Cover 20+ Cities
As a trusted solar company in Malaysia, Trexon Energy operates across Peninsular Malaysia, Sabah, and Sarawak. Our CIDB-certified installation teams deliver fast turnaround and quality workmanship nationwide.
Frequently Asked Questions — Solar Panel Malaysia
Everything you need to know about solar panels in Malaysia — pricing, installation, NEM 3.0, warranties, and how to get started with Trexon Energy.
How much do solar panels cost in Malaysia?
Solar panel systems in Malaysia range from RM14,999 for a basic 3kW system to RM45,000+ for a 12kW system. A popular 6kW residential package (suitable for RM300–500 TNB bills) costs RM22,500–RM26,000 fully installed. This includes panels, inverter, mounting structure, wiring, and all SEDA/TNB application fees. Get a free personalised quote at trexon.my/calculator.
Is solar worth it in Malaysia?
Absolutely. Malaysia's equatorial sun provides 4.5–6 peak sun hours daily — among the best in the world. Combined with rising TNB tariffs, most homeowners achieve payback in 5–8 years, after which the system generates free electricity for 20+ years. Under NEM 3.0 (Solar ATAP), any excess power exported to TNB earns RM0.31/kWh credit. Businesses additionally qualify for GITA 60% tax deduction on qualifying capital expenditure.
How long does solar installation take in Malaysia?
Physical installation is completed in 1–3 days. The full process — from the RM100 credited priority site visit to TNB grid connection — typically takes 4–8 weeks. Key milestones include the Solar ATAP application, TNB metering change and system commissioning. Trexon handles the paperwork and authority coordination.
What is NEM 3.0 / Solar ATAP?
NEM 3.0 (Net Energy Metering 3.0), branded as Solar ATAP, is Malaysia's government scheme allowing solar owners to export excess energy to TNB at RM0.31/kWh (residential) and receive an equivalent bill credit. Managed by SEDA, it replaced the earlier Feed-in Tariff (FiT) programme. Capacity limits: residential up to 12kW, commercial up to 425kW (Peninsular Malaysia).
How much can I save with solar panels in Malaysia?
Typical monthly savings: RM200 TNB bill — save RM100–150/mo with 3kW; RM350 bill — save RM200–280/mo with 5kW; RM500 bill — save RM350–450/mo with 6kW; RM800 bill — save RM500–650/mo with 8kW; RM1,200+ bill — save RM700–1,000/mo with 10–12kW. Businesses with RM5,000–50,000/month TNB bills typically save 40–70%. Use our free calculator at trexon.my/calculator for a personalised estimate.
Do I need planning permission for solar panels in Malaysia?
Most residential solar installations (below 72kW) in Malaysia do not require separate local authority planning permission (e.g., MBPJ, MPAJ, DBKL). You need: (1) SEDA approval for NEM 3.0/Solar ATAP scheme, (2) TNB approval for grid connection. For large commercial/industrial systems above 72kW, additional permits from Suruhanjaya Tenaga may apply. Trexon Energy handles all regulatory approvals.
What warranty do solar panels have in Malaysia?
Quality solar panels installed by Trexon Energy carry: 25-year linear power output warranty (guaranteed to produce 80%+ rated output); 10–12 year product/materials warranty; 5–10 year inverter warranty (Huawei, SolarEdge, Solis); 5-year workmanship warranty on installation. All panels are Tier-1 rated by Bloomberg New Energy Finance.
How do I apply for solar in Malaysia?
Getting solar with Trexon Energy is simple: (1) Get a free remote quote; (2) Book the RM100 priority site visit, fully credited when proceeding; (3) Receive the reviewed custom design and quotation; (4) Choose financing; (5) Sign the agreement while we handle SEDA and TNB applications; (6) Installation in 1–3 days; (7) TNB grid connection and Solar ATAP activation.
Still have questions? Our solar advisors are ready to help.
Solar Panel Malaysia — In-Depth Guides
Detailed articles on solar panel pricing, installation, NEM 3.0 applications, and brand comparisons for the Malaysian market.
Solar Panel Price Malaysia — Complete Cost Breakdown 2026
Detailed breakdown of what you pay for: panels, inverter, mounting, installation labour, permits, and hidden costs explained.
Panduan BMHarga Solar Panel Malaysia 2026 — Panduan Lengkap
Panduan lengkap harga solar panel Malaysia 2026 termasuk kos pemasangan, ROI, dan insentif kerajaan terkini.
NEM 3.0 GuideCara Mohon NEM 3.0 / Solar ATAP Malaysia 2026
Step-by-step guide to applying for NEM 3.0 / Solar ATAP in Malaysia: SEDA application, requirements, and timeline.
Brand ReviewBest Solar Panel Brand in Malaysia 2026 — Jinko vs LONGi vs Trina
Independent comparison of Tier-1 solar panel brands available in Malaysia with performance data, warranties, and price-per-watt analysis.
InstallationSolar Panel Installation Process Malaysia — 4-Week Timeline
Complete step-by-step guide to the solar installation process from site survey to TNB grid connection in Malaysia.
Government SchemeNEM 3.0 Malaysia — Complete Guide to Solar ATAP 2026
Everything about Malaysia's Net Energy Metering 3.0 — quotas, tariffs, eligibility, and how to maximise your NEM credit with TNB.
Ready to Go Solar in Malaysia?
Join hundreds of Malaysian homeowners and businesses who have switched to solar energy with Trexon Energy. Get your free, no-obligation quote today.
SEDA licensed · Solar ATAP support · RM100 credited site visit · 5-year workmanship warranty
Trexon Energy Sdn Bhd
Sunway Geo Avenue, Bandar Sunway, 47500 Selangor · energy@trexon.my · +60 12-770 7249
Written by Chandra Rau, CEO · Trexon Energy Sdn Bhd · Updated March 2026
Explore More Solar Resources
Solar Pricing Malaysia 2026
Detailed price list for all system sizes
Solar Savings Calculator
Calculate your exact monthly savings
Financing Options
Bank loans, hire purchase, zero-upfront PPA
NEM 3.0 / Solar ATAP Guide
Complete guide to Malaysia's net metering
Residential Solar
Solar for homes and landed properties
Commercial Solar
Solar for offices, retail, and SMEs
Factory Solar
Industrial-scale solar EPCC
EV Chargers
Pair solar with EV charging
Solar Locations
Coverage across all Malaysian states
Solar Price Guide 2026
Full cost breakdown article
Cara Mohon Solar ATAP
Panduan lengkap permohonan Solar ATAP
Harga Solar Panel Malaysia 2026
Panduan harga terlengkap
Trust & Quality Assurance
Does Trexon handle Solar ATAP and TNB paperwork?
Yes. Trexon prepares the Solar ATAP, TNB, ST, and grid-connection documentation needed for your project. Residential systems use Tier-1 panels with a Solis Value or Huawei Premium inverter ecosystem.
What warranty does Trexon provide?
We provide a comprehensive warranty package: 25-year performance warranty on solar panels (guaranteed 80%+ output at year 25), 10-year manufacturer warranty on inverters (extendable to 15-20 years), 10-year workmanship warranty on installation, and 1 year of free monitoring and maintenance. Our equipment comes directly from authorized distributors — no grey market products.
What happens if my solar system underperforms?
Residential monitoring is brand-matched: Solis Value uses SolisCloud and Huawei Premium uses FusionSolar. Trexon commissions the selected platform and provides the monitoring scope stated in the accepted proposal.