Updated March 2026: One of the most common questions we get is: "What is the price of solar panels in Malaysia?" As of March 2026, our packages start from RM16,499 all-inclusive — with Solar ATAP bill credits now active and new Jinko 625W panels available. Here is the transparent, up-to-date pricing guide.
2026 Solar System Prices in Malaysia — By Package Size
All prices below are all-inclusive turnkey (supply, install, SEDA submission, TNB meter). Jinko 620W panels, Solis inverter base price:
- Starter — 5.58 kWp (9 panels): from RM 16,499 (Solis) | Huawei from RM 18,499 | Sungrow from RM 19,499
- Popular — 8.68 kWp (14 panels): from RM 20,499 (Solis) | Huawei from RM 22,499 | Sungrow from RM 23,499
- Large — 19.84 kWp (32 panels): from RM 35,999 (Solis) | Huawei from RM 37,999 | Sungrow from RM 38,999
Brand premiums vs Solis base: Huawei +RM2,000 | Sungrow +RM3,000
Average Solar System Costs — By House Type
Typical all-in prices based on house category:
- Landed Terrace (5 - 6 kWp): from RM 16,499
- Semi-D / Corner (8 - 10 kWp): from RM 20,499 – RM 26,000
- Bungalow (15 kWp+): from RM 30,000
- Commercial / Factory: Custom quote — contact us
Cost Components Breakdown
Where does your money go?
- Hardware (55%): Panels (Jinko 620W), Inverters (Solis / Huawei / Sungrow), Mounting structure.
- Labor & Transport (20%): Skilled certified installation, logistics.
- Permitting (15%): SEDA submission fees, TNB meter upgrades, PE licensing.
- Warranty & Support (10%): 25-year panel warranty, 10-year inverter warranty, monitoring app.
Which Inverter Brand Should You Choose?
All three brands we supply are Tier-1 with SEDA approval. Here is a quick comparison:
- Solis — Best value, reliable performance, ideal for budget-conscious buyers.
- Huawei (MAP0 series) — Premium smart monitoring, industry-leading AI optimisation, +RM2,000 premium. Best for tech-savvy homeowners.
- Sungrow — Mid-premium, excellent warranty support, strong BESS (battery) integration, +RM3,000 premium.
Hidden Costs to Watch Out For
1. Meter Upgrade Fees
If your house uses single-phase power but you install a system larger than 6kW, you must upgrade to 3-phase. TNB charges ~RM 400–800 for this.
2. Scaffolding / Crane
For roofs higher than 2 storeys, safety regulations require scaffolding, adding RM 1,000–2,000 to the bill.
Return on Investment (ROI)
With an average monthly TNB bill of RM 500, the popular 8.68 kWp system (from RM 20,499) saves roughly RM 400–450/month.
Payback Period: ~4.5–5 years. Solar ATAP export bill credits can reduce this further depending on your export volume.
After payback, the system generates free electricity for 20+ more years — total savings of RM 80,000–120,000 over its lifetime.
Hardware quality matters — cheaper panels degrade faster in Malaysia's heat. See our best solar panels Malaysia 2026 review to compare brands before you buy.
Ready to see exact package prices for your home size? Our complete solar pricing page lists all available systems with transparent, all-inclusive costs — no hidden fees.
For a deeper breakdown of cost factors, warranties, and what different system tiers include, read our complete ROI & payback guide. If you already know your budget, see latest solar panel packages starting from RM16,499.
Want to see real-world costs for your house type? Our guide to solar panel costs for houses covers three detailed scenarios — terrace (RM18K), semi-D (RM28K), and bungalow (RM45K) — with 25-year savings projections. Baca dalam Bahasa Malaysia: Kos Pasang Solar Panel Rumah Malaysia 2026.