One of the most common questions we get is: "What is the price of solar panels in Malaysia?" Prices have dropped 15% since 2024. Here is the transparent pricing guide for 2026.
Average Solar System Costs (Before Incentives)
Typical turnkey prices for Tier-1 equipment (Longi, Jinko, Trina):
- Landed Terrace (4 - 6 kWp): RM 14,000 - RM 22,000
- Semi-D / Corner (8 - 10 kWp): RM 24,000 - RM 32,000
- Bungalow (12kWp+): RM 35,000+
Cost Components Breakdown
Where does your money go?
- Hardware (55%): Panels (PV modules), Inverters (Huawei/Sungrow), Mounting structure.
- Labor & Transport (20%): Skilled certified installation, logistics.
- Permitting (15%): SEDA submission fees, TNB meter upgrades, PE licensing.
- Warranty & Support (10%): Monitoring, after-sales service.
Hidden Costs to Watch Out For
1. Meter Upgrade Fees
If your house uses single-phase power but you install a system larger than 6kW, you must upgrade to 3-phase. TNB charges ~RM 400-800 for this.
2. Scaffolding / Crane
For roofs higher than 2 storeys, safety regulations require scaffolding, adding RM 1,000 - RM 2,000 to the bill.
Return on Investment (ROI)
With an average monthly bill of RM 500, an 8kWp system (costing RM 28,000) saves roughly RM 450/month.
Payback Period: ~5.1 years (without subsidies) or ~2.5 years (with ATAP subsidy).