Model your project savings and peak-demand reduction
Calculate ROISolar for Semiconductor
Factories | Cut Energy
Costs
For Penang FIZ and Kulim Hi-Tech Park manufacturers whose customers ask for Scope 2 and RE100 reporting — solar can support that data. Claim your GITA 60% tax allowance by commissioning and submitting before December 31, 2026. See also: commercial solar, industrial solar, government solar incentives, contact us.
PCB Assembly Plant
About RM75,200 a Year in Energy Savings
A 200 kWp rooftop system modelled on an 85,000 sq ft PCB assembly plant, with Scope 2 carbon data that could support RE100 reporting. Savings use the MV General energy charge (RM0.2983/kWh) with all output used on site; Maximum Demand savings are not counted.
GITA 2026 Countdown
Systems must be commissioned and the GITA application submitted to MGTC by 31 December 2026. For a RM480K (200 kWp) system, that is up to RM69,120 in corporate tax saved, if the allowance is fully absorbed.
- 60% of capex deducted from statutory income
- Trexon prepares the full MGTC GITA (Asset) application documentation
- LHDN audit-ready documentation
Semiconductor Factory Savings by System Size
Energy-charge savings only, at the MV General rate (RM0.2983/kWh), with all solar output used on site. Prices are RM2,400/kWp before SST. GITA value is shown if the allowance is fully absorbed (60% × 24%). Maximum Demand savings are not counted.
Why Consider Trexon for Semiconductor Plants
Purpose-built for the precision requirements of E&E manufacturing.
RE100 Reporting Support
Scope 2 data reports from your system output, compatible with CDP/GRI/TCFD frameworks. Acceptance is decided by your principal's auditors.
Peak-Demand Analysis
We review your half-hourly demand data before sizing any BESS. Solar alone does not reliably reduce Maximum Demand.
EU Customer Carbon Data
Cut the Scope 2 emissions in your carbon intensity reporting — the data EU customers increasingly request from suppliers.
Get a proposal
Get your fab's RE100 + Scope 2 reduction estimate
Share five quick details. Our commercial team will review your request and prepare a tailored savings estimate at no cost to request.
Frequently Asked Questions
Common questions from semiconductor plant operations and finance teams.
Can a fab plant with 24/7 cleanroom operations benefit from solar?
How does GITA work for semiconductor companies?
Will MNC principals accept our solar generation as Scope 2 evidence?
What is the typical system size for a semiconductor plant?
Does solar affect our facility's TNB Maximum Demand charges?
Protect Your MNC Supply Chain Status
Get a satellite-verified solar proposal for your facility. Trexon handles engineering, GITA filing documentation and Scope 2 data reports.