Factory rooftop project

Solar for Factory Malaysia (Kilang Solar): Rooftop Sizing, Shifts and Payback

Put your factory roof to work. Plan solar around your production shifts, roof condition and electricity demand.

SEDA RPVSP-2026/373 · Priced per project from your bills · Booking 20% of the system price, capped at RM20,000, credited in full

Illustrative Malaysian factory with rooftop solar, clear maintenance aisles and a navy office frontage
AI-generated concept · not a completed Trexon installation

Get a priced proposal for your site

Send the basics now. Documents can follow on WhatsApp or in your dashboard.

Mobile or office line

You can also upload these in your dashboard after submitting, or send them on WhatsApp.

By submitting you agree to be contacted about this project.

Solar for factory sites in Malaysia — kilang solar — means a rooftop system sized to one operating plant's shift pattern, roof and switchboard, so the line runs on its own daytime generation instead of buying those kWh from TNB. It is a different project from a multi-site industrial tariff review: it lives or dies on your shifts, your roof and your switchgear, not a generic industrial average.

This page covers how Trexon sizes a single-site factory system from your bills and shifts, what the roof and electrical assessment checks, how production continuity and safety are handled, and what the first assessment needs — plus a worked example and a short summary for factory managers further down.

Last reviewed: 2026-10-19

What size solar system does a factory need?

Size follows twelve months of TNB kWh and your shift pattern, capped by usable roof area or the Solar ATAP limit — whichever binds first. A single day-shift plant uses almost all of a correctly sized system's output; two or three shifts move load outside sun hours, so the same roof is sized to self-consumption instead. Solar ATAP caps a non-domestic system's inverter output at 100% of maximum demand in kWac, up to 1,000 kW per installation (GP/ST/No. 60/2025 §8.3 and §8.5). The worked example below shows the method.

Industrial solar panels for factories: system types

Industrial solar panels on a factory are not one product. The same Jinko N-type modules can sit on the production-hall roof, over the staff car park, on spare land inside the fence, or feed a hybrid inverter with a battery behind it. Which layout fits depends on how much load-bearing roof the plant has, whether there is yard space it can give up, and whether the bill carries a maximum-demand charge worth attacking. Most factories start with the roof and add the other layouts only where the roof runs out or the tariff rewards storage.

Industrial solar system types for a single factory site
System typeWhere it goesWhen it suits a factoryMain trade-off
Rooftop (grid-tied)Production hall, warehouse or office block roofsSound metal-deck or RC roof with most of its warranty left; daytime production loadRoof condition and penetrations decide the design
Solar carportStaff or lorry car parkRoof too small, too old or under a void-if-penetrated warrantySteel canopy adds cost, but staff get shade and the roof is left alone — see solar carport
Ground-mountSpare land inside the factory fenceLarge unused yard and no plans to build on itGives up land the plant may need for expansion
Hybrid solar + battery (BESS)Inverter and battery cabinet beside the main switchroomMedium-voltage bill with a maximum-demand charge, or evening and night shiftsBattery capital cost; sized from half-hourly data, not the monthly bill — see BESS

Who this route is for

This page is for a single operating factory in Malaysia deciding whether — and how — to put rooftop solar on that one site: a plant manager, facility engineer or owner weighing shift-driven savings against a real roof, a real switchboard and a live production line. For the tariff mechanics that apply across a whole medium-voltage manufacturing group, see Industrial Solar Malaysia; for storage sitting behind the same meter, see BESS Malaysia.

If your factory sits in one of these industrial parks, the park guide covers its manufacturing profile and grid context:

How does GITA work for solar in Malaysia in 2026?

Current rules, until 31 December 2026. A company that owns a solar system for its own use can claim GITA Asset at Tier 2: an allowance of 60% of qualifying capital expenditure, set against up to 70% of statutory income. Under the current MGTC guideline the capex must be incurred, the system commissioned and the GITA Asset application received by MGTC by 31 December 2026 — the application can only be filed after commissioning. A system the company does not own does not qualify, because the claimant must own the asset.

From 1 January 2027 — proposed under Budget 2027, subject to legislation. The Budget 2027 tax measures propose extending GITA Asset to purchases verified by MGTC up to 31 December 2030, with two changes that matter for solar: a standalone solar system is no longer listed, and solar integrated with battery storage (BESS or ESS) moves to Tier 1 at 100% of qualifying capital expenditure, still set against up to 70% of statutory income. Companies would have to apply to MGTC within 24 months of purchase. These are announced proposals, not yet gazetted, and MGTC has not published its updated guideline or asset list. How a 2026 purchase verified in 2027 will be treated has not been published either, so plan to commission and apply in 2026. Source: MOF Budget 2027 Tax Measures, Appendix 25.

For a factory, pairing rooftop solar with a battery also targets the maximum-demand charge — see BESS battery storage. The claim mechanics are in the GITA guide for companies.

How TNB charges an operating factory

Under the Non-Domestic Low Voltage tariff (formerly Tariff D), TNB charges a combined energy, capacity and network rate of RM 0.5068/kWh, plus a RM 20.00 monthly retail charge and a 1.6% KWTBB (renewable-energy fund) levy on the total bill — per the TNB Commercial & Industrial Pricing & Tariffs schedule stamped 1 July 2025.

A larger factory drawing power at medium voltage instead sits on a medium-voltage tariff (formerly the E-series industrial tariffs), where a maximum-demand charge (RM per kW of the highest 30-minute demand in the billing month) and, on the time-of-use tariffs, a peak/off-peak energy split are layered onto the same structure — see Industrial Solar Malaysia for how that changes the economics. The Automatic Fuel Adjustment (AFA) on top of both is set monthly and is left out of the figures on this page because it moves independently of the base rate.

How much can rooftop solar save at a factory?

The honest answer is that panel price is not what decides a factory's payback — how much of the generation your line consumes at the moment it is generated is. Solar only produces in daylight, so the question is how much of your load sits in daylight hours. A single day-shift factory draws most of its power while the sun is up and uses almost everything the panels produce; a two- or three-shift factory spreads the same consumption across the evening and night, so at the same solar share of its annual consumption a larger part of midday output exceeds what the line is drawing at that moment and is exported at the lower credit rate.

The worked example below walks through the method — sizing, self-consumption and the resulting saving — for an illustrative two-shift, 200 kWp system on the Non-Domestic Low Voltage tariff, with a side-by-side comparison against a single-shift pattern.

Cutting maximum demand: solar alone vs solar + battery

On a medium-voltage bill the maximum-demand (MD) charge is often the line a plant manager most wants to cut. Since 1 July 2025 TNB charges RM89.27/kW on Medium Voltage General and RM97.06/kW on Medium Voltage Time of Use, where it applies to the highest demand recorded in the weekday peak window (see the medium-voltage tariff guide). The charge is set by the single highest 30-minute average demand in the billing month, so it rewards removing one spike, not trimming consumption in general.

Solar alone rarely moves that number. A cloud passing over the roof during a production peak drops solar output to a fraction within minutes, and that one half-hour sets the month's MD as if the panels were not there. Trexon therefore counts no MD saving for a solar-only design at any shift pattern; the solar saving is on the energy charge. A battery is different: its discharge is controlled, so it can hold grid demand under a target for the length of the peak whatever the weather. The illustrative example below shows the arithmetic for one plant.

Worked example: shaving 200 kW off a 1,000 kW peak on MV General

Illustrative example — labelled assumptions, not a quotation

Recorded monthly MD (illustrative)
1,000 kW
Source: illustrative — a mid-size plant on an 11 kV supply
MD rate
RM89.27/kW (Medium Voltage General)
Source: TNB tariff in force from 1 July 2025, capacity + network charge
Peak to remove
200 kW for up to 2 hours
Source: illustrative — read from half-hourly meter data in a real design
Battery usable energy
400 kWh
Source: shave power × peak duration
  1. MD charge before: 1,000 kW × RM89.27/kW = RM 89,270/month
  2. Solar alone: one cloudy half-hour during the peak sets the MD = no MD saving counted
  3. Solar + battery: MD reduction: 200 kW × RM89.27/kW = RM 17,854/month
  4. Annual MD saving: monthly MD saving × 12 = RM 214,248/year

Illustrative only — not a quotation. It assumes the battery holds the target in every half-hour of every month; if a peak lasts longer than the battery can cover, that month's MD is set anyway. It excludes the energy-charge saving from solar, battery losses, KWTBB and AFA. A real design starts from 12 months of half-hourly data and is modelled before it is quoted — see maximum demand peak shaving.

How much does solar for a factory cost in Malaysia?

Cost is priced per project, not per watt. Each quote is built from 12 months of TNB bills (minimum 6), a roof plan, the single-line diagram and a meter and switchboard photo, because roof structure, cable runs and switchboard work move the price more than panel count. A booking of 20% of the system price, capped at RM20,000 locks in your slot and engineering review and is credited in full against the project. See commercial solar panel cost Malaysia.

Sizing solar from your shifts and your bill

Trexon sizes a factory system from three real inputs: your last twelve months of TNB bills, or an interval load profile where you have one; your shift pattern; and the smaller of your usable roof area or the Solar ATAP maximum-demand ceiling for the site. Multi-tenant premises are not eligible for Solar ATAP (§6.1(d) of the guidelines); single-occupier premises with their own TNB account can apply. Trexon designs around Jinko 620W N-type modules with Solis, Huawei, Sungrow or GoodWe string or hybrid inverters, selected per site. The worked example below shows that method end to end.

Self-consumption sensitivity: one shift vs two shifts, illustrative 200 kWp system
Shift patternSelf-consumption assumptionSelf-consumed energyMonthly saving
One shift (day only)98%20,580 kWhRM 10,430
Two shifts (day + evening)80%16,800 kWhRM 8,514

Model assumption at ~30% solar penetration, no battery (Trexon factory load profiles). A three-shift, 24-hour factory sits lower again — see the shift FAQ below. Real self-consumption depends on your actual production calendar.

Worked example: sizing a 200 kWp system for two-shift production

Illustrative example — labelled assumptions, not a quotation

Illustrative system size
200 kWp
Source: illustrative — a mid-size two-shift factory
Tariff
Non-Domestic Low Voltage (formerly Tariff D), RM 0.5068/kWh
Source: TNB C&I tariff schedule (Non-Domestic Low Voltage)
Generation assumption
105.0 kWh per kWp per month
Source: Trexon yield basis (30 days × 3.5 peak-sun-hours)
Two-shift self-consumption
80%
Source: Trexon two-shift factory load profile, ~30% solar penetration, no battery
  1. Monthly generation: 200 kWp × 105.0 kWh per kWp = 21,000 kWh/month
  2. Self-consumed energy (two shifts): 21,000 kWh × 80% = 16,800 kWh/month
  3. Monthly saving: 16,800 kWh × RM 0.5068/kWh = RM 8,514/month
  4. Annual saving: monthly saving × 12 = RM 102,171/year
  5. Simple payback: Your quoted installed cost ÷ annual saving = quoted cost ÷ RM 102,171 per year

Illustrative only — not a quotation. Excludes the monthly retail charge, KWTBB levy and export credit for any unconsumed generation. Actual self-consumption depends on your real shift pattern, weekday/weekend production and any planned expansion, and the system must still fit inside the Solar ATAP maximum-demand cap for your site (see the FAQ below). Confirmed pricing and payback come from a metered site assessment, not this example.

Roof, switchboard and shutdown planning

The roof carries the project before the panels do. Trexon's assessment records roof material — metal deck, concrete or fibre-cement — its age and remaining warranty, existing penetrations and skylights, and safe maintenance access; a structural sign-off on an older metal-deck roof is a normal, expected step, not a red flag. Where the roof is inadequate, under a manufacturer's void-if-penetrated warranty, or simply too small for the target size, a ground-mount or carport array on spare yard space is the alternative — the trade-off is land use and racking cost against a straightforward, unpenetrated roof.

On the electrical side, the assessment reviews the single-line diagram, the incoming switchboard and available breaker capacity, and the protection settings the inverter has to coordinate with. Connecting a rooftop system safely usually needs one or more planned shutdown windows on the main switchboard — timed around your production calendar, not imposed on it — plus, for the Solar ATAP interconnection, a metering change coordinated with TNB.

Factory roof types: metal deck, Klip-Lok and RC slab

Most Malaysian factories sit under one of three roofs, and each changes how the array is fixed and what the structural engineer has to sign off. A plant built in stages often has two or three of them across different blocks, so the design is done block by block. The Solar ATAP guidelines require the mounting structure to comply with the Registration of Engineers Act 1967.

Factory roof types and what each means for a solar array
RoofHow the array is fixedWhat the engineer checksFactory watch-out
Trapezoidal metal deck (through-fastened)Rails screwed through the sheet into the purlins, every hole sealedPurlin size and spacing, sheet gauge, rust at laps and fixingsOlder halls often need corroded sheets replaced first; plan that into the shutdown calendar
Klip-Lok or other concealed-fix deckClamps that grip the ribs, with no holes through the sheetClamp tested for that exact rib profile; uplift on wide spansKeeps the roof warranty intact; clamps from the wrong profile can slip
Reinforced-concrete (RC) slabBallasted or chemically anchored tilt framesSlab design load against ballast weight; falls to drainsLeave clear paths around rooftop chillers, cooling towers and exhaust fans

Fibre-cement and translucent skylight sheets cannot carry modules; arrays are laid out around them, or that part of the site moves to a carport or ground-mount.

Production continuity and safety coordination

Installation is normally phased by roof zone or by electrical section so the plant keeps running: cabling and racking on one zone while another stays fully operational, with switchboard shutdown windows agreed in advance and kept as short and as few as the design allows. This page does not quote a generic installation timeframe — the phasing plan, and how many shutdown windows it needs, is set from your actual roof size, switchboard layout and production calendar during the assessment, not before it.

Work on and around a live switchboard follows a lock-out/tag-out isolation process, authorised and agreed with your site safety team before any isolation happens, and roof access follows your existing site safety rules alongside the installation crew's own fall-protection procedures. This page does not claim any particular safety certification — ask your assessment engineer for the standards and documentation relevant to your site and industry.

Own, borrow, instalment or hire purchase

A factory can fund rooftop solar in four ways, and in each one the factory owns the system — which is what lets it claim the tax benefits in the next section. Trexon does not offer arrangements where a third party owns the panels on your roof.

Cash or hire purchase. Paying cash gives the full saving from day one. A plant that would rather keep its capex budget for production equipment can use a 2 to 5 years hire-purchase plan from Mitsubishi HC Capital Malaysia Sdn Bhd, arranged by Trexon. The plan is quoted at 3.6–3.95% flat p.a.; because a flat rate is charged on the original amount for the whole term, the true cost is about 6.8–7.4% a year, and that effective figure is the one your finance team should compare with a term loan. The final rate and any deposit come with credit approval, and ownership passes to the factory when the term ends. Hire purchase is open to commercial and industrial customers only.

How factories typically fund a rooftop system
RouteWho owns itUpfrontWho claims GITA/CABest for
Outright purchaseFactory (customer)Full amountFactory (customer)Balance-sheet buyers wanting the full saving and the full tax benefit
Green or bank loanFactory (customer)Depends on the bank's termsFactory (customer)Owners who want the asset now but prefer to repay from the savings it generates
0% card instalment plan (IPP)Factory (customer)Paid over up to 24 months on a participating bank cardFactory (customer)Smaller systems where the owner wants the asset without a bank loan
Hire purchase (2-5 yrs)Factory (customer), outright once the term completesFinanced through Mitsubishi HC Capital at 3.6–3.95% flat p.a. (effective about 6.8–7.4% a year); deposit set at credit approvalFactory (customer)Owners who want the asset and its tax position but would rather not pay in one go — see hire purchase

Tax incentives for factory solar

Solar equipment installed on a factory roof can qualify for the Green Investment Tax Allowance (GITA Asset), subject to MGTC verification — currently an allowance equal to 60% of qualifying capital expenditure on the solar system, which can be offset against up to 70% of the company's statutory income in a year of assessment, under a window that currently runs to 31 December 2026. The system must be commissioned and the GITA Asset application received by MGTC by 31 December 2026. Read the full mechanics in the GITA tax incentive guide.

Separately, solar equipment can also qualify as plant and machinery under the standard capital allowance rules — an Initial Allowance of 20% in the first year of assessment plus an Annual Allowance of 14% in each year after. See the capital allowance guide for how the two interact.

Indicative only. Subject to MGTC verification, applicable tax law and confirmation by the customer’s licensed tax adviser. The system must be commissioned and the GITA Asset application submitted to MGTC by 31 December 2026.

GITA 2027 for manufacturers: why solar + battery matters

For a manufacturer the Budget 2027 proposal changes what is worth planning after this year. If it is legislated as announced, standalone solar drops off the GITA Asset list from 1 January 2027, while solar integrated with a battery moves to Tier 1 at 100% of qualifying capital expenditure for purchases verified by MGTC up to 31 December 2030 — proposed under Budget 2027, subject to legislation, as set out in the GITA section above. That lines the tax up with the engineering: on a medium-voltage plant the battery is also the part that cuts the maximum-demand charge.

In practice: a solar-only project should aim to be commissioned, with its application received by MGTC, by 31 December 2026; a plant that will add storage anyway can design the hybrid inverter and battery space in now. The GITA deadline guide for manufacturers covers the timing in more detail.

Factory solar by industrial park

Each park guide covers the manufacturing mix, the grid context and what that means for a rooftop or hybrid design on a factory in that park:

From project brief to commissioning

The route from brief to a commissioned system, without promising a duration for any stage:

  • Project brief — you send your bill, shift pattern and site details below; Trexon opens your commercial project file and contacts you.
  • Site assessment — an engineer reviews the roof, switchboard, single-line diagram and shutdown constraints; Reserve the project with a booking of 20% of the system price, capped at RM20,000, credited in full to the system price; an engineer then verifies roof, switchboard and access on site, and we confirm whether commissioning and an MGTC application received by 31 December 2026 are achievable for your site before you pay anything further.
  • Engineering and documentation — system design, the Solar ATAP application and TNB interconnection paperwork, and structural sign-off where the roof needs it.
  • Phased installation — racking and cabling by roof zone or electrical section, with switchboard shutdown windows agreed with your team in advance.
  • Commissioning and TNB metering change — testing, hand-over documentation and the export-meter change that brings the system onto Solar ATAP.

Factory solar: a summary for factory managers

Factories operating in Malaysia can install rooftop solar to reduce the monthly TNB bill, subject to the Solar ATAP limits and the factory's production shift pattern. For industrial customers on the Non-Domestic Low Voltage tariff (formerly Tariff D), the combined energy, capacity and network rate is RM 0.5068/kWh, plus a 1.6% KWTBB levy on the total monthly bill — per the TNB tariff schedule stamped 1 July 2025.

The Solar ATAP scheme (GP/ST/No. 60/2025 §8.3 and §8.5) limits a non-domestic solar system to 100% of the site's maximum demand (kWac), with an absolute cap of 1,000 kW per installation. Eligible companies can apply for the Green Investment Tax Allowance (GITA) equal to 60% of qualifying capital expenditure, offset against up to 70% of statutory income for the year of assessment, subject to MGTC verification, under a window that currently runs to 31 December 2026. The system must be commissioned and the GITA Asset application received by MGTC by 31 December 2026.

Trexon Energy, registered with SEDA (registration SEDA-RPVSP-2026/373) under company number 201301044881 (1074704-D), starts projects with a booking of 20% of the system price, capped at RM20,000, credited in full to the system price. Contact our team on WhatsApp for a free quote.

Aerial view of a factory metal roof covered with rows of solar panels and a maintenance walkway
Illustrative: daytime solar charges the battery; the battery covers the evening demand peak.
Diagram of a business rooftop solar system: two PV arrays and string inverters feeding the main switchboard, loads, meter with CT and TNB grid
Illustrative layout of a business rooftop solar system, sized for self-consumption first.

What the first assessment needs

  • 12 months of TNB bills (minimum 6)
  • Roof plan or layout
  • Single-line diagram (SLD)
  • Photo of the TNB meter and main switchboard
  • Shift pattern or operating hours

Credentials

  • Registered PV Service Provider with SEDA: SEDA-RPVSP-2026/373.
  • Registered in Malaysia under company number 201301044881 (1074704-D).
  • Trading as Trexon Energy, a brand of Thither Global (M) Sdn Bhd, incorporated in 2013.
  • Office: G-06-28, Level 6, Block G, Sunway Geo Avenue, Bandar Sunway, 47500 Subang Jaya, Selangor.
  • Hire-purchase partner for commercial and industrial customers: Mitsubishi HC Capital Malaysia Sdn Bhd (2 to 5 years).
  • Equipment designed around: Jinko N-type modules; Solis, Huawei, Sungrow and GoodWe inverters.

Frequently asked questions

What if we run two or three shifts?

Shift pattern changes the economics more than almost anything else on this page. Trexon's model assumes roughly 98% self-consumption for a single day shift, 80% for two shifts, and 70% for continuous three-shift production, all at roughly 30% solar penetration with no battery. A 24-hour plant still benefits from daytime self-consumption and, on a medium-voltage tariff with a maximum-demand charge, if BESS is added, from peak-demand reduction; adding BESS to shift surplus daytime solar into the evening and night shifts is worth modelling for that pattern.

Will installation stop production?

Not for the whole plant — Trexon phases the installation by roof zone or electrical section so most of the plant keeps running throughout. The parts that do need to stop are the switchboard shutdown windows themselves, which are planned around your production calendar and safety procedures in advance rather than imposed on short notice. This page does not quote a generic installation timeframe; how many shutdown windows your project needs, and when, is set during the site assessment from your actual switchboard layout and shift pattern.

Rooftop or ground-mount?

Rooftop is the default when the roof structure, material and remaining warranty can take the load and the penetrations, and the usable area is close to your target system size. Where the roof is undersized, aged, under a void-if-penetrated warranty, or simply unsuitable, a ground-mount or carport array on spare yard space is the alternative — at the cost of extra racking and land use. The site assessment records roof material, age and access, alongside your switchboard and shutdown constraints, before recommending either route.

What is the Solar ATAP cap for a factory?

Solar ATAP (GP/ST/No. 60/2025 §8.3) caps a non-domestic rooftop system at 100% of the site's maximum demand in kWac — the inverter's AC nameplate rating, not the DC panel wattage, so a DC-oversized or battery-buffered design can still fit under a lower kWac rating. There is also a hard cap of 1,000 kW (1 MW) per installation (§8.5). A factory whose maximum demand or ambition exceeds that ceiling needs a design reviewed case by case — see Industrial Solar Malaysia for the medium-voltage sizing conversation.

Which industrial parks does Trexon cover?

Trexon assesses single-site factories across Malaysia, inside or outside a named industrial park. Park-specific guides currently cover Batu Kawan Industrial Park, Kulim Hi-Tech Park, Pasir Gudang Industrial Area, Pulau Indah Industrial Park, Senai Airport City and Shah Alam Seksyen 15 — see the industrial parks overview for the manufacturing profile and grid context of each location.

What is kilang solar?

Kilang solar is the Malay term for solar on a factory roof: a grid-tied rooftop system that supplies the plant's daytime load and exports surplus under Solar ATAP. It is sized from TNB bills and shift pattern, and the company that owns it can claim GITA Asset if the system is commissioned and the application is received by MGTC by 31 December 2026.

Is my factory roof strong enough for solar?

Many metal-deck and concrete factory roofs can carry a rooftop array, but it is confirmed per site, never assumed. The assessment checks roof material, age, purlin spacing, warranty and existing penetrations; an older roof may need a structural engineer's sign-off. Where the roof cannot take the load, a ground-mount or carport array on spare yard space is the alternative.

Can I claim GITA for a factory solar system?

Yes, if your company owns the system for its own use. GITA Asset gives an allowance of 60% of qualifying capital expenditure, set against up to 70% of statutory income, subject to MGTC verification. The capex must be incurred, the system commissioned and the application received by MGTC by 31 December 2026. A company that uses the power but does not own the system cannot claim, because the allowance follows ownership.

Does solar reduce a factory's maximum-demand charge?

Not on its own. The MD charge — RM89.27/kW on Medium Voltage General since 1 July 2025 — is set by the highest 30-minute demand in the month, and one cloudy half-hour during production is enough to set it, so Trexon counts no MD saving for solar alone. A battery controlled to hold demand under a target can cut it; the worked example on this page shows a 200 kW reduction. Low-voltage factories have no MD charge at all.

Can a factory still get GITA for solar after 2026?

Only with storage, if the Budget 2027 proposal becomes law. It would extend GITA Asset to purchases verified by MGTC up to 31 December 2030, drop standalone solar from the list and put solar integrated with BESS or ESS in Tier 1 at 100% of qualifying capex. That is announced, not legislated, and MGTC has not issued its updated list, so a solar-only factory system should be commissioned, with the application received by MGTC, by 31 December 2026.

Can we buy a factory solar system on hire purchase?

Yes. Trexon arranges a 2 to 5 years hire-purchase plan through Mitsubishi HC Capital Malaysia Sdn Bhd for commercial and industrial customers. The quoted rate is 3.6–3.95% flat p.a., which works out at about 6.8–7.4% a year as an effective rate; credit approval sets the final rate and any deposit. The factory owns the system when the term ends, so it claims the capital allowances and GITA itself.

How long does a factory solar installation take?

It depends on things outside the installer's hands — SEDA's processing of the Solar ATAP application, any connection study TNB asks for on a larger system, and equipment lead times — and on how many shutdown windows your production calendar allows. The order does not change: bill and shift review, booking and site verification, engineering and the Solar ATAP filing, procurement, phased installation by roof zone, then TNB testing and the meter change. After the site survey you get a schedule for your plant, including whether commissioning before 31 December 2026 is realistic.

Commercial Solar

Submit the Project Brief

Share the facility, bill/load information and required outcome. The Trexon team will review it and reply with the next steps.

  • Sizing from your 12 months of TNB bills and shift pattern
  • Roof, switchboard and single-line diagram reviewed by our engineers
  • Available incentives (GITA for solar, subject to MGTC verification) and Solar ATAP eligibility checked for your premises
  • SEDA-registered PV Service Provider (RPVSP-2026/373) · SSM 201301044881 (1074704-D)

Prefer to talk first? Message our commercial team on WhatsApp.

WhatsApp Us

Send your project brief

Tell us about the site and we will prepare a factory solar proposal priced per project from your bills.

Mobile or office line