⚡Only 6 slots left for July
Get QuoteDC Fast Charging for Your Condominium
Give your residents a 60-minute full charge instead of 8 hours. Shared DC charging hubs designed for Malaysian strata properties — with JMB approval handled end-to-end.
- Full JMB proposal package — we attend the meeting
- TNB load application handled from start to finish
- Revenue sharing: earn without investing capex
- 8× more cars served per bay vs AC charging
- Serving Mont Kiara, Bangsar South, KLCC and beyond
Why AC Charging Alone Fails Condominiums
7kW AC chargers were a reasonable start. Now that EVs are mainstream, they create more problems than they solve.
8-Hour Overnight Trap
Residents plug in at 7pm, car is ready at 3am. Practical for one car — but what about a second vehicle, a visitor, or a same-day top-up?
Parking Bay Hogging
A 7kW AC charger occupies a bay for 8 hours per session. A 50kW DC charger frees that bay in 60 minutes — serving 8 cars in the same window.
Residents Choosing Elsewhere
47% of Malaysian EV owners say EV charging availability is a deciding factor in where they choose to live. No DC charging = losing premium tenants.
The Trexon DC Hub Difference
A side-by-side comparison for your JMB presentation.
- ✕Charger type7kW AC wall charger
- ✕Charge time7–8 hours
- ✕Cars per bay/day1 car
- ✕Revenue for JMBRM0 / month
- ✕Resident satisfactionFrustration for visitors & second cars
- ✕Property premiumNone — now considered standard
- Charger type50kW–240kW DC shared hub
- Charge time45–60 minutes
- Cars per bay/day8–12 cars
- Revenue for JMBRM3,240–RM19,800 / month
- Resident satisfactionReliable, fast, fair
- Property premiumDifferentiated — reduces vacancies
From Enquiry to Go-Live in 8–12 Weeks
Trexon manages every step. Your JMB just approves and receives income.
Free Site Assessment
Day 1–3We inspect your electrical distribution room, parking layout, cable run distances, and TNB supply capacity. You receive a detailed assessment report within 48 hours — no obligation.
JMB Proposal Package
Week 1–2We prepare a complete proposal for your JMB or MC meeting: technical drawings, load flow report, financial model (with revenue projections), insurance certificate, and draft resolution. We attend the meeting to present if required.
TNB Load Application
Week 3–8We handle the entire TNB supply upgrade process — from load application and SLD submission to inspection coordination. This typically takes 4–8 weeks and is included in your installation package.
Professional Installation
Week 9–10ST-licensed electricians install the charger, cable trays, protection equipment, and signage. Installation typically takes 3–5 days. We minimise disruption to residents and common areas.
Go Live
Week 11–12OCPP backend activated. Billing system live. Residents receive QR codes and app access. JMB receives admin dashboard. Monthly revenue reports start from Day 1.
Choose Your Package
From small boutique condos to large mixed-use developments.
- 1× 50kW DC charger (CCS2 dual gun)
- 2 dedicated parking bays with signage
- TNB load application included
- OCPP cloud management (1 year)
- QR pay + app billing for residents
- 12-month workmanship warranty
- 1× 120kW DC charger (dual gun, power sharing)
- 4 dedicated parking bays
- Dynamic power allocation (4 bays from 1 unit)
- TNB upgrade + OCPP + 2-year maintenance
- Visitor billing + resident RFID cards
- Monthly revenue report dashboard
- Kempower / ABB hub system
- 8 satellite charging bays
- Dynamic power sharing across all 8 bays
- Full turnkey: TNB, civil works, signage, app
- Custom branded charging app (white-label)
- CPO registration by Trexon + MGTC compliance
All prices are estimates. Final pricing depends on site conditions, TNB upgrade requirements, and cable run distances. Contact us for a firm quote after free site assessment.
Your Condo Earns — Without Spending Capex
Under the Revenue Sharing model, Trexon invests the capital. Your JMB earns 40% of all charging revenue — zero risk, zero outlay.
| Metric | Package Starter | Package Standard | Package Premium |
|---|---|---|---|
| Charger capacity | 50kW | 120kW | 240kW |
| Sessions/day (est.) | 6 | 15 | 30 |
| Revenue/session (RM) | RM18 | RM22 | RM22 |
| Monthly gross revenue | RM3,240 | RM9,900 | RM19,800 |
| JMB share (40% rev share) | RM1,296 | RM3,960 | RM7,920 |
| Payback period (own model) | 46 months | 35 months | 35 months |
Revenue based on RM1.50/kWh, average 12kWh per session, 30 days/month. Actual results vary by location and utilisation.
Hardware Sales
You own the charger. Trexon installs and commissions. 100% revenue is yours.
CaaS
Trexon owns and operates. You receive a monthly site access fee. Zero capex.
Revenue Sharing
Split 60/40 (JMB/Trexon). Trexon operates. JMB earns passively.
Full CPO
Trexon operates as licensed CPO. Handles MGTC, billing, 24/7 support.
We Handle JMB from Start to Finish
Understanding strata law can be complex. Trexon has navigated this process for dozens of Malaysian condominiums.
What does the Strata Management Act require?
Under Act 757 (Strata Management Act 2013), any modification to common property — including car park areas — requires written approval from the JMB or MC via a resolution. Trexon provides a fully drafted resolution template, technical drawings, and financial projections to make the approval process seamless.
What does JMB approval involve?
The JMB or MC must pass a resolution at a general meeting. Trexon prepares the full proposal package: site layout drawings, load study report, financial model, insurance certificate, and draft resolution wording. We attend the meeting to present if required. Most approvals take 4–8 weeks.
Common objections and how to address them
The most common objections are: (1) Cost to JMB — addressed by revenue sharing where JMB earns income with zero capex. (2) Disruption during installation — addressed by our 3-5 day installation schedule timed to minimise common area impact. (3) Fairness to non-EV owners — addressed by the fact that charging revenue can offset JMB maintenance fees.
Insurance and liability
Trexon provides a RM5 million public liability insurance certificate covering the charging equipment and installation. The JMB's existing building insurance is not affected. Under the CaaS model, Trexon carries all equipment liability as we own the hardware.
Metering and billing for individual residents
Each charging session is sub-metered via the OCPP backend. Residents receive itemised receipts. The JMB receives a monthly revenue report. There is no co-mingling with the building's common TNB meter — the charger operates on its own dedicated supply and metering.
Need a JMB Presentation Deck?
Trexon provides a ready-made PowerPoint presentation for your AGM or EGM — complete with financials, timeline, and FAQ slides.
Request JMB Deck via WhatsAppWhere We Work in Malaysia
Active installations and active prospects across Greater KL's top condominium clusters.
Don't see your area? Contact us — we serve all of Klang Valley, Johor Bahru, and Penang.
Frequently Asked Questions
Everything your JMB committee needs to know.
How much does it cost to install a DC charger in a condo?
A 50kW Starter installation starts from RM150,000 fully installed (2 bays). A 120kW Standard hub starts from RM350,000 (4 bays). A 240kW Premium hub starts from RM700,000 (8 bays). All pricing includes charger hardware, civil works, TNB supply upgrade, OCPP commissioning, and first-year maintenance.
Do we need JMB approval?
Yes. Under the Strata Management Act 2013, modifications to common property require JMB or MC approval. Trexon prepares a complete proposal package and attends your meeting to present. Most JMBs approve within 4–8 weeks.
Will it increase our TNB bill?
No. The charger operates on a dedicated sub-meter — residents are billed per session. The cost does not appear on your common area TNB bill. Trexon also implements load management to prevent demand charge spikes.
Can residents pay per use?
Yes. Residents pay via QR code, app, or RFID card. Supported methods include TNG eWallet, Visa/Mastercard, and FPX. The JMB sets the tariff. Trexon provides the full billing backend.
What happens during a power outage?
DC chargers automatically disconnect and restart when power is restored. Interrupted sessions are not billed. The OCPP system logs all events. Optional UPS can be added for communications equipment.
How many parking bays are needed?
Starter: 2 bays. Standard: 4 bays. Premium: 8 bays. Bays should ideally be near the electrical distribution room to minimise cable run costs. Trexon identifies optimal placement during the free site assessment.
Is it compatible with all EVs?
Yes. All installations use CCS2 — Malaysia's mandated standard. This covers BYD, Tesla (with adapter), Volvo, BMW, Mercedes, Hyundai, Kia, and all other EVs sold in Malaysia.
Who maintains the charger?
Trexon provides 12 months warranty and maintenance on all installations. Under the CaaS or Revenue Sharing model, Trexon handles all maintenance at no cost to the JMB indefinitely.
Can visitors use the charger?
Yes — visitor access is configurable. The JMB can set different tariffs for visitors vs residents, apply time limits, or restrict to residents-only during peak hours. Visitor charging can be an additional revenue stream.
What is the warranty on the charger hardware?
ABB and Kempower units carry 2-year manufacturer hardware warranty. Trexon adds a 1-year installation and workmanship warranty. Under CaaS and Revenue Sharing, Trexon's operational warranty covers hardware replacement at no cost to the JMB.
Get DC Fast Charging for Your Condominium
Our team prepares the JMB/MC proposal, handles the electrical assessment, and manages the full installation. Contact us for a free consultation.
- Custom system design for your business
- ROI analysis based on your electricity usage
- Flexible financing: PPA, IPP, bank loans
- Solar ATAP, TNB and ST documentation support
Ready to Make Your Condo
EV-Ready?
We'll assess your site, prepare the JMB proposal, and give you a complete financial model — within 48 hours of your enquiry.
Serving Mont Kiara · Bangsar South · KLCC · Damansara · Setia Alam · PJ · Cyberjaya and beyond.