Model your project savings and peak-demand reduction
Calculate ROIDC Fast Charging for Your Condominium
Give your residents an 80% charge in about 45–60 minutes instead of 8 hours. Shared DC charging hubs designed for Malaysian strata properties — with JMB approval handled end-to-end. DC fast charging is a commercial installation: here the JMB or MC installs it as a common-area site on common property, not inside individual homes.
- Full JMB proposal package — we attend the meeting
- TNB load application handled from start to finish
- Charging revenue can offset JMB/MC costs
- 8× more cars served per bay vs AC charging
- We quote condominiums in Mont Kiara, Bangsar South, KLCC and beyond
Why AC Charging Alone Fails Condominiums
7kW AC chargers were a reasonable start. Now that EVs are mainstream, they create more problems than they solve.
8-Hour Overnight Trap
Residents plug in at 7pm, car is ready at 3am. Practical for one car — but what about a second vehicle, a visitor, or a same-day top-up?
Parking Bay Hogging
A 7kW AC charger occupies a bay for 8 hours per session. A 50kW DC charger frees that bay in about 60 minutes — serving 8 cars in the same window.
Residents Choosing Elsewhere
EV owners increasingly look at charging availability when choosing where to live. Without convenient charging, a building can be less attractive to EV-driving tenants and buyers.
The Trexon DC Hub Difference
A side-by-side comparison for your JMB presentation.
- ✕Charger type7kW AC wall charger
- ✕Charge time7–8 hours
- ✕Cars per bay/day1 car
- ✕Revenue for JMBRM0 / month
- ✕Resident satisfactionFrustration for visitors & second cars
- ✕Property premiumNone — now considered standard
- Charger type50kW–240kW DC shared hub
- Charge time45–60 minutes
- Cars per bay/day8–12 cars
- Revenue for JMBkWh × the tariff you set (check current operator rates)
- Resident satisfactionReliable, fast, fair
- Property premiumA charging amenity some residents may value
From Enquiry to Go-Live, Step by Step
Your JMB approves; any charging revenue depends on utilisation and the tariff you set.
RM100 Priority Site Visit
Step 1We inspect the electrical distribution room, parking layout, cable runs and TNB supply capacity. The full RM100 is credited when the project proceeds.
JMB Proposal Package
Step 2We prepare a complete proposal for your JMB or MC meeting: technical drawings, load flow report, financial model (with revenue projections), insurance certificate, and draft resolution. We attend the meeting to present if required.
TNB Load Application
Step 3We handle the entire TNB supply upgrade process — from load application and SLD submission to inspection coordination. The timeline depends on TNB and is confirmed in your proposal; the process is included in your installation package.
Professional Installation
Step 4Electrical work for the charger, cable trays, protection equipment, and signage is done under the ST licence obtained per project where required. Installation days on site depend on the site and are confirmed in the proposal. We minimise disruption to residents and common areas.
Go Live
Step 5OCPP backend activated. Billing system live. Residents receive QR codes and app access. JMB receives admin dashboard. Monthly revenue reports start from Day 1.
Choose Your Package
From small boutique condos to large mixed-use developments.
- 1× 50kW DC charger (CCS2 dual gun)
- 2 dedicated parking bays with signage
- TNB load application included
- OCPP cloud management (1 year)
- QR pay + app billing for residents
- 12-month workmanship warranty
- 1× 120kW DC charger (dual gun, power sharing)
- 4 dedicated parking bays
- Dynamic power allocation (4 bays from 1 unit)
- TNB supply assessment + OCPP; maintenance quoted separately
- Visitor billing + resident RFID cards
- Monthly revenue report dashboard
- Kempower / ABB hub system
- 8 satellite charging bays
- Dynamic power sharing across all 8 bays
- Civil works, signage and app; TNB supply upgrade quoted per site
- Custom branded charging app (white-label)
- MGTC compliance support
All prices are market estimates: DC chargers are not stocked by Trexon and are quoted per site. Final pricing depends on site conditions, TNB upgrade requirements and cable runs. The RM100 priority site visit confirms the on-site scope and is fully credited when the project proceeds.
What a Condo Charging Hub Can Earn
Illustrative revenue for a JMB/MC-owned hub (hardware purchase). Actual results vary by location and utilisation.
| Metric | Package Starter | Package Standard | Package Premium |
|---|---|---|---|
| Charger capacity | 50kW | 120kW | 240kW |
| Sessions/day (est.) | 6 | 15 | 30 |
| Revenue/session | 12 kWh × your tariff | 12 kWh × your tariff | 12 kWh × your tariff |
| Monthly kWh delivered | ~2,160 kWh | ~5,400 kWh | ~10,800 kWh |
| Payback period (JMB-owned) | Modelled per site | Modelled per site | Modelled per site |
Based on an average 12kWh per session, 30 days/month. Revenue = kWh × the tariff you set; check current operator rates. Actual results vary by location and utilisation.
Hardware Sales
You own the charger. Trexon installs and commissions. 100% revenue is yours.
We Handle JMB from Start to Finish
Understanding strata law can be complex. Trexon prepares a complete proposal pack for your JMB or MC.
What does the Strata Management Act require?
Under Act 757 (Strata Management Act 2013), any modification to common property — including car park areas — requires written approval from the JMB or MC via a resolution. Trexon provides a fully drafted resolution template, technical drawings, and financial projections to make the approval process seamless.
What does JMB approval involve?
The JMB or MC must pass a resolution at a general meeting. Trexon prepares the full proposal package: site layout drawings, load study report, financial model, insurance certificate, and draft resolution wording. We attend the meeting to present if required. Most approvals take 4–8 weeks.
Common objections and how to address them
The most common objections are: (1) Cost to JMB — addressed by a JMB/MC-owned hub that earns charging revenue; the payback is modelled in your proposal. (2) Disruption during installation — addressed by an installation schedule planned with the JMB/MC to minimise common area impact. (3) Fairness to non-EV owners — addressed by the fact that charging revenue can offset JMB maintenance fees.
Insurance and liability
Trexon provides a public liability insurance certificate covering the charging equipment and installation (cover details confirmed in the proposal). The JMB's existing building insurance is not affected.
Metering and billing for individual residents
Each charging session is sub-metered via the OCPP backend. Residents receive itemised receipts. The JMB receives a monthly revenue report. There is no co-mingling with the building's common TNB meter — the charger operates on its own dedicated supply and metering.
Need a JMB Presentation Deck?
Trexon provides a ready-made PowerPoint presentation for your AGM or EGM — complete with financials, timeline, and FAQ slides.
Request JMB Deck via WhatsAppAreas We Cover in Greater KL
Condominium clusters across Greater KL where we can prepare a JMB/MC proposal.
Don't see your area? Contact us — we focus on the Klang Valley; other areas on request.
Frequently Asked Questions
Everything your JMB committee needs to know.
How much does it cost to install a DC charger in a condo?
A 50kW Starter installation starts from about RM150,000 (2 bays). A 120kW Standard hub starts from about RM350,000 (4 bays). A 240kW Premium hub starts from about RM700,000 (8 bays). These are market estimates: DC chargers are not stocked by Trexon and are quoted per site, covering charger hardware, civil works and OCPP commissioning; any TNB supply upgrade is assessed and quoted per site.
Do we need JMB approval?
Yes. Under the Strata Management Act 2013, modifications to common property require JMB or MC approval. Trexon prepares a complete proposal package and attends your meeting to present. Approval timing depends on your JMB or MC meeting schedule.
Will it increase our TNB bill?
No. The charger operates on a dedicated sub-meter — residents are billed per session. The cost does not appear on your common area TNB bill. Trexon also implements load management to prevent demand charge spikes.
Can residents pay per use?
Yes. Residents pay via QR code, app, or RFID card. Supported methods include TNG eWallet, Visa/Mastercard, and FPX. The JMB sets the tariff. Trexon provides the full billing backend.
What happens during a power outage?
DC chargers automatically disconnect and restart when power is restored. Interrupted sessions are not billed. The OCPP system logs all events. Optional UPS can be added for communications equipment.
How many parking bays are needed?
Starter: 2 bays. Standard: 4 bays. Premium: 8 bays. Bays should ideally be near the electrical distribution room to minimise cable runs. Trexon confirms placement during the RM100 priority site visit, fully credited when the project proceeds.
Is it compatible with all EVs?
Yes. All installations use CCS2 — Malaysia's mandated standard. This covers BYD, Tesla (with adapter), Volvo, BMW, Mercedes, Hyundai, Kia, and all other EVs sold in Malaysia.
Who maintains the charger?
Trexon provides a 12-month installation and workmanship warranty. Maintenance is quoted separately.
Can visitors use the charger?
Yes — visitor access is configurable. The JMB can set different tariffs for visitors vs residents, apply time limits, or restrict to residents-only during peak hours. Visitor charging can be an additional revenue stream.
What is the warranty on the charger hardware?
ABB and Kempower units (market reference, not stocked by Trexon) carry a manufacturer's hardware warranty, typically 2 years per manufacturer terms. Trexon's own warranty is a 1-year installation and workmanship warranty.
Get DC Fast Charging for Your Condominium
Our team prepares the JMB/MC proposal, handles the electrical assessment, and manages the full installation. Contact us for a free quote.
- Charger and installation scope confirmed from your site details
- Electrical board and parking photos reviewed by our engineers
- SEDA-registered PV Service Provider (RPVSP-2026/373) · SSM 201301044881 (1074704-D)
Ready to Make Your Condo
EV-Ready?
We'll assess your site, prepare the JMB proposal, and give you a complete financial model — after your enquiry.
We quote condominiums in Mont Kiara · Bangsar South · KLCC · Damansara · Setia Alam · PJ · Cyberjaya and beyond.