Skip to main content
Condominium Solution

DC Fast Charging for Your Condominium

Give your residents an 80% charge in about 45–60 minutes instead of 8 hours. Shared DC charging hubs designed for Malaysian strata properties — with JMB approval handled end-to-end. DC fast charging is a commercial installation: here the JMB or MC installs it as a common-area site on common property, not inside individual homes.

45–60 Min
vs 8 Hours AC
JMB
Compliant
Revenue
Generating
The Status Quo Isn't Working

Why AC Charging Alone Fails Condominiums

7kW AC chargers were a reasonable start. Now that EVs are mainstream, they create more problems than they solve.

8-Hour Overnight Trap

Residents plug in at 7pm, car is ready at 3am. Practical for one car — but what about a second vehicle, a visitor, or a same-day top-up?

8 hrs
average AC charge time

Parking Bay Hogging

A 7kW AC charger occupies a bay for 8 hours per session. A 50kW DC charger frees that bay in about 60 minutes — serving 8 cars in the same window.

8×
more cars per bay

Residents Choosing Elsewhere

EV owners increasingly look at charging availability when choosing where to live. Without convenient charging, a building can be less attractive to EV-driving tenants and buyers.

EV
charging is a growing factor when renting/buying

The Trexon DC Hub Difference

A side-by-side comparison for your JMB presentation.

Without DC Fast Charging
  • ✕
    Charger type
    7kW AC wall charger
  • ✕
    Charge time
    7–8 hours
  • ✕
    Cars per bay/day
    1 car
  • ✕
    Revenue for JMB
    RM0 / month
  • ✕
    Resident satisfaction
    Frustration for visitors & second cars
  • ✕
    Property premium
    None — now considered standard
With Trexon DC Hub
  • Charger type
    50kW–240kW DC shared hub
  • Charge time
    45–60 minutes
  • Cars per bay/day
    8–12 cars
  • Revenue for JMB
    kWh × the tariff you set (check current operator rates)
  • Resident satisfaction
    Reliable, fast, fair
  • Property premium
    A charging amenity some residents may value

From Enquiry to Go-Live, Step by Step

Your JMB approves; any charging revenue depends on utilisation and the tariff you set.

01

RM100 Priority Site Visit

Step 1

We inspect the electrical distribution room, parking layout, cable runs and TNB supply capacity. The full RM100 is credited when the project proceeds.

02

JMB Proposal Package

Step 2

We prepare a complete proposal for your JMB or MC meeting: technical drawings, load flow report, financial model (with revenue projections), insurance certificate, and draft resolution. We attend the meeting to present if required.

03

TNB Load Application

Step 3

We handle the entire TNB supply upgrade process — from load application and SLD submission to inspection coordination. The timeline depends on TNB and is confirmed in your proposal; the process is included in your installation package.

04

Professional Installation

Step 4

Electrical work for the charger, cable trays, protection equipment, and signage is done under the ST licence obtained per project where required. Installation days on site depend on the site and are confirmed in the proposal. We minimise disruption to residents and common areas.

05

Go Live

Step 5

OCPP backend activated. Billing system live. Residents receive QR codes and app access. JMB receives admin dashboard. Monthly revenue reports start from Day 1.

Three Tiers for Every Condo

Choose Your Package

From small boutique condos to large mixed-use developments.

Starter2 Bays
50kW
Small condos (100–300 units)
From ~RM150,000
market estimate · not stocked, quoted per site
  • 1× 50kW DC charger (CCS2 dual gun)
  • 2 dedicated parking bays with signage
  • TNB load application included
  • OCPP cloud management (1 year)
  • QR pay + app billing for residents
  • 12-month workmanship warranty
6 sessions/day
Sessions/day
~2,160 kWh
Est. kWh/month
Modelled in proposal
Payback
Get Starter Quote
Standard4 Bays
120kW
Medium condos (300–800 units)
From ~RM350,000
market estimate · not stocked, quoted per site
  • 1× 120kW DC charger (dual gun, power sharing)
  • 4 dedicated parking bays
  • Dynamic power allocation (4 bays from 1 unit)
  • TNB supply assessment + OCPP; maintenance quoted separately
  • Visitor billing + resident RFID cards
  • Monthly revenue report dashboard
15 sessions/day
Sessions/day
~5,400 kWh
Est. kWh/month
Modelled in proposal
Payback
Get Standard Quote
Premium8 Bays
240kW Hub
Large condos (800+ units), mixed-use
From ~RM700,000
market estimate · not stocked, quoted per site
  • Kempower / ABB hub system
  • 8 satellite charging bays
  • Dynamic power sharing across all 8 bays
  • Civil works, signage and app; TNB supply upgrade quoted per site
  • Custom branded charging app (white-label)
  • MGTC compliance support
30 sessions/day
Sessions/day
~10,800 kWh
Est. kWh/month
Modelled in proposal
Payback
Get Premium Quote

All prices are market estimates: DC chargers are not stocked by Trexon and are quoted per site. Final pricing depends on site conditions, TNB upgrade requirements and cable runs. The RM100 priority site visit confirms the on-site scope and is fully credited when the project proceeds.

Revenue Projections

What a Condo Charging Hub Can Earn

Illustrative revenue for a JMB/MC-owned hub (hardware purchase). Actual results vary by location and utilisation.

Metric
Package
Starter
Package
Standard
Package
Premium
Charger capacity50kW120kW240kW
Sessions/day (est.)61530
Revenue/session12 kWh × your tariff12 kWh × your tariff12 kWh × your tariff
Monthly kWh delivered~2,160 kWh~5,400 kWh~10,800 kWh
Payback period (JMB-owned)Modelled per siteModelled per siteModelled per site

Based on an average 12kWh per session, 30 days/month. Revenue = kWh × the tariff you set; check current operator rates. Actual results vary by location and utilisation.

Hardware Sales

You own the charger. Trexon installs and commissions. 100% revenue is yours.

JMB Compliance Guide

We Handle JMB from Start to Finish

Understanding strata law can be complex. Trexon prepares a complete proposal pack for your JMB or MC.

What does the Strata Management Act require?

Under Act 757 (Strata Management Act 2013), any modification to common property — including car park areas — requires written approval from the JMB or MC via a resolution. Trexon provides a fully drafted resolution template, technical drawings, and financial projections to make the approval process seamless.

What does JMB approval involve?

The JMB or MC must pass a resolution at a general meeting. Trexon prepares the full proposal package: site layout drawings, load study report, financial model, insurance certificate, and draft resolution wording. We attend the meeting to present if required. Most approvals take 4–8 weeks.

Common objections and how to address them

The most common objections are: (1) Cost to JMB — addressed by a JMB/MC-owned hub that earns charging revenue; the payback is modelled in your proposal. (2) Disruption during installation — addressed by an installation schedule planned with the JMB/MC to minimise common area impact. (3) Fairness to non-EV owners — addressed by the fact that charging revenue can offset JMB maintenance fees.

Insurance and liability

Trexon provides a public liability insurance certificate covering the charging equipment and installation (cover details confirmed in the proposal). The JMB's existing building insurance is not affected.

Metering and billing for individual residents

Each charging session is sub-metered via the OCPP backend. Residents receive itemised receipts. The JMB receives a monthly revenue report. There is no co-mingling with the building's common TNB meter — the charger operates on its own dedicated supply and metering.

Need a JMB Presentation Deck?

Trexon provides a ready-made PowerPoint presentation for your AGM or EGM — complete with financials, timeline, and FAQ slides.

Request JMB Deck via WhatsApp

Areas We Cover in Greater KL

Condominium clusters across Greater KL where we can prepare a JMB/MC proposal.

Mont Kiara
Greater KL
Bangsar South
Greater KL
KLCC / Bukit Bintang
Greater KL
Damansara Heights
Greater KL
Setia Alam
Greater KL
Tropicana / PJ
Greater KL
Desa ParkCity
Greater KL
Cyberjaya
Greater KL

Don't see your area? Contact us — we focus on the Klang Valley; other areas on request.

Frequently Asked Questions

Everything your JMB committee needs to know.

How much does it cost to install a DC charger in a condo?

A 50kW Starter installation starts from about RM150,000 (2 bays). A 120kW Standard hub starts from about RM350,000 (4 bays). A 240kW Premium hub starts from about RM700,000 (8 bays). These are market estimates: DC chargers are not stocked by Trexon and are quoted per site, covering charger hardware, civil works and OCPP commissioning; any TNB supply upgrade is assessed and quoted per site.

Do we need JMB approval?

Yes. Under the Strata Management Act 2013, modifications to common property require JMB or MC approval. Trexon prepares a complete proposal package and attends your meeting to present. Approval timing depends on your JMB or MC meeting schedule.

Will it increase our TNB bill?

No. The charger operates on a dedicated sub-meter — residents are billed per session. The cost does not appear on your common area TNB bill. Trexon also implements load management to prevent demand charge spikes.

Can residents pay per use?

Yes. Residents pay via QR code, app, or RFID card. Supported methods include TNG eWallet, Visa/Mastercard, and FPX. The JMB sets the tariff. Trexon provides the full billing backend.

What happens during a power outage?

DC chargers automatically disconnect and restart when power is restored. Interrupted sessions are not billed. The OCPP system logs all events. Optional UPS can be added for communications equipment.

How many parking bays are needed?

Starter: 2 bays. Standard: 4 bays. Premium: 8 bays. Bays should ideally be near the electrical distribution room to minimise cable runs. Trexon confirms placement during the RM100 priority site visit, fully credited when the project proceeds.

Is it compatible with all EVs?

Yes. All installations use CCS2 — Malaysia's mandated standard. This covers BYD, Tesla (with adapter), Volvo, BMW, Mercedes, Hyundai, Kia, and all other EVs sold in Malaysia.

Who maintains the charger?

Trexon provides a 12-month installation and workmanship warranty. Maintenance is quoted separately.

Can visitors use the charger?

Yes — visitor access is configurable. The JMB can set different tariffs for visitors vs residents, apply time limits, or restrict to residents-only during peak hours. Visitor charging can be an additional revenue stream.

What is the warranty on the charger hardware?

ABB and Kempower units (market reference, not stocked by Trexon) carry a manufacturer's hardware warranty, typically 2 years per manufacturer terms. Trexon's own warranty is a 1-year installation and workmanship warranty.

Commercial Solar

Get DC Fast Charging for Your Condominium

Our team prepares the JMB/MC proposal, handles the electrical assessment, and manages the full installation. Contact us for a free quote.

  • Charger and installation scope confirmed from your site details
  • Electrical board and parking photos reviewed by our engineers
  • SEDA-registered PV Service Provider (RPVSP-2026/373) · SSM 201301044881 (1074704-D)

Send your project brief

Tell us about the site and we will prepare an EV charging proposal priced per project from your bills.

Mobile or office line

You can also upload these in your dashboard after submitting, or send them on WhatsApp.

By submitting you agree to be contacted about this project.

RM100 Priority Site Visit — Fully Credited

Ready to Make Your Condo
EV-Ready?

We'll assess your site, prepare the JMB proposal, and give you a complete financial model — after your enquiry.

We quote condominiums in Mont Kiara · Bangsar South · KLCC · Damansara · Setia Alam · PJ · Cyberjaya and beyond.

Written
Assessment Report
ST
Licence per project
JMB
Proposal Included
OCPP
2.0.1 Compliant