Skip to main content
Office & Corporate Charging

DC Fast Charging
for Office Buildings

Two compelling use cases, one installation. Employees plug in at lunch and leave with a full charge. Company fleet vehicles — BYD, Tesla, BMW — are always ready at 9am. And your ESG team gets quantified, reportable data on every kWh delivered.

DC fast chargers for offices are not stocked by Trexon and are quoted per site. GITA Tier 1 (100% allowance) applies to qualifying expenditure, subject to MGTC eligibility and approval.

30 min
Lunch break = full commute top-up
100%
GITA Tier 1 allowance on qualifying capex
Per site
DC chargers not stocked; quoted per site
BYD + Tesla
CCS2 universal connector standard

Two Use Cases. One Installation.

Office DC charging serves both daily employee needs and company fleet requirements — from the same hub, managed through the charger supplier's management system.

Lunchtime Top-Up

Employee Benefit

A 60kW DC charger delivers about 150–200 km of range in 30 minutes. Employees plug in at 1pm and leave at 2pm with a charged car. It's a daily quality-of-life benefit that costs the company nothing if employees pay at cost — or a high-impact perk if subsidised.

  • 30-min lunch break = full commute top-up
  • Company can charge at cost or subsidise
  • RFID / app-based session management
  • Usage reporting per employee
BYD, Tesla Company Cars

Company Fleet

Malaysian corporates are rapidly transitioning fleets to BYD Atto 3, Tesla Model 3, and other EVs. A dedicated DC charging hub in the office car park means fleet vehicles are always ready — no range anxiety, no ad-hoc public charging costs.

  • CCS2 universal connector (BYD, Tesla, Volvo, BMW, Mercedes)
  • Fleet account management and billing
  • Dynamic load balancing for multiple simultaneous vehicles
  • Integration with fleet management software
ESG + Sustainability

Scope 2 Emissions, GBI Credits,
and Bursa Sustainability Reporting

EV charging infrastructure is no longer just a convenience. For Bursa-listed companies, GLCs, and multinationals with Net Zero commitments, it's a measurable ESG deliverable.

Scope 2 Emissions Reduction

Transitioning company fleet to EVs and providing renewable-source charging directly reduces Scope 2 emissions. Critical for companies with Net Zero commitments or Bursa sustainability reporting requirements.

GBI Green Building Credits

EV charging contributes to Green Building Index (GBI) credits under the Transport category. Can contribute to GBI credits, subject to the current criteria; certification is handled by your green-building consultant.

LEED Sustainable Sites

EV charging infrastructure earns LEED credits under the Alternative Transportation subcategory within Sustainable Sites. Certification is handled by your LEED consultant; Trexon does not provide GBI/LEED consultancy.

ESG Annual Report

Quantified data on kWh delivered, CO2 equivalent avoided, and employee charging sessions — ready to include in your sustainability report and Bursa ESG disclosures.

Scope 2 Reduction
Measurable CO2e avoided per kWh
GBI Transport Category
Can contribute to GBI credits (current criteria apply)
Bursa ESG Report Ready
Monthly kWh + CO2e data export

Office DC Charging Packages

Two configurations — sized for SME offices and large corporate campuses. Market estimates include hardware and civil works; any TNB supply upgrade is quoted per site.

2-Bay

Office Starter

Power per bay60kW per bay
Total capacity120kW total
Charge timeAbout 150–200 km range in 30 min
Best forSME offices, co-working spaces, 100–300 employee companies
  • 2× 60kW DC charger (CCS2)
  • Employee RFID card system
  • OCPP 1.6J cloud management
  • TNB supply upgrade coordination
  • Usage reporting and billing dashboard
  • 12-month on-site warranty
From ~RM150,000 (market estimate)
Modelled per site
Get This Package Quote
4-Bay

Office Premier

Power per bay120kW per bay (dual-gun)
Total capacity480kW total
Charge timeTesla Model 3 to 80% in about 35 min (at 120kW)
Best forLarge corporates, GLCs, tech campuses, 300+ employees with EV fleet
  • 4× 120kW DC charger (dual-gun CCS2)
  • Fleet management integration
  • Dynamic load balancing (avoid TNB demand charge spikes)
  • OCPP 2.0.1 with smart charging profiles
  • Employee + visitor self-service via app/QR
  • Monthly utilisation reports + ROI summary
  • Priority maintenance scheduling
From ~RM350,000 (market estimate)
Modelled per site
Get This Package Quote

Prices are indicative. Final pricing is subject to TNB requirements and the RM100 priority site visit, fully credited when the project proceeds. Prices are market estimates: DC chargers are not stocked by Trexon and are quoted per site. Contact us for a site-specific model.

GITA Tier 1 (100% Allowance): The Investment Case

Under Malaysia's Green Investment Tax Allowance, qualifying DC charger installations generate an allowance of 100% of qualifying capex (Tier 1) — set off against up to 70% of your company's statutory income.

How GITA Works for Your Company

  1. 1.Company invests RM350,000 in a 4-bay DC charger hub (illustrative)
  2. 2.Commission the hub, then submit the GITA Asset application to MGTC (MyHIJAU) by 31 Dec 2026
  3. 3.100% of RM350,000 (RM350K) qualifies as an allowance, subject to MGTC verification
  4. 4.The allowance is set off against up to 70% of statutory income; any balance carries forward
  5. 5.Effective after-tax cost of RM350K hub: ~RM266,000 if the allowance is fully absorbed (24% corp tax rate)

After-Tax ROI Model (4-Bay Hub)

Installed costRM350,000
GITA 100% allowance (corp tax 24%, if fully absorbed)– RM84,000
Net after-tax costRM266,000
Monthly charging revenueModelled per site
Payback periodModelled in your proposal

Tax benefit calculation is illustrative. Consult your tax adviser for company-specific modelling.

Applied Through MGTC

GITA Asset is applied for through MGTC (MyHIJAU), not MIDA. The allowance belongs to the company that owns the chargers; confirm the tax treatment with your tax adviser.

RM2,500 Employee Relief

Employees get RM2,500 personal tax relief for home EV equipment. Complements your workplace charging benefit.

GITA Guidance Included

Trexon includes GITA guidance with every corporate quote.

Target Segments

DC charging in offices is being driven by ESG commitments, fleet electrification, and the competitive pressure to attract and retain talent who drive EVs.

GLCs & Government Agencies

Examples: Head offices and campuses of GLCs and agencies
Driver: ESG mandates, public accountability, fleet electrification targets

Multinational Technology Companies

Examples: Regional and Malaysian offices of tech MNCs
Driver: Global sustainability commitments, competitive talent market

Banks & Financial Services

Examples: Bank head offices and operations centres
Driver: Climate risk disclosure, ESG reporting, green branch initiatives

Professional Services

Examples: Big Four firms, legal firms, consulting companies
Driver: Premium office positioning, senior staff EV ownership rate

Co-working Spaces

Examples: Flexible and serviced office operators
Driver: Premium amenity to attract corporate tenants willing to pay higher rent

Industrial Parks & Business Parks

Examples: Business parks with shared parking
Driver: Shared amenity for multiple tenants, central charging hub model

Malaysian Corporate Fleet EV Compatibility

CCS2 is Malaysia's universal DC standard. All modern EVs support it. Your hub charges every vehicle in your fleet.

ModelRangeMax DC60kW Hub Time
BYD Atto 3420km80kW DC maxAbout 45 min
BYD Seal570km150kW DC maxAbout 60 min
Tesla Model 3 RWD513km170kW DC maxAbout 40 min
BMW iX630km200kW DC maxAbout 50 min
Volvo EX30340km130kW DC maxAbout 45 min
Mercedes EQA426km100kW DC maxAbout 45 min

Estimated times for a 10-80% charge at 60kW hub output, from approximate usable battery capacity and ignoring taper. Actual times vary by battery condition and ambient temperature. CCS2 connector standard on all models listed.

Frequently Asked Questions

Common questions from facility managers, ESG teams, and fleet managers considering DC charging for office buildings.

How much does a DC fast charger for an office building cost in Malaysia?▼
A 2-bay 60kW DC charger installation for office buildings starts at about RM150,000 fully installed. A 4-bay 120kW hub costs approximately RM350,000. These are market estimates; DC chargers are not stocked by Trexon and are quoted per site. Market estimates cover hardware, civil works and OCPP commissioning, with a 12-month warranty; any TNB supply upgrade is quoted per site. GITA Asset Tier 1 gives an allowance of 100% of qualifying capex, set off against up to 70% of statutory income.
Can office EV charging qualify for GBI or LEED green building certification?▼
Yes. EV charging infrastructure contributes directly to Green Building Index (GBI) credits under the Transport category, and to LEED credits under Sustainable Sites (SS) for Alternative Transportation. Certification submissions are handled by your green-building consultant; Trexon does not provide GBI/LEED consultancy.
What is GITA and how does it apply to office EV charging?▼
GITA (Green Investment Tax Allowance) provides, for qualifying EV charging systems (Tier 1), an allowance of 100% of qualifying capital expenditure, set off against up to 70% of statutory income. Companies that install DC chargers for employees or visitors can claim it if the system is commissioned and the application submitted to MGTC by 31 December 2026.
How does lunchtime DC charging work for employees?▼
A 60kW DC charger delivers approximately 150–200 km of range per 30-minute session — enough to top up for the commute home. Employees plug in at 1pm and return to a charged car at 2pm. The company can charge employees at cost (RM0.50/kWh pass-through), subsidise it as a benefit, or monetise it at RM1.20–1.50/kWh.
Which companies in Malaysia are deploying office EV charging?▼
Interest is strongest among government-linked companies (GLCs), technology multinationals, banks and professional services firms with ESG commitments, and among co-working operators looking for a premium amenity to attract corporate tenants.
Commercial Solar

Install DC Charging at Your Office Building

Get a free quote. The optional RM100 priority site visit is fully credited when the project proceeds.

  • Charger and installation scope confirmed from your site details
  • Electrical board and parking photos reviewed by our engineers
  • SEDA-registered PV Service Provider (RPVSP-2026/373) · SSM 201301044881 (1074704-D)

Send your project brief

Tell us about the site and we will prepare an EV charging proposal priced per project from your bills.

Mobile or office line

You can also upload these in your dashboard after submitting, or send them on WhatsApp.

By submitting you agree to be contacted about this project.

Install DC Charging at Your Office

Trexon starts with a free quote. The RM100 priority site visit confirms the property scope and is fully credited when the project proceeds.

We coordinate the TNB application, civil works and OCPP commissioning, with DC hardware selected and quoted per project (not stocked by Trexon). Your facility team still submits the GITA application and collects the tax benefit.