Skip to main content

Stock availability: All EV charger models are subject to stock availability. If your selected model is currently out of stock, our team will recommend an equivalent alternative from the same performance tier and price range.

Skip to main content

Only 6 slots left for July

Get Quote
Office & Corporate Charging

DC Fast Charging
for Office Buildings

Two compelling use cases, one installation. Employees plug in at lunch and leave with a full charge. Company fleet vehicles — BYD, Tesla, BMW — are always ready at 9am. And your ESG team gets quantified, reportable data on every kWh delivered.

Trexon installs DC fast charging hubs for offices, corporate campuses, and business parks across Malaysia — with GITA 100% ITA eligibility and full GBI/LEED certification support.

30 min
Lunch break = full commute top-up
100% ITA
GITA allowance on qualifying capex
GBI + LEED
Green building certification credits
BYD + Tesla
CCS2 universal connector standard

Two Use Cases. One Installation.

Office DC charging serves both daily employee needs and company fleet requirements — from the same hub, managed through a single platform.

Lunchtime Top-Up

Employee Benefit

A 60kW DC charger delivers 40–50km of range in 30 minutes. Employees plug in at 1pm and leave at 2pm with a charged car. It's a daily quality-of-life benefit that costs the company nothing if employees pay at cost — or a high-impact perk if subsidised.

  • 30-min lunch break = full commute top-up
  • Company can charge at cost or subsidise
  • RFID / app-based session management
  • Usage reporting per employee
BYD, Tesla Company Cars

Company Fleet

Malaysian corporates are rapidly transitioning fleets to BYD Atto 3, Tesla Model 3, and other EVs. A dedicated DC charging hub in the office car park means fleet vehicles are always ready — no range anxiety, no ad-hoc public charging costs.

  • CCS2 universal connector (BYD, Tesla, Volvo, BMW, Mercedes)
  • Fleet account management and billing
  • Dynamic load balancing for multiple simultaneous vehicles
  • Integration with fleet management software
ESG + Sustainability

Scope 2 Emissions, GBI Credits,
and Bursa Sustainability Reporting

EV charging infrastructure is no longer just a convenience. For Bursa-listed companies, GLCs, and multinationals with Net Zero commitments, it's a measurable ESG deliverable.

Scope 2 Emissions Reduction

Transitioning company fleet to EVs and providing renewable-source charging directly reduces Scope 2 emissions. Critical for companies with Net Zero commitments or Bursa sustainability reporting requirements.

GBI Green Building Credits

EV charging contributes to Green Building Index (GBI) credits under the Transport category. Required for GBI certification renewal and new GBI applications. Documentation provided.

LEED Sustainable Sites

EV charging infrastructure earns LEED credits under the Alternative Transportation subcategory within Sustainable Sites. Trexon provides LEED-compatible technical documentation.

ESG Annual Report

Quantified data on kWh delivered, CO2 equivalent avoided, and employee charging sessions — ready to include in your sustainability report and Bursa ESG disclosures.

Scope 2 Reduction
Measurable CO2e avoided per kWh
GBI Transport Category
Mandatory credits for certification
Bursa ESG Report Ready
Monthly kWh + CO2e data export

Office DC Charging Packages

Two configurations — sized for SME offices and large corporate campuses. All pricing fully installed, including civil works and TNB upgrade.

2-Bay

Office Starter

Power per bay60kW per bay
Total capacity120kW total
Charge time40–50km range in 30 min
Best forSME offices, co-working spaces, 100–300 employee companies
  • 2× 60kW DC charger (CCS2)
  • Employee RFID card system
  • OCPP 1.6J cloud management
  • TNB supply upgrade coordination
  • Usage reporting and billing dashboard
  • 12-month on-site warranty
From RM250,000
~RM8,000–RM12,000/mo
Get This Package Quote
Most Popular
4-Bay

Office Premier

Power per bay120kW per bay (dual-gun)
Total capacity480kW total
Charge timeTesla Model 3 to 80% in 25 min
Best forLarge corporates, GLCs, tech campuses, 300+ employees with EV fleet
  • 4× 120kW DC charger (dual-gun CCS2)
  • Fleet management integration
  • Dynamic load balancing (avoid TNB demand charge spikes)
  • OCPP 2.0.1 with smart charging profiles
  • Employee + visitor self-service via app/QR
  • Monthly utilisation reports + ROI dashboard
  • Priority maintenance SLA (4-hour response)
From RM500,000
~RM22,000–RM35,000/mo
Get This Package Quote

Prices are indicative. Final pricing subject to site survey and TNB assessment. Revenue projections at 50% utilisation, RM1.20/kWh employee rate. Contact us for a site-specific model.

GITA 100% ITA — The Investment Case

Under Malaysia's Green Investment Tax Allowance, qualifying DC charger installations generate a 100% Investment Tax Allowance for 5 years — applied against your company's statutory income.

How GITA Works for Your Company

  1. 1.Company invests RM500,000 in a 4-bay DC charger hub
  2. 2.Apply for GITA under the Green Technology Tax Incentive programme
  3. 3.100% of RM500,000 (RM500K) qualifies as Investment Tax Allowance
  4. 4.ITA offsets against statutory income over up to 5 years
  5. 5.Effective after-tax cost of RM500K hub: ~RM375,000 (25% corp tax rate)

After-Tax ROI Model (4-Bay Hub)

Installed costRM500,000
GITA 100% ITA (corp tax 25%)– RM125,000
Net after-tax costRM375,000
Monthly charging revenueRM22,000–RM35,000
Adjusted payback period11–17 months

Tax benefit calculation is illustrative. Consult your tax adviser for company-specific modelling.

70% Income Tax Exemption

For green technology service companies operating EV charging networks as a CPO service. Valid 3 years.

RM2,500 Employee Relief

Employees get RM2,500 personal tax relief for home EV equipment. Complements your workplace charging benefit.

GITA Assessment Included

Trexon includes a GITA eligibility assessment and filing guidance with every corporate quote.

Which Companies Are Installing

DC charging in offices is being driven by ESG commitments, fleet electrification, and the competitive pressure to attract and retain talent who drive EVs.

GLCs & Government Agencies

Examples: Petronas, TNB, Khazanah, KWAP, EPF
Driver: ESG mandates, public accountability, fleet electrification targets

Multinational Technology Companies

Examples: Microsoft, Google, Intel, HP, Dell Malaysia
Driver: Global sustainability commitments, competitive talent market

Banks & Financial Services

Examples: Maybank, CIMB, RHB, HSBC Malaysia, Standard Chartered
Driver: Climate risk disclosure, ESG reporting, green branch initiatives

Professional Services

Examples: Big Four firms, legal firms, consulting companies
Driver: Premium office positioning, senior staff EV ownership rate

Co-working Spaces

Examples: WeWork, Colony, Common Ground, Regus
Driver: Premium amenity to attract corporate tenants willing to pay higher rent

Industrial Parks & Business Parks

Examples: Horizon Hills, i-City, Cyberjaya, Medini
Driver: Shared amenity for multiple tenants, central charging hub model

Malaysian Corporate Fleet EV Compatibility

CCS2 is Malaysia's universal DC standard. All modern EVs support it. Your hub charges every vehicle in your fleet.

ModelRangeMax DC60kW Hub Time
BYD Atto 3420km80kW DC max60% in 30 min
BYD Seal570km150kW DC max80% in 26 min
Tesla Model 3 RWD513km170kW DC max80% in 25 min
BMW iX630km200kW DC max80% in 35 min
Volvo EX30340km130kW DC max80% in 26 min
Mercedes EQA426km100kW DC max80% in 30 min

Charge times at 60kW hub output, to 80% SoC. Actual times vary by battery condition and ambient temperature. CCS2 connector standard on all models listed.

Frequently Asked Questions

Common questions from facility managers, ESG teams, and fleet managers considering DC charging for office buildings.

How much does a DC fast charger for an office building cost in Malaysia?
A 2-bay 60kW DC charger installation for office buildings starts at RM250,000 fully installed. A 4-bay 120kW hub costs approximately RM500,000. Pricing includes hardware, civil works, TNB supply upgrade, OCPP commissioning, and 12-month warranty. GITA 100% ITA means qualifying companies can offset the full investment against tax.
Can office EV charging qualify for GBI or LEED green building certification?
Yes. EV charging infrastructure contributes directly to Green Building Index (GBI) credits under the Transport category, and to LEED credits under Sustainable Sites (SS) for Alternative Transportation. Trexon provides the technical documentation required for certification submissions.
What is GITA and how does it apply to office EV charging?
GITA (Green Investment Tax Allowance) provides 100% Investment Tax Allowance on qualifying green technology capital expenditure for 5 years. Companies that install DC chargers as a Charge Point Operator (CPO) service for employees or visitors can apply this allowance against their taxable income, effectively making the installation pre-tax.
How does lunchtime DC charging work for employees?
A 60kW DC charger delivers approximately 40–50km of range per 30-minute session — enough to top up for the commute home. Employees plug in at 1pm and return to a charged car at 2pm. The company can charge employees at cost (RM0.50/kWh pass-through), subsidise it as a benefit, or monetise it at RM1.20–1.50/kWh.
Which companies in Malaysia are deploying office EV charging?
Government-linked companies (GLCs), technology multinationals, and professional services firms are leading adoption. Shell, Petronas, TNB, and major banks have deployed or are deploying employee EV charging as part of their ESG commitments. Co-working spaces like WeWork and Colony are also installing chargers as a premium amenity to attract corporate tenants.
Commercial Solar

Install DC Charging at Your Office Building

Get a free GITA eligibility check, financial model, and site assessment within 48 hours. We handle everything from TNB application to ongoing maintenance.

  • Custom system design for your business
  • ROI analysis based on your electricity usage
  • Flexible financing: PPA, IPP, bank loans
  • Solar ATAP, TNB and ST documentation support

Request a Quote

Fill in your details and our B2B team will contact you within 15 minutes

🛡️ 14-day satisfaction guarantee • Your data is secure

Install DC Charging at Your Office

Trexon delivers a full site assessment, GITA eligibility check, financial model, and GBI/LEED documentation plan within 48 hours.

We handle everything: TNB application, civil works, OCPP commissioning, ESG data reporting, and ongoing maintenance. Your facility team does nothing — except submit the GITA application and collect the tax benefit.