Model your project savings and peak-demand reduction
Calculate ROIDC Fast Chargers
for Malaysia
50kW to 360kW commercial EV charging. Charge a capable EV to 80% in about 15–60 minutes, depending on charger power. DC hardware (ABB, Kempower, Autel and others) is selected and quoted per project; not stocked by Trexon. CCS2 universal connector.
DC Charger Product Tiers
From single-bay 50kW units to 360kW flagship hubs — matched to your location and revenue target. Brands shown are market references; Trexon does not stock DC hardware, which is quoted per project.
50kW Standard
- Best forSmall malls, condos, hotels
- BrandsABB Terra 54, Delta DC Wallbox
- BYD Atto 3 in 60 min
- Quoted per site (bay count and supply upgrade vary)
- ~4,500 kWh/mo at ~3 h/day full power
120kW Dual-Gun
- Best forShopping malls, corporate offices
- BrandsABB Terra 124, Kempower Satellite
- Tesla Model 3 in 25 min
- Quoted per site (bay count and supply upgrade vary)
- ~10,800 kWh/mo at ~3 h/day full power
180kW Ultra-Fast
- Best forHighway R&Rs, petrol stations
- BrandsABB Terra 184, Autel MaxiCharger
- Capable EVs to 80% in about 20 min
- Quoted per site (bay count and supply upgrade vary)
- ~16,200 kWh/mo at ~3 h/day full power
240kW–360kW Flagship Hub
- Best forMajor malls, airports, fleet depots
- BrandsKempower Hub, ABB Terra 360, Autel DH480
- 15–20 min to 80%
- Quoted per site (bay count and supply upgrade vary)
- Custom — contact for ROI model
Commercial Locations We Serve
DC fast charging solutions for every commercial property type.
Condominiums
Shared common-area DC hub installed by the JMB/MC, for residents & visitors
Shopping Malls
Anchor amenity driving dwell time & spend
Hotels
Guest charging as premium marketing asset
Office Buildings
Employee benefit + fleet charging
Petrol Stations
Future-proof your forecourt with fast DC
Highway R&Rs
High-throughput corridor charging hubs
Airports
Multi-bay flagship hubs for long-stay parking
Industrial Parks
Fleet depot charging for logistics operators
Ownership Model
You own the charger. Trexon selects the DC hardware per project (not stocked by Trexon), then installs and commissions it.
Hardware Sales
You purchase and own the charger outright. Trexon installs, commissions, and hands over. You operate under your preferred CSMS or CPO network.
ROI by Charger Type
Energy delivered at about 3 hours a day of full-power charging (≈12% utilisation, 30 days a month). Revenue = kWh × the tariff you set; check current operator rates. Installed costs are market estimates; DC chargers are not stocked by Trexon and are quoted per site.
| Charger | Installed Cost | Monthly kWh delivered (≈3 h/day full power; revenue = kWh × your tariff) |
|---|---|---|
| 50kW | Quoted per site | ~4,500 kWh |
| 120kW | Quoted per site | ~10,800 kWh |
| 180kW | Quoted per site | ~16,200 kWh |
Throughput estimates only; revenue is kWh × the tariff you set (check current operator rates), before electricity and operating costs, and is not a payback forecast. Actual throughput depends on location and utilisation. Contact us for a site-specific financial model.
GITA + Tax Incentives
Significant government support for DC charger investments.
100% Allowance under GITA (Tier 1)
GITA Asset, Tier 1: an allowance of 100% of qualifying EV charging capex, set off against up to 70% of statutory income. Commission and submit to MGTC by 31 Dec 2026.
Applied Through MGTC
GITA Asset is applied for through MGTC (MyHIJAU), not MIDA. The allowance belongs to the company that owns the chargers; confirm the tax treatment with your tax adviser.
RM2,500 Personal Tax Relief (EV owners)
Individual EV owners can claim up to RM2,500 for their own EV charging equipment (not for a company-owned DC charger). Extended to YA 2027.
Ask us for GITA guidance when you request a quote.
DC Fast Charger FAQ
Common questions about DC fast charger investment in Malaysia.
Ready to Install DC Fast Charging?
Start with a free quote. Book the RM500 commercial site survey when on-site verification is required; the RM500 is credited in full when the project proceeds.