Build your solar plan — no payment until you approve
Configure solarSolar Panel Malaysia 2026 — From RM15,999
A Fully Digital Solar Platform in Malaysia
Trexon Energy is a SEDA-registered solar company in Malaysia delivering residential and commercial solar panel installations from Selangor to Sarawak. Solar ATAP application handled for you, so you can cut your TNB bill.
Free remote quote · No site visit needed · SEDA-registered installer
Why Go Solar in Malaysia 2026?
Malaysia's equatorial sun gives about 3.5 equivalent peak sun hours a day on our Peninsular model. Combined with TNB's RP4 tariff and government incentives, most homes pay back a solar system in about 3–10 years.
Cut Your TNB Bill by About 70% (RP4 Basis Example)
Solar panels offset your daytime TNB consumption directly. Homeowners with RM200–1,000 bills save about RM140–760/month, depending on usage. Businesses cut a large share of their energy costs with systems sized to your actual load profile.
Solar ATAP Credit
Under Malaysia's Solar ATAP scheme, excess solar energy exported to TNB earns RM0.2703/kWh credit (residential), credited against your Energy Charge. Unused credit is forfeited at the end of each billing period, so size for self-use.
GITA 60% Tax Allowance
Malaysian businesses qualify for Green Investment Tax Allowance (GITA): 60% of qualifying capital expenditure offset against statutory income. A RM100,000 solar system generates a RM60,000 tax allowance for Sdn Bhd companies, set off against up to 70% of statutory income.
Less Exposure to Tariff Changes
Every kWh your panels produce is a kWh you do not buy from TNB, so future tariff and AFA changes affect a smaller part of your bill.
Solar Panel Malaysia Price List 2026
All prices are for fully installed systems including Tier-1 solar panels, Solis string inverter (hybrid or battery upgrade quoted separately), mounting structure, DC/AC wiring, earthing, SEDA Solar ATAP application, and TNB interconnection fees.
* Prices are indicative. Savings and payback match our bill pages and use the Solis price. Final price is confirmed in your written quote and may vary by roof type, system complexity, and location.
Solar Solutions for Every Property Type in Malaysia
Whether you own a terrace house in Petaling Jaya, a factory in Shah Alam, or a warehouse in Port Klang — Trexon Energy has a solar solution engineered for your specific property type and energy needs.
Residential Solar
Homes, bungalows, semi-D, terrace houses across Malaysia
Learn moreCommercial Solar
Offices, retail outlets, shophouses, SMEs
Learn moreFactory / Industrial
Manufacturing plants, large-scale EPCC contracts
Learn moreWarehouse Solar
Logistics, cold storage, distribution centres
Learn moreOff-Grid Systems
Remote sites, farms, islands, rural areas without TNB access
Learn moreAgrivoltaics
Dual-use solar on agricultural land — earn from farming and solar
Learn moreHow Solar Installation Works in Malaysia
From booking to TNB commissioning, the entire process usually takes about 6–10 weeks. Trexon Energy manages every step — you simply approve and enjoy the savings.
Free Quote from Your Bill
Send your TNB bill and roof photos. Our engineers review roof orientation, shading, structural conditions and the electrical scope for your written quote.
Custom System Design (AI-Powered)
An engineering simulation generates a rooftop layout, energy-yield forecast and ROI projection after the required site inputs are verified.
TNB & SEDA Application
We handle all paperwork: SEDA Solar ATAP application, TNB interconnection approval, and any local authority permits. You don't need to visit any government office.
Professional Installation (1–2 Days)
Our installation crew completes the on-site installation in 1–2 days with minimal disruption. All work meets TNB wiring regulations and IEC/SIRIM standards.
Commissioning & Solar ATAP Activation
System testing, TNB bidirectional meter installation, Solar ATAP activation, and full handover training. Your solar is live, grid-connected, and earning Solar ATAP credits from day one.
Solar Panel Brands in Malaysia: What Trexon Installs
Trexon installs Jinko Tiger Neo 620 W N-type panels with a 30-year performance warranty. The other Tier-1 brands below are market references only: available on request, not stocked by Trexon.
Jinko Solar
Tiger Neo 620W
Installed by Trexon
LONGi Solar
Hi-MO 7 Series
Market reference, not stocked

Trina Solar
Vertex S+ 625W
Market reference, not stocked
Canadian Solar
HiKu7 CS7N
Market reference, not stocked
Solar Financing Options in Malaysia
Going solar in Malaysia starts with a RM2,000 booking, not the full system price. Multiple flexible financing options are available — from green bank loans to OKAPI rent-to-own.
Bank Green Loans
Maybank, CIMB, RHB, BSN
Green financing products from major Malaysian banks — rates and tenure are set by each bank. Suitable for larger residential and commercial solar systems.
Learn moreOKAPI Rent-to-Own
7 or 10 years, you own it at the end
Start with a RM2,000 booking, then pay OKAPI monthly. Insurance and warranty included; maintenance cover as set out in your OKAPI agreement. Approval requires positive cashflow.
Learn moreSolar Company in Malaysia — We Cover 20+ Cities
As a trusted solar company in Malaysia, Trexon Energy operates across Peninsular Malaysia, Sabah, and Sarawak. Our installation teams deliver quality workmanship, with East Malaysia handled through local partners.
Frequently Asked Questions — Solar Panel Malaysia
Everything you need to know about solar panels in Malaysia — pricing, installation, Solar ATAP, warranties, and how to get started with Trexon Energy.
How much do solar panels cost in Malaysia?
Solar panel systems in Malaysia start from RM15,999 for a 5.58 kWp system and reach about RM26,999 for a 12.40 kWp system with a Solis inverter. A popular 6.20 kWp residential package (sized for a RM400 TNB bill) costs RM16,999 fully installed. This includes panels, inverter, mounting structure, wiring, and all SEDA/TNB application fees. Get a free personalised quote at trexon.my/calculator.
Is solar worth it in Malaysia?
Yes for most homes. On our Peninsular model of about 3.5 equivalent peak sun hours a day, homeowners with RM200–RM1,000 bills achieve payback in about 3–10 years, and the panels carry a 30-year performance warranty. Under Solar ATAP, any excess power exported to TNB earns RM0.2703/kWh credit. Businesses additionally qualify for the GITA 60% tax allowance on qualifying capital expenditure.
How long does solar installation take in Malaysia?
On-site installation is completed in 1–2 days. The full process — from booking to TNB commissioning — typically takes about 6–10 weeks. Key milestones include the Solar ATAP application, TNB metering change and system commissioning. Trexon handles the paperwork and authority coordination.
What is Solar ATAP?
Solar ATAP is Malaysia's current government solar scheme, managed by SEDA. It replaced NEM (Net Energy Metering), which closed to new applications at the end of June 2025. Solar owners export excess energy to TNB at RM0.2703/kWh (residential), credited against the Energy Charge rather than netted against consumption. Solar ATAP capacity limits: domestic 5 kWac single-phase / 15 kWac three-phase (larger systems need a TNB Connection Confirmation Check, RM1,000); non-domestic capped at 100% of the site's maximum demand (MD) in kWac, with a ceiling of 1,000 kWac.
How much can I save with solar panels in Malaysia?
Typical monthly savings: RM200 TNB bill — about RM143/mo with 5.58 kWp; RM300 bill — about RM184/mo with 5.58 kWp; RM400 bill — about RM230/mo with 6.20 kWp; RM500 bill — about RM291/mo with 7.44 kWp; RM800 bill — about RM418/mo with 11.16 kWp; RM1,000 bill — about RM610/mo with 11.78 kWp. Estimate: 3.5 sun-hours, export credited at 27.03 sen for 10 years, excl. AFA. Business savings depend on tariff, load profile and how much output is used on site; we model them from 12 months of your bills. Use our free calculator at trexon.my/calculator for a personalised estimate.
Do I need planning permission for solar panels in Malaysia?
Most residential solar installations (below 72kW) in Malaysia do not require separate local authority planning permission (e.g., MBPJ, MPAJ, DBKL). You need: (1) SEDA approval for the Solar ATAP scheme, (2) TNB approval for grid connection. For large commercial/industrial systems above 72kW, additional permits from Suruhanjaya Tenaga may apply. Trexon Energy handles all regulatory approvals.
What warranty do solar panels have in Malaysia?
Quality solar panels installed by Trexon Energy carry: 30-year linear power output warranty (at least 87.4% of rated output at year 30 under the Jinko warranty terms); 12-year panel product warranty; 10-year inverter warranty; 5-year workmanship warranty on installation. All panels are Tier-1 rated by Bloomberg New Energy Finance.
How do I apply for solar in Malaysia?
Getting solar with Trexon Energy is simple: (1) Get a free remote quote; (2) Send your bill and roof photos (no site visit is needed to quote); (3) Receive the reviewed custom design and quotation; (4) Choose financing; (5) Sign the agreement while we handle SEDA and TNB applications; (6) Installation in 1–2 days on site; (7) TNB grid connection and Solar ATAP activation.
Still have questions? Our solar advisors are ready to help.
Solar Panel Malaysia — In-Depth Guides
Detailed articles on solar panel pricing, installation, Solar ATAP applications, and brand comparisons for the Malaysian market.
Solar Panel Price Malaysia — Complete Cost Breakdown 2026
Detailed breakdown of what you pay for: panels, inverter, mounting, installation labour, permits, and hidden costs explained.
Panduan BMHarga Solar Panel Malaysia 2026 — Panduan Lengkap
Panduan lengkap harga solar panel Malaysia 2026 termasuk kos pemasangan, ROI, dan insentif kerajaan terkini.
Solar ATAP GuideCara Mohon Solar ATAP Malaysia 2026
Step-by-step guide to applying for Solar ATAP in Malaysia: SEDA application, requirements, and timeline.
Brand ReviewBest Solar Panel Brand in Malaysia 2026 — Jinko vs LONGi vs Trina
Comparison of Tier-1 solar panel brands available in Malaysia with performance data, warranties, and price-per-watt analysis.
InstallationSolar Panel Installation Process Malaysia — 6–10 Week Timeline
Complete step-by-step guide to the solar installation process from site survey to TNB grid connection in Malaysia.
Government SchemeSolar ATAP Malaysia — Complete Guide 2026
Everything about Malaysia's current solar export scheme — quotas, tariffs, eligibility, and how Solar ATAP replaced the old NEM 3.0 programme.
Ready to Go Solar in Malaysia?
Switch to solar energy with Trexon Energy. Get your free, no-obligation quote today.
SEDA-registered · Solar ATAP support · Free quote from your bill · 5-year workmanship warranty
Thither Global (M) Sdn Bhd (Trexon Energy)
Sunway Geo Avenue, Bandar Sunway, 47500 Selangor · energy@trexon.my · +60 12-770 7249
Written by Chandra Rau, CEO · Trexon Energy
Explore More Solar Resources
Solar Pricing Malaysia 2026
Detailed price list for all system sizes
Solar Savings Calculator
Calculate your exact monthly savings
Financing Options
Card 0% instalments, bank loans, rent-to-own
Solar ATAP Guide
Complete guide to Malaysia's solar export scheme
Residential Solar
Solar for homes and landed properties
Commercial Solar
Solar for offices, retail, and SMEs
Factory Solar
Industrial-scale solar EPCC
EV Chargers
Pair solar with EV charging
Solar Locations
Coverage across all Malaysian states
Solar Price Guide 2026
Full cost breakdown article
Cara Mohon Solar ATAP
Panduan lengkap permohonan Solar ATAP
Harga Solar Panel Malaysia 2026
Panduan harga terlengkap
Trust & Quality Assurance
Does Trexon handle Solar ATAP and TNB paperwork?
Yes. Trexon prepares the Solar ATAP, TNB, ST, and grid-connection documentation needed for your project. Residential systems use Tier-1 panels with a Solis, Huawei, Sungrow or GoodWe inverter ecosystem.
What warranty does Trexon provide?
We provide a comprehensive warranty package: 30-year performance warranty on solar panels (at least 87.4% of rated output at year 30 under the Jinko warranty terms), 12-year panel product warranty, 10-year inverter warranty, and 5-year workmanship warranty on installation.
What happens if my solar system underperforms?
If output drops, check the monitoring app (Solis Value uses SolisCloud and Huawei Premium uses FusionSolar) and contact Trexon support; workmanship and equipment warranties apply. Trexon commissions the selected platform and provides the monitoring scope stated in the accepted proposal.