Skip to main content
Skip to main content

Build your solar plan — no payment until you approve

Configure solar
Effective Jan 1, 2026

Solar ATAP 2026

The Solar Accelerated Transition Action Programme (GP/ST/No. 60/2025). Effective 1 January 2026 — replaces NEM 3.0 with self-consumption priority and export credits at Energy Charge / SMP rates.

Residential Solar ATAP rebate

Suria Rebate Malaysia 2026: RM3,000 for eligible homes

PETRA's SuRIA Home incentive is linked to eligible domestic Solar ATAP projects, with RM600 per kWac capped at RM3,000 while quota remains available.

Check Suria Rebate

Self-Consumption First

The primary goal is to reduce your own demand. Generate electricity during the day to power your home or business directly.

Export Credits

Excess energy is exported to the TNB grid. You earn credits based on the prevailing Energy Charge or SMP rates.

10-Year Contract

Secure your energy future with a fixed 10-year connection agreement, ensuring long-term stability and ROI.

Program Comparison

Understanding the differences between NEM 3.0 (closed) and Solar ATAP 2026 is crucial for maximizing your return — especially the no-carry-forward credit rule that makes system sizing critical.

Feature
NEM 3.0 (Old)
Solar ATAP 2026
Verdict
Programme Basis
Net Energy Metering 3.0
Solar Accelerated Transition Action Programme (GP/ST/No. 60/2025)
ATAP is the official successor
Domestic Credit Rate
Energy Charge Rate
Energy Charge Rate (same principle)
Similar for domestic
Non-Domestic Credit Rate
Energy Charge Rate (fixed)
Average SMP (market-linked, lower)
NEM was better for B2B exports
Credit Validity
Rolls over monthly (12-month cycle)
FORFEITED if unused — no rollover
ATAP requires precise sizing + BESS
Contract Period
10 Years
Max 10 Years from Commencement Date
Same long-term security
Quota / Availability
450 MW cap — CLOSED
No national quota — OPEN
ATAP is accessible now
Installation Types
Rooftop only
Rooftop, solar carparks, covered walkways (same compound)
ATAP is more flexible
Multi-tenant
Not eligible
NOT eligible
Both exclude condos/apartments

Check Your Eligibility

The Solar ATAP program has strict entry requirements to ensure grid stability and fair access. Use our official checker to verify your status before applying.

Eligibility Checker

Step 1 of 3

Do you have an active TNB account?

Calculate Potential

Estimate your financial returns based on the ATAP credit mechanism. Note that unlike the old NEM, credits are forfeited if not used within the billing cycle.

Benefit Calculator

Monthly Bill (Average)RM 300
Suggested System Size6 kWp

Max 15kW for Domestic (3-Phase)

Monthly Savings (Est)
RM 300
Payback Period
5.8 Years
Est. System Cost
RM 21,000

*Includes installation & equipment. Excludes fees.

Capacity Options

System sizes are strictly regulated based on your voltage connection level. See our full pricing guide to compare packages by system size.

Most Common

Low Voltage (LV)

< 72 kW
Study: Simplified Check
Fee: Free

For most residential and small commercial properties (230V/400V).

Medium Voltage (MV)

425 kW
Study: PSS Report
Fee: RM 10,000+

For factories and large facilities (11kV/33kV).

High Voltage (HV)

Up to 1 MW
Study: Grid Impact Study
Fee: RM 50,000+

For maximizing roof potential on large industrial sites.

Application Journey

From eligibility check to commissioning, we handle the entire SEDA & TNB workflow.

1

Eligibility Check

1 Day

Verify your account status and load profile.

2

System Design

3-5 Days

Engineer optimal capacity to prevent forfeiture.

3

e-ATAP Submission

2 Weeks

Submit technical drawings to SEDA/TNB.

4

Installation & COD

1-2 Weeks

Construction and meter change.

Why Partner With Us?

Zero-Loss Sizing

We analyze your 12-month load profile to ensure 100% self-consumption, preventing credit forfeiture.

SEDA Registered

Official RPVSP license holder authorized to handle e-ATAP submissions.

Tier-1 Equipment

Huawei & Longi systems with 25-year performance warranties included.

Full Turnkey

We handle the technical studies (PSS/GIS) required for larger ATAP installations.

Common Questions

If you are on NEM 3.0, you must wait for your contract to expire before applying for Solar ATAP. You cannot have two active programmes simultaneously.

Ready to Transition?

Secure your position in the 2026 quota. Trexon Energy provides full turnkey service from SEDA application to TNB commissioning.

Commercial Solar

Apply for Solar ATAP Programme

Tell us about your property and we'll guide you through Solar ATAP application.

  • Custom system design for your business
  • ROI analysis based on your electricity usage
  • Flexible financing: PPA, IPP, bank loans
  • Solar ATAP, TNB and ST documentation support

Request a Quote

Fill in your details and our B2B team will review your request during business hours

🛡️ 14-day satisfaction guarantee • Your data is secure