Guides5 min read

Does Your Solar System Need CCC Approval? Usually Not

TE
Trexon Energy Team
Solar Advisory
1 September 2026
Trexon Energy Team profile photo - Solar Advisory
Trexon Energy Team · Solar Advisory1 September 2026

This question comes up once a customer starts reading the paperwork, and the honest answer is reassuring: for a normal domestic rooftop system, CCC approval does not apply to you at all.

Where the line actually sits

Under Solar ATAP §8.1 your inverter capacity is capped by your supply phase — 5 kWac on single phase, 15 kWac on three phase. CCC approval, and its RM1,000 fee, applies only when you exceed that ceiling.

Being at the ceiling is not exceeding it. A 7.44 kWp system runs a 5 kWac inverter, which is exactly the single-phase limit — so it needs no CCC approval, no RM1,000, and no additional wait. The same holds for a three-phase system up to 15 kWac.

Your systemInverterCCC needed?
5.58 – 7.44 kWp, single phase5 kWacNo
8.06 – 19.84 kWp, three phase8 – 15 kWacNo
Anything above your phase ceiling>5 or >15 kWacYes, + RM1,000

What your installation does involve

No CCC does not mean no paperwork — it means the paperwork is ours, not an extra hurdle for you. A standard residential job runs through:

  • SEDA registration under Solar ATAP, with the required building drawings. §7.1 requires panels to be roof-mounted on a building within your premise.
  • The Solar ATAP application to TNB, submitted by us.
  • A bi-directional meter change by TNB where one is needed, so import and export are measured separately.
  • Commissioning, after which TNB issues your Solar ATAP welcome letter.

We handle the SEDA submission and the ATAP application as part of the installation.

Two things we will not guess at

We would rather say this plainly than publish a number that turns out to be wrong for your premise.

The TNB charge for a bi-directional meter is set by TNB, and whether it falls inside a given installer's quoted price varies. Ask us and we will confirm it for your account rather than estimate it.

The cost of upgrading single phase to three phase is quoted by TNB per premise and depends on your existing supply and the distance to the nearest three-phase source. Ten customers have asked us; we do not publish a figure because we do not have one we can stand behind for every case.

Confusing CCC with something else

"CCC" also stands for Certificate of Completion and Compliance in Malaysian building law, which is about occupying a building and has nothing to do with your solar system. If a contractor mentions CCC in a solar context, ask which one they mean — in ours it is the TNB capacity approval described above.

The one-line answer

If your system sits at or below your supply's kWac ceiling — which nearly every domestic rooftop system does — there is no CCC approval, no RM1,000, and no extra wait. If you are being told otherwise for a standard house, ask which capacity limit is being exceeded and why.

Related Resources

  • Single phase or three phase?
  • How Solar ATAP works
  • Book a site visit

See your exact savings

Get a personalized solar proposal in 60 seconds — free, no obligation.

Calculate SavingsWhatsApp Us
Tags
#CCC Approval#TNB#Solar ATAP#SEDA#Compliance
Share Article:
TE
Trexon Energy Team
Solar Advisory
Solar Energy Expert

Related Articles

Keep reading — more solar insights for Malaysian homeowners

Browse All Articles
Guides

Solar Panel Installation Process 2026: A Step-by-Step Guide

From the first site visit to switching on the power. We demystify the 4-8 week timeline involving SEDA, TNB, and technical commissioning.

7 min readRead article
Guides

Single Phase or Three Phase? The One Thing That Caps Your Solar System

More customers ask us this than any other question. Your supply phase sets a legal ceiling on system size before roof space or budget matter at all: 5 kWac on single phase, 15 kWac on three phase. Here is how to check which you have, and what it costs you.

7 min readRead article
Guides

The Installation Journey 2026: From Site Visit to Solar ATAP Activation

A transparent look at the timeline. Why does it take 4-8 weeks? Understanding the SEDA and TNB approval bottlenecks.

5 min readRead article
Guides

Understanding Your TNB Bill 2026: Pre and Post Solar

Confused by 'Export' and 'Import' readings? We teach you how to read your TNB bill after installing solar to verify your savings.

6 min readRead article
Browse All Articles

Ready to Start
Saving with Solar?

Get a free personalized quote and discover how much you could save with solar energy for your home or business.

Calculate Your SavingsTalk to an Expert
Free 60-Second Quote

Get your solar savings estimate in 60 seconds

Malaysia's most accurate calculator. No phone number required. Save up to 90% on your TNB bill.

Get Instant QuoteChat on WhatsApp
Trexon Energy logo

Malaysia's SEDA-licensed solar partner since 2020. We design, finance, and install residential, commercial, industrial, and off-grid solar systems.

Registered Office

Thither Global (M) Sdn Bhdtrading as Trexon Energy

G-06-28, Level 6, Block G, Sunway Geo Avenue
Jalan Lagoon Selatan, 47500 Subang Jaya
Selangor, Malaysia

SSM: 201301044881 (1074704-D)

SEDA Licence: SEDA-RPVSP-2026/373

Sales & Support

+60 12-770 7249

WhatsApp Business

+6012-770-7249

Email us

energy@trexon.my

Service Coverage

Peninsular Malaysia, Sabah & Sarawak

Solutions

  • Residential Solar
  • Commercial SolarB2B
  • Industrial Solar
  • Factory SolarGITA
  • Off-Grid Systems
  • Battery Storage
  • BESS for BusinessNew
  • SME Solar
  • CRESSNew
  • Industrial Parks
  • C&I Solar Hub
  • Peak Shaving
  • EV Charging
  • Solar Water PumpsAgri
  • Replace Your GensetNew
  • Strata / JMB SolarNew
  • Data Center SolarNew
  • EV Charging-as-a-ServiceZero Capex
  • Singapore Cross-BorderSG
  • Hospital SolarNew
  • School Solar
  • Telco Tower Solar
  • REIT Portfolio

Services

  • Remote TNB Bill AuditFree
  • Solar Monitoring
  • NEM Application
  • GITA Tax FilingCFO
  • Solar Inspection
  • Energy AuditC&I
  • Sustainability ReportingESG
  • Solar InsuranceNew
  • Singapore Consulting
  • O&M Services
  • All Services

Coverage

  • Solar Kuala Lumpur
  • Solar Selangor
  • Solar Petaling Jaya
  • Solar Shah Alam
  • Solar Penang
  • Solar Johor Bahru
  • Solar Ipoh & Perak
  • Solar Melaka
  • Solar Sarawak
  • All 20+ Locations20+

For Business

  • Submit RFP (5 Min)Free
  • Commercial ROI Calculator
  • PPA (Zero Upfront)
  • IPP Projects
  • Utility-Scale (LSS/CGPP)
  • Industries We Serve
  • Storage, Tracker & BIPV Products
  • Developer APIAPI
  • GITA 60% Tax GuideCFO
  • TNB MD Charge Guide
  • Commercial Case Studies

Tools & Resources

  • Solar ConfiguratorFree
  • Bill Analyzer
  • Priority Site VisitRM100 Credit
  • Diesel vs Solar CalcNew
  • Solar Panel Price 2026
  • Solar Buyer Guides
  • Solar Blog
  • Case Studies
  • Solar ATAP (NEM) Guide
  • FAQ

Company

  • About Trexon Energy
  • Why Choose Trexon
  • Our Team
  • CareersHiring
  • InternshipsOpen
  • Press & Media
  • Investors
  • Installer Partners
  • Referral ProgramRM500
  • Contact Sales

Support & Legal

  • Customer Portal
  • Track My Installation
  • 25-Year Panel Warranty
  • Panel Cleaning
  • O&M Services
  • Sitemap
  • Privacy Policy
  • Terms of Service
  • Refund Policy
SEDA
RPVSP licensed
TNB
Solar ATAP ready
Tier-1
Panels & inverters
RM0
Upfront options
25-yr
Panel warranty
SEDA RPVSP Licensed(SEDA-RPVSP-2026/373)
TNB Solar ATAP Certified
SIRIM Certified Products
ISO 9001:2015
MPIA Member

© 2026 Thither Global (M) Sdn Bhd (201301044881). Trading as Trexon Energy. All rights reserved.

PrivacyTermsRefund PolicySitemap|Protected by reCAPTCHA (Privacy & Terms)
MalaysiaMade with ♥ in Subang Jaya