Skip to main content
Skip to main content

Build your solar plan — no payment until you approve

Configure solar
Residential rooftop solar installation in Malaysia
Trexon SuRIA Guarantee covered bookings paid by 15 Nov 2026 only. Later bookings are not covered.
Suria Rebate announced by PETRA on May 22, 2026

Suria Rebate Malaysia 2026: secure the RM3,000 solar rebate path.

Get RM600 per kWac, capped at RM3,000, if eligible. Install deadline now March 2027 for approved applications; new approvals close 31 Dec 2026.

Rebate rate
RM600 / kWac
Paid up to 5 kWac for a maximum RM3,000 rebate.
Opening date
1 Jun 2026
First-come, first-served basis from 1 June; new approvals close on 31 December 2026.
Approvals close · install deadline
31 Dec 2026 · March 2027
New approvals close on 31 December 2026. Approved applications have until March 2027 to complete the installation.

Premium Solar Equipment Partners

Huawei Partner
Jinko Solar Partner
Sungrow Partner
Trina Solar Partner
Canadian Solar Partner

Supported Solar Financing Banks

Maybank Logo
CIMB Logo
RHB Logo
Public Bank Logo
Hong Leong Logo
Affin Bank Logo
Alliance Bank Logo
AmBank Logo
UOB Logo
New SuRIA approvals close 31 Dec 2026A 5 kWac eligible system reaches the RM3,000 cap. PETRA warns that any party misusing the application may be blacklisted.

Announcement decoded

Approvals close 31 Dec 2026 · install by March 2027 if approved

Suria Rebate rewards completed Solar ATAP residential systems, not just interest. The winning path is to finish eligibility screening, site assessment, quotation, application preparation and installation planning before new approvals close. Trexon is capping this booking path to homeowners ready to act now, not six months from now.

Trexon solar panel installation on a premium residential roof in Malaysia

What PETRA announced

The Suria Rebate, officially announced as SuRIA Home, is linked to Solar ATAP and gives RM600 per kWac up to RM3,000 for eligible domestic users.

Why speed matters

The programme started June 1, 2026 and is first-come, first-served. The government has extended the SuRIA installation deadline to March 2027 for approved applications. New approvals still close on 31 December 2026, and approval is the government's decision, not ours.

Allocation note

Reported total allocation figures differ between media reports and are not confirmed by an official PETRA or TNB statement. The quota, rebate rate, eligibility and deadline are the facts to act on now.

Rebate mechanics

RM600 per kWac, capped at RM3,000.

Suria Rebate rewards system capacity up to 5 kWac. The rebate does not replace monthly bill savings, Solar ATAP bill credits, or your project financing. It is a one-time incentive layered on top of the solar economics.

CapacityRebate
1 kWacRM600Small starter systems
2 kWacRM1,200Lower bill households
3 kWacRM1,800Common terrace-home entry size
4 kWacRM2,400Mid-sized residential roof
5 kWac or moreRM3,000 capMaximum Suria Rebate payout

Solar ATAP Domestic Journey Path

A simple breakdown of how Trexon manages your application, site design, TNB registration, and commissioning.

Official Solar ATAP domestic journey map by Trexon
Isometric illustration of a Malaysian link house with rooftop solar, a wall inverter, a home battery and an EV charger
Illustration of a Malaysian home with rooftop solar.
Diagram of a home solar system on-grid under Solar ATAP: PV array, DC isolator, string inverter, AC protection, home loads, TNB smart meter and grid
Home solar on-grid under Solar ATAP: the home uses solar power first, and surplus is exported through the TNB smart meter.

Best-selling Trexon packages

10 package starting points: 5 solar-only and 5 solar + battery.

The Suria Rebate is capped at RM3,000, but the right system size still depends on your bill, roof and whether you want battery backup. This grid follows the same package design and inverter picker used on Trexon's main packages page, then sends the selected bundle into the booking form.

5 Solar-only packages

For homeowners focused on the Suria Rebate, Solar ATAP credits and monthly bill reduction.

5 packages
Solar Only

Solar Starter

Perfect for smaller homes

6.82 kWp · 11 panels
Jinko 620W N-Type solar panel
11 x Jinko 620W N-Type
Solis S6-GR1P5K-S String Inverter
S6-GR1P5K-S
30-yr panel warranty

From · Solis inverter

RM 17,499

or RM 729/mo · 0% over 24 months

Monthly saving

RM 210

Payback

6.9 yrs

Popular
Solar Only

Solar Plus

Most popular for average homes

8.68 kWp · 14 panels
Jinko 620W N-Type solar panel
14 x Jinko 620W N-Type
Solis S5-GR3P8K String Inverter
S5-GR3P8K
30-yr panel warranty

From · Solis inverter

RM 21,999

or RM 917/mo · 0% over 24 months

Monthly saving

RM 320

Payback

5.7 yrs

Best Value
Solar Only

Solar Pro

Maximum savings for larger homes

10.54 kWp · 17 panels
Jinko 620W N-Type solar panel
17 x Jinko 620W N-Type
Solis S5-GR3P10K String Inverter
S5-GR3P10K
30-yr panel warranty

From · Solis inverter

RM 24,499

or RM 1,021/mo · 0% over 24 months

Monthly saving

RM 400

Payback

5.1 yrs

Solar Only

Solar Max

High-capacity solar for large homes

12.4 kWp · 20 panels
Jinko 620W N-Type solar panel
20 x Jinko 620W N-Type
Solis S5-GR3P10K String Inverter
S5-GR3P10K
30-yr panel warranty

From · Solis inverter

RM 26,999

or RM 1,125/mo · 0% over 24 months

Monthly saving

RM 470

Payback

4.8 yrs

Solar Only

Solar Mega

Extra power for high-usage households

14.88 kWp · 24 panels
Jinko 620W N-Type solar panel
24 x Jinko 620W N-Type
Solis S5-GR3P12K String Inverter
S5-GR3P12K
30-yr panel warranty

From · Solis inverter

RM 29,499

or RM 1,229/mo · 0% over 24 months

Monthly saving

RM 720

Payback

3.4 yrs

5 Solar + battery packages

For homeowners who also want backup storage, night usage support or future energy independence.

5 packages
Backup Power

Huawei Battery Starter

Entry Huawei solar with essential backup

6.82 kWp · 11 panels
Jinko 620W N-Type solar panel
11 x Jinko 620W N-Type
Huawei SUN2000-5K-MAP0 Hybrid Inverter
SUN2000-5K-MAP0
Solar battery storage
Huawei LUNA 7 kWh
Battery30-yr panel warranty

From · Huawei inverter

RM 44,498

or RM 1,854/mo · 0% over 24 months

Monthly saving

RM 210

Payback

17.7 yrs

Popular
Backup Power

Solis IntelliHome Plus

Solis hybrid solar with 16 kWh storage

8.68 kWp · 14 panels
Jinko 620W N-Type solar panel
14 x Jinko 620W N-Type
Solis S6-EH3P8K02-NV-YD-L Hybrid Inverter
S6-EH3P8K02-NV-YD-L
Solar battery storage
Solis IntelliHome 16 kWh
Battery30-yr panel warranty

From · Solis inverter

RM 40,298

or RM 1,679/mo · 0% over 24 months

Monthly saving

RM 320

Payback

10.5 yrs

Best Value
Backup Power

Huawei Battery Pro

Huawei solar with modular LUNA storage

10.54 kWp · 17 panels
Jinko 620W N-Type solar panel
17 x Jinko 620W N-Type
Huawei SUN2000-10K-MAP0 Hybrid Inverter
SUN2000-10K-MAP0
Solar battery storage
Huawei LUNA 14 kWh
Battery30-yr panel warranty

From · Huawei inverter

RM 63,498

or RM 2,646/mo · 0% over 24 months

Monthly saving

RM 400

Payback

13.2 yrs

Premium
Backup Power

Solis IntelliHome Max

Larger Solis solar with 16 kWh storage

12.4 kWp · 20 panels
Jinko 620W N-Type solar panel
20 x Jinko 620W N-Type
Solis S6-EH3P10K02-NV-YD-L Hybrid Inverter
S6-EH3P10K02-NV-YD-L
Solar battery storage
Solis IntelliHome 16 kWh
Battery30-yr panel warranty

From · Solis inverter

RM 45,498

or RM 1,896/mo · 0% over 24 months

Monthly saving

RM 470

Payback

8.1 yrs

Premium
Backup Power

Huawei Battery Ultimate

Large-home Huawei solar with modular storage

14.88 kWp · 24 panels
Jinko 620W N-Type solar panel
24 x Jinko 620W N-Type
Huawei SUN2000-12K-MAP0 Hybrid Inverter
SUN2000-12K-MAP0
Solar battery storage
Huawei LUNA 14 kWh
Battery30-yr panel warranty

From · Huawei inverter

RM 68,498

or RM 2,854/mo · 0% over 24 months

Monthly saving

RM 720

Payback

7.9 yrs

Rebate note: the announced Suria Rebate is RM600 per kWac and capped at RM3,000. Larger packages can still make sense for high-usage homes, but the rebate amount itself does not keep increasing past the cap.

Save details & WhatsApp about packagesSend your bill and roof photo if you want Trexon to recommend solar-only vs solar + battery.

Qualified Roof Types

Which residential homes qualify?

Suria Rebate applies to low-voltage residential consumers. Here is how the rebate scales across the three most common home layouts in Malaysia.

Terrace Homes solar installation
Up to 5 kWac (single phase)

Terrace Homes

Up to RM3,000 Rebate

Ideal for intermediate or corner terrace houses. Solar panels are aligned to maximize space on single or dual roof slopes.

Semi-Detached solar installation
8 – 10 kWac (three phase)

Semi-Detached

RM3,000 Max Rebate

Perfect for semi-d properties with wider roof spans. Allows for optimal layout orientation and battery storage additions.

Bungalows / Villas solar installation
10 – 15 kWac (three phase)

Bungalows / Villas

RM3,000 Max Rebate

Designed for large bungalow properties with high monthly bills. Achieves maximum solar offset and full RM3,000 rebate credit.

Likely eligibility signals

  • Malaysian citizen.
  • TNB individual customer under Domestic Tariff (excluding companies).
  • Solar PV system installed under Solar ATAP.
  • Application approved before new SuRIA approvals close on 31 December 2026, with the installation completed by the extended deadline of March 2027.
  • Have not received any prior cash rebate under the SolaRIS programme.
  • One rebate claim per registered TNB customer.
  • Rebate disbursement will be made to the local bank account belonging to the registered TNB customer.

Watch-outs before paying anyone

  • Commercial or industrial tariffs (non-domestic tariffs).
  • Homeowners who have already received a prior SolaRIS cash rebate.
  • Bank account details (Name/NRIC) that do not match the registered TNB customer.
  • Any party/provider misusing the application (PETRA will blacklist offenders).

Trexon will not describe the rebate as guaranteed before the official process confirms eligibility. The urgency is real, but the paperwork still has to be clean.

Approvals close 31 Dec 2026 · install by March 2027 if approved

What happens after Trexon confirms fit.

The first step is a free eligibility screen. If the bill, roof and timing make sense, Trexon can then move quickly on survey, design, Solar ATAP preparation and installation planning.New SuRIA approvals close on 31 December 2026, and approved applications have until March 2027 to complete the installation.

01Next

Check the bill and roof

Trexon screens your monthly TNB bill, property type, roof surface, account details, and likely Solar ATAP system size.

02Next

Confirm fit before paying

Trexon checks your bill, roof and timeline first. The RM2,000 booking fee is optional at intake and only used when you want to hold scheduling.

03Next

Site assessment and proposal

We verify the roof, inverter location, meter condition, panel count, access constraints, and expected savings.

04Next

Solar ATAP application path

Trexon prepares the Solar ATAP submission path and tracks the official rebate process once SEDA and TNB open registration.

05

Install within the deadline

New SuRIA approvals close on 31 December 2026, and approved applications have until March 2027 to complete the installation.

Need to confirm before paying?

Save your details first, then open WhatsApp with your lead reference so BD can track the request.

Save details first
Free eligibility check before any payment

Check your Suria Rebate fit with Trexon first.

Submit your property and timeline details, then upload your bill in your customer dashboard so Trexon can screen eligibility before you pay anything. If you already want to reserve scheduling, the RM2,000 booking option is still available and is credited toward your solar project.

Dashboard first

Upload your bill and roof photos for review before payment.

Rebate-ready intake

We capture bill, property and TNB details needed for fast screening.

1-3 month cap

This booking path is for homeowners ready to move now, not long-horizon browsing.

Clear terms

RM2,000 is optional at intake and only reserves Trexon scheduling.

Booking form

SuRIA Rebate slot request

Booking fee

RM 2,000

The booking fee is optional and paid on DOKU's secure page, credited in full to your project. Trexon will verify site details, Solar ATAP fit, and official rebate documentation before final project approval.

Details homeowners ask

Suria Rebate FAQ

What is SuRIA Home?

Sustainable Rebate & Incentive Assistance (SuRIA) Home is an official incentive programme launched by the Government (PETRA) to help domestic consumers reduce electricity costs through rooftop solar PV system installations under the Solar ATAP scheme.

How much rebate will I receive?

You will receive RM600 for every 1 kWac of Declared Installed Capacity (as stated on your Solar ATAP certificate), up to a maximum rebate of RM3,000 (which is capped at 5 kWac of capacity). Systems larger than 5 kWac are eligible but the rebate value remains capped at RM3,000.

Who is eligible for the SuRIA Home rebate?

You are eligible if you meet all of the following: 1) Malaysian citizen. 2) TNB individual customer under Domestic Tariff (excluding companies). 3) Application approved before new approvals close on 31 December 2026, with the installation completed by the extended deadline of March 2027. 4) Have not received any prior cash rebate under the SolaRIS programme. Each customer is entitled to one (1) rebate only.

When does the SuRIA Home programme end?

The rebate is allocated on a first-come, first-served basis from 1 June 2026. The government has extended the SuRIA installation deadline to March 2027 for approved applications. New approvals still close on 31 December 2026, and approval is the government's decision, not ours. The rebate is paid by the government to the TNB account holder after installation, subject to eligibility and available funds. Trexon cannot promise it.

How is the rebate disbursed to registered customers?

The cash rebate will be transferred directly to the preferred local bank account of the registered TNB customer within seven (7) working days after verification. Once commissioned, you will receive an email from TNB to submit your local bank account details. The bank details (Name & NRIC) must match the registered TNB customer name.

Can I use a joint bank account for the rebate?

Yes. A joint bank account is allowed, provided that the TNB-registered customer is the principal account holder of that joint bank account, and the NRIC/name matching verification passes.

Does paying Trexon's RM2,000 booking fee guarantee the rebate?

No. The RM2,000 booking fee reserves your Trexon scheduling and is credited toward your solar installation. The government rebate remains subject to official eligibility, successful Solar ATAP commissioning with TNB, SEDA and TNB claim verification, and quota availability.

Install deadline now March 2027 for approved applications; new approvals close 31 Dec 2026.

New SuRIA approvals close on 31 December 2026, and approved applications have until March 2027 to complete the installation. Wait if you are not ready to share your bill, property details, and a near-term installation timeline.