From quick walkthrough assessments to investment-grade feasibility studies.Choose the precision level that matches your project scale.
In-depth analysis with actual metering data, providing actionable insights and guaranteed ROI projections for major upgrades.
Choose the right audit level for your project scale and objectives
| CRITERIA | LEVEL 1 Walkthrough Audit | LEVEL 2 Detailed Energy Audit | LEVEL 3 Investment Grade Audit |
|---|---|---|---|
| Duration | 1-2 days | 2-4 weeks | 4-8 weeks |
| Investment Range | RM 2,000 - 5,000 | RM 15,000 - 50,000 | RM 50,000 - 150,000 |
| Savings Potential | 5% | 30% | 70% |
| Financing Ready | — | Partial |
Our energy audit specialists will help you select the right audit level and begin identifying immediate savings opportunities.
Malaysian energy audits are governed by the Efficient Management of Electrical Energy Regulations 2008 (EMEER) and aligned with ASEAN Energy Efficiency and Conservation standards. Understanding the regulatory landscape helps you choose the right audit level — and avoid compliance penalties.
Under EMEER 2008, any Designated Consumer — defined as a facility with 3 consecutive months of electricity consumption exceeding 1,638,000 kWh or an annual average demand above 2,250 kVA — must register with the Energy Commission and submit an energy audit report every 3 years. Penalties for non-compliance include fines up to RM 100,000 and criminal prosecution.
An auditor visits your facility, walks every floor, reviews 12 months of TNB bills, identifies obvious energy waste (lights left on, inefficient chillers running at wrong setpoints, compressed air leaks), and delivers a prioritised recommendation list — typically within one week of the site visit. No metering equipment is installed.
Temporary sub-meters are installed at key distribution boards for 1–2 weeks to capture real load profiles, demand peaks, and equipment-level consumption. The data is modelled against your operational schedule and utility tariff to produce verified cost-benefit analyses for each recommended Energy Conservation Measure (ECM). This level is required for GITA tax incentive documentation.
An ASHRAE Level 3 compliant study with extended monitoring (minimum 4 weeks), detailed engineering calculations, life cycle cost analysis, and a full Measurement & Verification (M&V) plan. The output is a bankable document: banks and ESCOs accept it as the basis for project financing, performance contracting, and green bond eligibility. Required for GBI Platinum/Gold certification applications.