Skip to main content
Skip to main content

Model your project savings and peak-demand reduction

Calculate ROI
Printing & Packaging Solar — Malaysia 2026

Printing & Packaging Solar Malaysia 2026

Offset and digital presses run hot shifts with high ancillary loads — corporate clients with ESG procurement policies are now requiring sustainable print suppliers.

Illustrative concept of a Malaysian printing & packaging facility with rooftop solar panels
Illustrative solar concept · Printing & Packaging

RM 60K – RM 180K

Typical monthly TNB bill

80–160 kWp

Typical system size

60%

GITA tax allowance eligibility (subject to MGTC verification)

Why Printing & Packaging Needs Solar Now

60% GITA Tax Allowance

Malaysia's Green Investment Tax Allowance (GITA) offers an investment tax allowance equal to 60% of qualifying solar capital expenditure, offset against up to 70% of statutory income in the year of assessment, for expenditure incurred before 31 December 2026. Indicative only. Subject to MGTC verification, applicable tax law and confirmation by the customer’s licensed tax adviser. The system must be commissioned and the GITA Asset application submitted to MGTC by 31 December 2026.

TNB Tariffs Are Structured, Not Flat

Non-Domestic Low Voltage (formerly Tariff D) customers pay a combined RM 0.5068/kWh (energy, capacity and network charges) plus the 1.6% KWTBB levy — TNB Commercial & Industrial Pricing & Tariffs, schedule stamped 2025-07-01. Medium- and high-voltage accounts are on different rates (for example MV General at RM0.2983/kWh energy charge) and add a maximum-demand charge read from your bill, so the RM 0.5068/kWh figure is a low-voltage assumption only. Solar generation offsets the energy component directly, for as long as the system runs.

60% GITA Tax Allowance — Window Closes 31 December 2026

Qualifying solar capital expenditure incurred before 31 December 2026 may claim an investment tax allowance equal to 60% of qualifying capex, offset against up to 70% of statutory income in the year of assessment. Indicative only. Subject to MGTC verification, applicable tax law and confirmation by the customer’s licensed tax adviser. The system must be commissioned and the GITA Asset application submitted to MGTC by 31 December 2026.

Get a GITA + Roof Capacity Screening

Share your bill, roof size and timeline. An engineer reviews your factory case.

GITA-eligible?
Aerial view of a factory metal roof covered with rows of solar panels and a maintenance walkway
Illustrative engineering scenario

Modelled example for a printing & packaging facility

Not a customer case study. Every figure below is arithmetic on Trexon's yield basis (3.5 peak sun hours, 105 kWh per kWp per month) and this vertical's own stated typical system-size band, applied at the Non-Domestic Low Voltage (formerly Tariff D) energy rate. Your facility's actual tariff class, load profile and savings depend on a site assessment of your TNB bill.

Modelled system size120 kWp — mid-point of this vertical's typical band
Load profile assumptiontwo-shift operation, 80% assumed self-consumption (best case)
Modelled monthly generation12,600 kWh
Modelled self-consumed energy10,080 kWh/month
Modelled monthly bill offsetRM 5K at the Non-Domestic Low Voltage rate (RM0.5068/kWh)
Modelled annual bill offsetRM 61K

A system this size may also qualify for the Green Investment Tax Allowance (GITA): an investment tax allowance equal to 60% of qualifying solar capital expenditure, offset against up to 70% of statutory income in the year of assessment, for expenditure incurred before 31 December 2026. Read the full GITA tax incentive guide.

Indicative only. Subject to MGTC verification, applicable tax law and confirmation by the customer’s licensed tax adviser. The system must be commissioned and the GITA Asset application submitted to MGTC by 31 December 2026. Tariff schedule stamped 2025-07-01.