Skip to main content
Skip to main content

Build your solar plan — no payment until you approve

Configure solar
Solar ATAP 2026 Compliant

Electronics (EMS)
Energy Benchmark

Cleanroom AC and assembly lines run 24/7. Updated for the new 2026 SMP-based credit guidelines.

Tariff: MV General
Max Capacity: 100% of MD, up to 1,000 kWac

Electronics (EMS) Energy Benchmark

Compare your facility against the Malaysian average for electronics (ems) and calculate your solar ROI.

Why Solar for Electronics (EMS)?

Intense pressure from global clients to adopt renewable energy.

New for 2026: SMP Credits

Under the Solar ATAP guidelines, exported energy is now valued at the System Marginal Price (Average SMP). Trexon optimizes your system size to maximize direct consumption, shielding you from lower export rates.

ATAP 2026 Benefits

  • Maximize self-consumption at full TNB retail rates.
  • Size the system to your daytime load so most output is used on site.
  • Financing options for qualified manufacturers, starting with a RM2,000 booking.
  • Direct offset of current month billing (No carry-forward risk).

Ready to optimize?

Skip the guesswork. Get a bank-ready engineering proposal based on your exact factory footprint and TNB load profile.

Request 3D Roof Audit

How we calculate this

This benchmark is an illustrative estimate based on typical industry energy profiles in Malaysia. We factor in:

  • Industry-specific kWh/sqft averages
  • TNB tariff (MV General) energy and demand rates
  • Peak Demand (MD) characteristics
  • Jinko 620W panel output

How to use the Electronics (EMS) benchmark

Enter your facility's floor area in the calculator above. It estimates monthly electricity use from the typical energy intensity for electronics (ems) (150 kWh per sq ft per year), applies the E1 tariff basis shown at the top of the page, and returns an indicative solar size and monthly saving.

Treat the result as a first estimate, not a quotation. Your own bills will differ because of operating hours, production changes and maximum demand. For a firmer view, gather your latest electricity bills (preferably 12 months), a roof or site plan and, if you have it, a single-line diagram. Our commercial worksheets list everything to collect.

Under Solar ATAP, exported energy is credited at the programme rate and unused export credit is forfeited each month, so a system is best sized to your daytime load. Trexon does not offer PPAs. Commercial projects are priced after a site review, and the RM100 commercial site survey is credited in full against your project.