Model your project savings and peak-demand reduction
Calculate ROISolar Solutions for STEM & Technology Companies
Power your innovation with clean energy. Cut electricity costs for data centers, tech parks, R&D labs, and semiconductor facilities — without compromising uptime or power quality.
Typical STEM Facility
200-500 kWp System
Per site
Monthly Savings
Per site
25-Year Savings
Energy Challenges Facing STEM Companies
High-tech operations demand reliable, affordable power — but electricity is a major cost while uptime requirements stay strict.
The Problem
High 24/7 Base Load
Servers, cleanrooms, and lab equipment running non-stop drive electricity bills to RM 50,000-200,000+ monthly
The Solution
Solar offsets part of the daytime load, with battery storage to carry selected loads after sunset
The Problem
Rising TNB Tariffs Eating R&D Budgets
Every 10% tariff hike redirects RM 60,000-240,000/year from innovation to electricity bills
The Solution
Reduce exposure to TNB tariff increases by generating part of your own electricity
The Problem
ESG Reporting Requirements
Investors, clients, and regulators increasingly demand carbon reduction and sustainability metrics
The Solution
Solar provides measurable, auditable ESG data
The Problem
Power Quality for Sensitive Equipment
Semiconductor fabs, biotech labs, and data centers cannot tolerate voltage sags or outages
The Solution
UPS-compatible design with clean power output that works alongside your existing UPS
Solar Solutions by STEM Sector
Tailored system designs for every type of technology and science facility in Malaysia.
Technology Parks & Innovation Hubs
Multi-tenant tech parks, co-working spaces, startup incubators
Technology Park Malaysia, MRANTI, Cyberjaya tech hubs
100-300 kWp
System Size
RM 3,100-9,400/month
Monthly Savings (illustrative, MV energy charge only)
Data Centers & Server Farms
Co-location facilities, cloud infrastructure, enterprise data centers
Tier III/IV facilities, hyperscale edge nodes
200-1,000 kWp
System Size
RM 6,300-31,300/month
Monthly Savings (illustrative, MV energy charge only)
R&D Laboratories & Biotech
Pharmaceutical labs, biotech startups, agricultural research centers
Bio Valley, pharma manufacturing, clinical research
50-200 kWp
System Size
RM 1,600-6,300/month
Monthly Savings (illustrative, MV energy charge only)
Semiconductor & Advanced Manufacturing
Chip fabs, PCB assembly, precision electronics manufacturing
Penang semiconductor corridor, E&E manufacturers
300-1,000 kWp
System Size
RM 9,400-31,300/month
Monthly Savings (illustrative, MV energy charge only)
Engineering & Design Firms
Software houses, architecture firms, engineering consultancies
Office buildings, design studios, testing facilities
30-100 kWp
System Size
RM 900-3,100/month
Monthly Savings (illustrative, MV energy charge only)

Why STEM Companies Choose Solar
Beyond cost savings — solar fits the innovation-driven culture of technology and science companies.
Reduce OpEx, Redirect to R&D
Cut electricity bills and reinvest savings into core research and innovation
GITA 60% Tax Allowance
Green Investment Tax Allowance (GITA Asset, Tier 2): 60% of qualifying solar capex, set off against up to 70% of statutory income. Commission and submit to MGTC by 31 December 2026
ESG Compliance for Investors
Measurable carbon reduction data for sustainability reports, ESG ratings, and stakeholder reporting
UPS-Compatible Design
Engineered to integrate with existing UPS and backup systems — designed to avoid disruption to sensitive equipment
Real-Time Monitoring Dashboard
API-accessible monitoring with live generation data, consumption analytics, and ROI tracking
Generation Data for Carbon Reporting
Solar generation data you can use in carbon reporting; certification is by an independent body
Implementation Process
Planned to minimise disruption to your operations. Every phase is designed around your uptime requirements.
Energy Audit & Load Analysis
Comprehensive load profiling, power quality assessment, and UPS compatibility review
System Design & Engineering
Custom PV layout, inverter sizing, battery integration design, and grid connection planning
Installation (Off-Peak / Weekends)
Professional installation scheduled during low-activity periods to maintain operations
Commissioning & API Integration
System activation, monitoring API setup, BMS integration, and operations team training
Flexible Financing for STEM Facilities
Multiple funding options to match your capital allocation strategy — from hire purchase to outright purchase.
Hire Purchase
Hire purchase through Mitsubishi HC Capital Malaysia; rates and term are set by the lender. Starts with the booking (20% of the system price, capped at RM20,000).
GITA Tax Allowance
Claim a 60% tax allowance on qualifying expenditure, set off against up to 70% of statutory income; unused allowance carries forward
Bank Green Loans
Bank solar financing, e.g. the Maybank Solar PV loan; rates and tenure are set by the bank
Card 0% Instalments
0% instalments up to 24 months on participating bank cards
Explore More Solutions
Get a Custom Solar Proposal for Your STEM Facility
Request a commercial solar assessment. Our commercial team will review the submitted project details during business hours.
- Sizing from your 12 months of TNB bills and shift pattern
- Roof, switchboard and single-line diagram reviewed by our engineers
- Available incentives (GITA for solar, subject to MGTC verification) and Solar ATAP eligibility checked for your premises
- SEDA-registered PV Service Provider (RPVSP-2026/373) · SSM 201301044881 (1074704-D)
Prefer to talk first? Message our commercial team on WhatsApp.
WhatsApp UsPower Your Innovation with Solar
Cut electricity costs at your tech park or R&D facility with solar. RM500 commercial site survey with a written report (credited in full when you proceed) — no obligation.