Skip to main content
Skip to main content

Model your project savings and peak-demand reduction

Calculate ROI
For STEM & Technology Companies

Solar Solutions for STEM & Technology Companies

Power your innovation with clean energy. Cut electricity costs for data centers, tech parks, R&D labs, and semiconductor facilities — without compromising uptime or power quality.

SEDA Documentation Support
TNB Application Support
References On Request
On-site solar generation
UPS-compatible design
Payback modelled per site

Typical STEM Facility

200-500 kWp System

Per site

Monthly Savings

Per site

25-Year Savings

Payback PeriodModelled per site (before GITA)
GITA Tax Benefit60% Allowance
Panel Performance Warranty30 Years

Energy Challenges Facing STEM Companies

High-tech operations demand reliable, affordable power — but electricity is a major cost while uptime requirements stay strict.

The Problem

High 24/7 Base Load

Servers, cleanrooms, and lab equipment running non-stop drive electricity bills to RM 50,000-200,000+ monthly

The Solution

Solar offsets part of the daytime load, with battery storage to carry selected loads after sunset

The Problem

Rising TNB Tariffs Eating R&D Budgets

Every 10% tariff hike redirects RM 60,000-240,000/year from innovation to electricity bills

The Solution

Reduce exposure to TNB tariff increases by generating part of your own electricity

The Problem

ESG Reporting Requirements

Investors, clients, and regulators increasingly demand carbon reduction and sustainability metrics

The Solution

Solar provides measurable, auditable ESG data

The Problem

Power Quality for Sensitive Equipment

Semiconductor fabs, biotech labs, and data centers cannot tolerate voltage sags or outages

The Solution

UPS-compatible design with clean power output that works alongside your existing UPS

Solar Solutions by STEM Sector

Tailored system designs for every type of technology and science facility in Malaysia.

Technology Parks & Innovation Hubs

Multi-tenant tech parks, co-working spaces, startup incubators

Technology Park Malaysia, MRANTI, Cyberjaya tech hubs

100-300 kWp

System Size

RM 3,100-9,400/month

Monthly Savings (illustrative, MV energy charge only)

Data Centers & Server Farms

Co-location facilities, cloud infrastructure, enterprise data centers

Tier III/IV facilities, hyperscale edge nodes

200-1,000 kWp

System Size

RM 6,300-31,300/month

Monthly Savings (illustrative, MV energy charge only)

R&D Laboratories & Biotech

Pharmaceutical labs, biotech startups, agricultural research centers

Bio Valley, pharma manufacturing, clinical research

50-200 kWp

System Size

RM 1,600-6,300/month

Monthly Savings (illustrative, MV energy charge only)

Semiconductor & Advanced Manufacturing

Chip fabs, PCB assembly, precision electronics manufacturing

Penang semiconductor corridor, E&E manufacturers

300-1,000 kWp

System Size

RM 9,400-31,300/month

Monthly Savings (illustrative, MV energy charge only)

Engineering & Design Firms

Software houses, architecture firms, engineering consultancies

Office buildings, design studios, testing facilities

30-100 kWp

System Size

RM 900-3,100/month

Monthly Savings (illustrative, MV energy charge only)

A Malaysian school block with rooftop solar panels and a playing field in front

Why STEM Companies Choose Solar

Beyond cost savings — solar fits the innovation-driven culture of technology and science companies.

Reduce OpEx, Redirect to R&D

Cut electricity bills and reinvest savings into core research and innovation

GITA 60% Tax Allowance

Green Investment Tax Allowance (GITA Asset, Tier 2): 60% of qualifying solar capex, set off against up to 70% of statutory income. Commission and submit to MGTC by 31 December 2026

ESG Compliance for Investors

Measurable carbon reduction data for sustainability reports, ESG ratings, and stakeholder reporting

UPS-Compatible Design

Engineered to integrate with existing UPS and backup systems — designed to avoid disruption to sensitive equipment

Real-Time Monitoring Dashboard

API-accessible monitoring with live generation data, consumption analytics, and ROI tracking

Generation Data for Carbon Reporting

Solar generation data you can use in carbon reporting; certification is by an independent body

Implementation Process

Planned to minimise disruption to your operations. Every phase is designed around your uptime requirements.

Phase 1

Energy Audit & Load Analysis

Comprehensive load profiling, power quality assessment, and UPS compatibility review

1-2 weeks
Phase 2

System Design & Engineering

Custom PV layout, inverter sizing, battery integration design, and grid connection planning

2-3 weeks
Phase 3

Installation (Off-Peak / Weekends)

Professional installation scheduled during low-activity periods to maintain operations

3-6 weeks
Phase 4

Commissioning & API Integration

System activation, monitoring API setup, BMS integration, and operations team training

1-2 weeks

Flexible Financing for STEM Facilities

Multiple funding options to match your capital allocation strategy — from hire purchase to outright purchase.

Set by the lender

Hire Purchase

Hire purchase through Mitsubishi HC Capital Malaysia; rates and term are set by the lender. Starts with the booking (20% of the system price, capped at RM20,000).

60% tax allowance

GITA Tax Allowance

Claim a 60% tax allowance on qualifying expenditure, set off against up to 70% of statutory income; unused allowance carries forward

Ask your bank

Bank Green Loans

Bank solar financing, e.g. the Maybank Solar PV loan; rates and tenure are set by the bank

Up to 24 months

Card 0% Instalments

0% instalments up to 24 months on participating bank cards

Commercial Solar

Get a Custom Solar Proposal for Your STEM Facility

Request a commercial solar assessment. Our commercial team will review the submitted project details during business hours.

  • Sizing from your 12 months of TNB bills and shift pattern
  • Roof, switchboard and single-line diagram reviewed by our engineers
  • Available incentives (GITA for solar, subject to MGTC verification) and Solar ATAP eligibility checked for your premises
  • SEDA-registered PV Service Provider (RPVSP-2026/373) · SSM 201301044881 (1074704-D)

Prefer to talk first? Message our commercial team on WhatsApp.

WhatsApp Us

Send your project brief

Tell us about the site and we will prepare an education solar proposal priced per project from your bills.

Mobile or office line

You can also upload these in your dashboard after submitting, or send them on WhatsApp.

By submitting you agree to be contacted about this project.

GITA Support | UPS Compatible | 30-Year Panel Performance Warranty

Power Your Innovation with Solar

Cut electricity costs at your tech park or R&D facility with solar. RM500 commercial site survey with a written report (credited in full when you proceed) — no obligation.

Protected Connection
Gateway Payment
Terms Confirmed Before Payment
Server-Verified PricingOrder-Specific Payment RecordDashboard Order Tracking