Define the objective

  • Maximum-demand control
  • Solar self-consumption
  • Critical-load resilience
  • Energy arbitrage
  • Combined operating objective

Load evidence

  • Recent electricity bills
  • Interval or half-hourly load data
  • Peak-demand timing and duration
  • Critical-load capacity and autonomy
  • Existing solar-generation profile

Electrical and site constraints

  • Transformer and switchboard capacity
  • Protection and interconnection information
  • Available indoor or outdoor space
  • Fire, access and environmental constraints
  • Single-line diagram if available

Commercial model inputs

  • Project horizon and required return method
  • Equipment and maintenance responsibility
  • Operating and dispatch ownership
  • Measurement and verification method
  • Decision timeline and stakeholders