Configure solarAir Itam Electronics Factory: RM74,000/Year Savings via Peak Shaving + Solar
Bill Reduction
8%
Annual Savings
RM 74,160
Payback
6.2 years (reduced to 4.1 years after GITA tax benefit)
CO2 Offset
285 tons/year
The Challenge
High Maximum Demand charges (RM52k/month) due to CNC machines and peak-hour production. Monthly electricity costs exceeded RM78,000 despite energy audits.
Monthly Bill (Before)
RM 78,420
Annual Cost (Before)
RM 941,040
Pain Points:
- •Maximum Demand charges: RM52,000/month (66% of bill)
- •Peak production during TNB peak hours (8am-10pm)
- •Unable to shift production schedule due to 24/7 orders
- •Previous energy audit found no actionable savings
- •Competitor in Bayan Lepas using solar—competitive disadvantage
The Solution
System Size
250 kW Solar + 150 kWh Battery (BESS)
Installation Time
12 days
Solar Panels:
JinkoSolar Tiger Neo (580W, 432 panels)
Inverter:
SMA Sunny Tripower CORE2 (250kW) + 150kWh LFP Battery
Special Features:
- AI-powered peak shaving algorithm
- Battery charges during solar peak, discharges during demand spikes
- Real-time MD monitoring and alerts
- GITA (Green Investment Tax Allowance) optimized—RM360k tax savings
The Results
Monthly Bill (After)
RM 72240
Annual Savings
RM 74,160
ROI
16% IRR (24% IRR post-GITA)
Environmental Impact:
285 tons/year (equivalent to removing 62 cars from roads)
TNB Bill Breakdown Analysis
Before Solar
After Solar
12-Month Performance
“The peak shaving system from Trexon transformed our cost structure. RM6,180/month in direct savings, but the real win is competitive pricing—we can now bid 5% lower than competitors still on full grid. The GITA tax benefit was RM360k—that alone justified the investment.”
Dato' Tan Chee Keong
Managing Director, Penang Assembly Solutions