Skip to main content

Build your solar plan β€” no payment until you approve

Configure solar
RM100 booking credit

Book your solar site survey

Pay RM100 to reserve an engineer slot. The full credit is applied to your first Trexon project payment when you proceed.

SEDA-registeredHomes and businessesWhatsApp confirmation

Your RM100 is protected

It is fully credited when you proceed, or refunded if Trexon cannot serve your address or you cancel at least 24 hours ahead.

Property type *
Preferred window *
Preferred time slot *

Booking fee

Credited to your install invoice

RM 100

Fully credited β€” every RM 100 comes off your installation. Refunded in full if we can't serve your address, or if you cancel at least 24 hours ahead.

SenangPay and DOKU payment gateway

Your RM 100 payment is completed on the secure hosted gateway. Available methods are shown there.

Trexon does not store your card or online-banking credentials Β· your dashboard link is emailed after payment.

What happens during your site survey

A certified Trexon solar engineer visits your property (typically Day 1-3 after booking) to assess roof condition, shading, orientation, and your existing electrical infrastructure. This is the same site survey step that begins our full installation process, which runs from site survey to TNB grid connection.

Roof assessment

Comprehensive roof structural assessment, shading, and orientation check.

Electrical review

Your existing electrical panel and infrastructure are checked for solar integration.

What you receive

A Site Survey Report, a 3D system design, and a detailed quotation.

See the complete installation timeline or how Trexon works, start to finish.